Article
Publication date: 14 March 2024

Umer Zaman, Laura Florez-Perez, Saba Abbasi and Muhammad Shahid Nawaz

Organizations are full of contradictions and leadership dilemmas. Managers often face challenges such as selecting between two contradicting options such that which one is more…

127

Abstract

Purpose

Organizations are full of contradictions and leadership dilemmas. Managers often face challenges such as selecting between two contradicting options such that which one is more important can hardly be judged. To manage contradicting dynamics, today’s managers can adopt the paradoxical leadership approach. We build a theoretical model to investigate the influence of paradoxical leadership on multi-dimensional project agility (proactivity, adaptability, and resilience), and multi-dimensional project success (management, investment, and ownership success).

Design/methodology/approach

Drawing on survey-based data from the China–Pakistan Economic Corridor (CPEC) megaproject (N = 209), we performed covariance-based structural equation modeling to test the conceptual model.

Findings

The findings show that (1) paradoxical leadership has a significant positive impact on megaproject success, (2) paradoxical leadership has a significant positive influence on project agility, (3) project agility has a significant positive effect on megaproject success, and (4) project agility has a significant effect that mediates the link between paradoxical leadership and megaproject success. This research provides a theoretical and practical comprehension of paradoxical leadership with a new perspective on megaprojects.

Originality/value

This study provides an extension of the existing studies on paradoxical leadership and identifies the role of contradicting dynamics and their impact on multiple facets of megaproject success. It not only clarifies the relationship between paradoxical leadership and megaproject success, but also identifies the mediating role of project agility that can play an effective role in mobilizing success in megaprojects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 December 2021

Millicent Asah-Kissiedu, Patrick Manu, Colin Anthony Booth, Abdul-Majeed Mahamadu and Kofi Agyekum

For construction organisations to be effective at implementing an integrated safety, health and environmental (SHE) management system, they require the right level of…

Abstract

Purpose

For construction organisations to be effective at implementing an integrated safety, health and environmental (SHE) management system, they require the right level of organisational capability. This capability includes the policies, systems and resources of the organisation. However, within the academic literature, it is unclear which organisational attributes of construction companies are important for implementing integrated SHE management. This study aims to explore the organisational attributes that determine integrated SHE management capability and their relative priorities.

Design/methodology/approach

The study used a literature review supported by expert verification and a subsequent three-round expert Delphi technique accompanied by applying the voting analytical hierarchy process.

Findings

The study identified 20 attributes grouped under five main thematic categories. These are strategy (the organisation’s vision and top management commitment); process (the organisation’s procedures and processes for SHE management); people (organisation’s human resources, their competence, roles, responsibilities and involvement in SHE management); resources (organisation’s physical and financial resources for SHE management) and information (SHE related documents, data, records and their communication across an organisation). While these thematic categories and the attributes within carry different weights of importance, the strategy-related attributes are the most important, followed by the people-related attributes.

Originality/value

The results of this study should enable construction companies and key industry stakeholders to understand construction companies’ capability to successfully implement an integrated SHE management system. Furthermore, construction companies should be able to prioritise efforts or investments to enhance their SHE management capability.

Article
Publication date: 2 February 2022

Kenneth Lawani, Luis Alfredo Arias Abad, Nigel Craig, Billy Hare and Iain Cameron

Emotional intelligence (EI) and conflict management (CM) are essential skills for construction managers towards achieving organisational effectiveness. It is believed that an…

Abstract

Purpose

Emotional intelligence (EI) and conflict management (CM) are essential skills for construction managers towards achieving organisational effectiveness. It is believed that an individual’s EI level (EIL) is a predictor of the preferred CM styles (CMS). This study aims to explore the relationships between EIL, preferred CMS and demographic factors in the construction sector of the Dominican Republic (DR).

Design/methodology/approach

The EIL and CMS of a sample of civil engineers in managerial positions were evaluated using the emotional intelligence appraisal and Rahim Organizational Conflict Inventory-II self-assessment tools.

Findings

There was a strong positive correlation between the rated EIL and the scores of collaboration and compromise styles, i.e. participants with higher EIL have stronger fit within the collaboration and compromise styles of managing conflicts. For participants with lower EIL, collaboration and compromise styles were also top preferences, but with no statistical significance. Significant relationships existed between gender, collaboration and compromise styles and between work experience and collaboration style. No significant relationship between demographics and EIL.

Practical implications

The construction industry needs innovative construction managers whose CMS and EIL are compatible with the culture and overall organisational objectives.

Originality/value

To the best of the authors’ knowledge, this is the first study appraising the EI and CMS of civil engineers working in DR construction industry.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 November 2022

Esra Dobrucali, Sevilay Demirkesen, Emel Sadikoglu, Chengyi Zhang and Atilla Damci

Construction safety is heavily affected by using new technologies in this growing trend of technology adoption. Especially, safety performance is enhanced through the utilization…

1567

Abstract

Purpose

Construction safety is heavily affected by using new technologies in this growing trend of technology adoption. Especially, safety performance is enhanced through the utilization of some effective technologies such as artificial intelligence, virtual reality, BIM and wearable devices. Therefore, the main purpose of this study is to investigate the influence of emerging technologies on construction safety performance and quantify the relationship between those. The proposed components of emerging technologies are BIM, GIS, VR, RFID, AI, ML, eye tracking and serious games and wearable devices, whereas the dimensions of construction safety performance are safety planning, safety training, safety inspection and monitoring, safety audits and reviews and safety leadership.

Design/methodology/approach

A structural model was composed consisting of emerging technologies and safety performance indicators. Then, a questionnaire was designed and administered to construction professionals, and data from 167 projects were analyzed using structural equation modeling. The data were analyzed by using software, called SPSS AMOS.

Findings

The analysis of the structural model proves that there is a positive and significant relationship between emerging technologies and construction safety performance. Moreover, the factor loadings for each factor were found to be high indicating a good representation of the construct by the components developed. Among the technologies, BIM, robotics and automation, AI and wearable devices were detected to be the most significant technologies in terms of impacting safety performance.

Originality/value

The study contributes to the body of knowledge in that it develops a conceptual framework consisting of specific technologies in terms of emerging technologies, reveals the impact of such technologies on safety performance and proposes several tools and strategies for enabling effective safety management along the project lifecycle. Industry practitioners may benefit from the framework developed by adopting such technologies to enhance their safety performance on construction projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 January 2022

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu and David Edwards

Even though emotional intelligence (EI) is reported to have many benefits, yet it remains mainly unexplored in the construction industry. This paper aims to present a critical…

Abstract

Purpose

Even though emotional intelligence (EI) is reported to have many benefits, yet it remains mainly unexplored in the construction industry. This paper aims to present a critical review of EI research in the construction industry.

Design/methodology/approach

Search of literature was conducted by using Scopus engine. Relevant keywords were used to discover 146 publications. The titles, abstracts, keywords and full texts of the publications were examined to finally select 48 publications that were relevant. Scientometric analysis was undertaken with the aid of VOSViewer. Content analysis systematically reviewed the key themes.

Findings

The five topmost countries conducting research into EI in the construction industry are UK, Australia and the USA. The most influential authors in construction EI research are Goleman, D., Salovey, P. and Mayer, J.D. The significant impact of EI on leadership in the construction industry were that EI boosted transformational leadership style and EI influenced use of management-by-exception active style by construction leaders. Furthermore, EI leads to resilience against stress and EI enhances stress tolerance were the significant roles of EI on stress management.

Research limitations/implications

A limitation is in the number of publications reviewed. In spite of the critical review, the number of publications reviewed may not be exhaustive.

Practical implications

This research enhances knowledge and stimulates a deeper comprehension of EI research and also provides recommendations for further studies based on identified research gaps.

Originality/value

As a pioneering study that combines scientometrics and systematic review for EI research, this study enhances knowledge on EI in the construction industry.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 4 December 2023

Nnedinma Umeokafor, Abimbola Windapo and Oluwole Alfred Olatunji

The purpose of this study is to investigate the influences of the characteristics of procurement strategies, in this instance labour-only, on project performance concerning health…

Abstract

Purpose

The purpose of this study is to investigate the influences of the characteristics of procurement strategies, in this instance labour-only, on project performance concerning health and safety (H&S), a project performance indicator.

Design/methodology/approach

Using non-probability purposeful and snowballing sampling methods, questionnaires were used to collect data from construction professionals in Nigeria. This was then analysed using descriptive (frequency and mean scores) and inferential statistics (Mann–Whitney-U and Kendall's Tau_b tests).

Findings

The findings indicate a statistically significant negative correlation between ‘the level of client involvement and ‘fatalities' and a positive one with ‘conducting of health and safety risk assessment' and ‘conducting employee surveys on health and safety attitude’. Poor hygiene is found to be the worst lagging indicator, while conducting of inspection is the most adopted leading indicator of project health and safety performance. It also emerged that there is no significant difference in the health and safety performance of projects procured through the procurement strategy in urban and rural areas.

Practical implications

The study provides valuable insight into the complexities in H&S management due to the high level of client involvement in labour-only procurement system (LoPS) projects and the level of diversity in their responsibilities therein. It creates a fundamental direction for developing a detailed framework or guidance notes for client involvement in the integration of H&S into LoPS projects.

Originality/value

This is the first study that examines the influence of the characteristics of procurement strategy on project health and safety performance. Evidence in the literature shows that project delivery outcomes significantly improve if procurement is strategically used, including when it is considered early in projects. However, integrating H&S into procurement strategies has received little attention.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 26 May 2023

Mpho Trinity Manenzhe, Arnesh Telukdarie and Megashnee Munsamy

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

2047

Abstract

Purpose

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

Design/methodology/approach

The extant literature in physical assets maintenance depicts that poor maintenance management is predominantly because of a lack of a clearly defined maintenance work management process model, resulting in poor management of maintenance work. This paper solves this complex phenomenon using a combination of conceptual process modeling and system dynamics simulation incorporating 4IR technologies. A process for maintenance work management and its control actions on scheduled maintenance tasks versus unscheduled maintenance tasks is modeled, replicating real-world scenarios with a digital lens (4IR technologies) for predictive maintenance strategy.

Findings

A process for maintenance work management is thus modeled and simulated as a dynamic system. Post-model validation, this study reveals that the real-world maintenance work management process can be replicated using system dynamics modeling. The impact analysis of 4IR technologies on maintenance work management systems reveals that the implementation of 4IR technologies intensifies asset performance with an overall gain of 27.46%, yielding the best maintenance index. This study further reveals that the benefits of 4IR technologies positively impact equipment defect predictability before failure, thereby yielding a predictive maintenance strategy.

Research limitations/implications

The study focused on maintenance work management system without the consideration of other subsystems such as cost of maintenance, production dynamics, and supply chain management.

Practical implications

The maintenance real-world quantitative data is retrieved from two maintenance departments from company A, for a period of 24 months, representing years 2017 and 2018. The maintenance quantitative data retrieved represent six various types of equipment used at underground Mines. The maintenance management qualitative data (Organizational documents) in maintenance management are retrieved from company A and company B. Company A is a global mining industry, and company B is a global manufacturing industry. The reliability of the data used in the model validation have practical implications on how maintenance work management system behaves with the benefit of 4IR technologies' implementation.

Social implications

This research study yields an overall benefit in asset management, thereby intensifying asset performance. The expected learnings are intended to benefit future research in the physical asset management field of study and most important to the industry practitioners in physical asset management.

Originality/value

This paper provides for a model in which maintenance work and its dynamics is systematically managed. Uncontrollable corrective maintenance work increases the complexity of the overall maintenance work management. The use of a system dynamic model and simulation incorporating 4IR technologies adds value on the maintenance work management effectiveness.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 16 November 2021

M. Birasnav, Prabhakar Venugopal Gantasala and Swapna Bhargavi Gantasala

The purpose of this study is to examine the influence of the implementation of safety-oriented knowledge management (KM) processes and student diversity acceptance in schools and…

Abstract

Purpose

The purpose of this study is to examine the influence of the implementation of safety-oriented knowledge management (KM) processes and student diversity acceptance in schools and the interaction effect of safety-oriented KM processes and student diversity acceptance over school performance and student academic orientation.

Design/methodology/approach

Responses of 977 American schools available in the database of the National Center for Education Statistics were analyzed using hierarchical regression analyses.

Findings

Results show that implementation of safety-oriented KM processes and diversity acceptance in schools have varying effects on school performance and student academic orientation. The impact of knowledge acquisition from parents on the academic achievement of students is positive and stronger in schools that are low in student diversity acceptance than schools that are high in student diversity acceptance.

Originality/value

This study adds value to the KM literature by exploring how KM processes are executed in American schools to improve their performance and students’ academic orientation and how diversity among students alters the strength of the relationships.

Details

VINE Journal of Information and Knowledge Management Systems, vol. 53 no. 6
Type: Research Article
ISSN: 2059-5891

Keywords

Article
Publication date: 9 January 2024

Benjamin Boahene Akomah and Prasanna Venkatesan Ramani

This paper aims to identify the unidimensionality and reliability of 84 factors that influence the performance of construction projects and develop a confirmatory factor analysis…

Abstract

Purpose

This paper aims to identify the unidimensionality and reliability of 84 factors that influence the performance of construction projects and develop a confirmatory factor analysis (CFA) model.

Design/methodology/approach

The study adopted a deductive research approach and started by identifying the positive factors that influence construction project performance. This was followed by the modification of the identified factors. After that, a questionnaire was developed out of the factors for data collection. Exploratory factor analysis was used to establish the factor structure of the positive factors, and this was verified using CFA afterwards. A model fit analysis was performed to determine the goodness of fit of the hypothesised model, followed by the development of the confirmatory model.

Findings

The study demonstrated substantial correlation in the data, sufficient unidimensionality and internal reliability. In addition, the estimated fit indices suggested that the postulated model adequately described the sample data.

Practical implications

The paper revealed that performance can be enhanced if stakeholders identify and leverage the positive factors influencing performance. The paper suggests that project stakeholders, particularly government, project owners, consultants and construction firms, can improve project performance by critically examining economic and financial systems (EFS), regulation and policy-making systems (RPS), effective management practices (EMP) and project implementation strategies (PIS).

Originality/value

The contribution of this paper to the present literature is identifying the positive factors and developing the confirmatory factor model. The model comprised 42 positive variables under four indicators: EMP, RPS, PIS and EFS.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175