Search results

1 – 4 of 4
Article
Publication date: 9 July 2024

Ayman Ahmed Ezzat Othman and Aya Said Muawad Saad

This paper aims to develop and validate a strategy for reducing construction waste (CW) generated during the design process (DP) in architectural design firms (ADFs) in Egypt.

Abstract

Purpose

This paper aims to develop and validate a strategy for reducing construction waste (CW) generated during the design process (DP) in architectural design firms (ADFs) in Egypt.

Design/methodology/approach

Qualitative and quantitative research methodology was designed to accomplish four objectives. The literature review investigated DP, CW, waste management (WM) and WM strategies (WMS). Three case studies were analysed to investigate the role of WMS towards reducing CW during DP. A survey questionnaire was conducted with a representative sample of ADFs in Egypt to assess their perception and application of WMS during DP. Lastly, a strategy was developed and validated to reduce CW generated during DP.

Findings

Through literature review, the research identified the highest 40 causes of CW during the DP and classified them into 13 categories. Despite early promotion of WMS to reduce CW at its source, Egypt and other countries with similar construction market characteristics lack laws and regulations to address CW during the DP, with current codes primarily focusing on post-occurrence issues. In addition, analysis of three case studies showed that CW was reduced by adopting WMS during the DP. Findings of data analysis revealed that ADFs have an average knowledge of WMS and a low awareness of Egyptian laws and WMS during DP. “Prefabrication” was the highest-ranked strategy for CW reduction during DP. Several challenges hamper the implementation of WMS. The “preparation and briefing” was ranked the most common design stage where CW causes occur, while “waiting” was ranked the most common form of CW. These findings informed the research outcome and helped in the development of the proposed strategy.

Research limitations/implications

The proposed strategy was developed taking into account the results of the survey questionnaire which was conducted in ADFs in Egypt where the authors reside, and such a strategy is needed. However, it could be applied in other countries that share the same characteristics of the architectural DP as well as the causes of CW and WMS implementation challenges.

Practical implications

This research presents a practical strategy to reduce CW generated during the DP. It was based on the findings of literature review, case studies and survey questionnaire. The strategy was explained in a workable way to include the required activities; tools and techniques; involved personnel and needed resources. The strategy was validated by a representative sample of ADFs in Egypt to ensure its practicability and viability for implementation towards developing a sustainable built environment. The practical application of the strategy will have long-term and short-term benefits. The long-term benefits include improving the social, economic and environmental aspects of sustainability during the design and construction phases in Egypt. In the short term, application of the strategy will improve the cooperation between design and construction teams, reduce the negative impact of CW production and enhance the quality of construction projects in Egypt.

Originality/value

Despite the need to reduce CW during DP, a practical strategy is lacking in Egypt, where laws are focused on dealing with CW after its existence. This research studied a topic that received scant attention in construction literature. It developed and validated a strategy to reduce CW during DP, which represents a synthesis that is novel and creative in thought and adds value in a manner that has not been previously explored.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 10 April 2024

Ayman Ahmed Ezzat Othman and Rodayna Ehab Hegazy

This research aims to develop and validate a framework for eradicating women’s discrimination in architectural design firms (ADFs) in Egypt and propose strategies for prospective…

Abstract

Purpose

This research aims to develop and validate a framework for eradicating women’s discrimination in architectural design firms (ADFs) in Egypt and propose strategies for prospective adoption in the Gulf Cooperation Council (GCC) countries to increase the transformational impact of women on the architectural and urban developments of the Gulf region.

Design/methodology/approach

A combined qualitative and quantitative research approach was designed to accomplish four objectives. Firstly, to investigate the nature of business in ADFs, women’s discrimination and policies for gender equity (PGE) in architecture. Secondly, to analyse three case studies to validate the identified causes and impacts of women’s discrimination and examine the role of PGE towards eradicating women’s discrimination in ADFs. Thirdly, to conduct a survey questionnaire with a representative sample of ADFs to investigate their perception of women’s discrimination and the correlation between PGE towards eradicating women’s discrimination in ADFs. Based on the above, the research developed and validated a framework to eradicate women’s discrimination in ADFs in Egypt and suggested strategies for potential application in the GCC countries to increase the transformational role of women in the architectural and urban developments of the Gulf region.

Findings

Through literature review and case studies, the research identified and validated the causes and impacts of women’s discrimination as well as PGE in Architecture. The findings of data analysis showed that the highest-ranked causes of women discrimination in ADFs were “customs and beliefs” followed by “Underestimating women’s work” and “Recruiting males more than females”. Moreover, the highest-ranked impacts of women’s discrimination were “career shift and leaving the profession” followed by “decrease in creativity and innovation” and “decrease in economic growth”. Furthermore, the Spearman correlation test showed that while some PGE were correlated, others were not. These findings helped in the development of the proposed framework and proposed strategies.

Practical implications

This research presents a practical framework to eliminate women’s discrimination in ADFs in Egypt based on the findings of literature review, case studies and survey questionnaire. The framework explained in a workable way the objectives of the framework functions; activities; tools and techniques; involved personnel and needed resources as well as enforcing mechanisms. It was validated by a representative sample of ADFs in Egypt to ensure its practicability and viability and suggested strategies for implementation in the GCC countries to increase women’s role in architectural and urban development.

Originality/value

The research identified and validated the causes and impacts of women’s discrimination as well as PGE in Architecture. Moreover, the research investigated the perception of women’s discrimination and the correlation between PGE through conducting a survey questionnaire with a representative of ADFs in Egypt. The research tackled a topic that received scant attention in construction literature, especially in Egypt and the GCC countries. The research developed and validated a framework to eradicate women’s discrimination in ADFs in Egypt. It represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred. The research suggested several strategies for the prospective implementation of the framework in the GCC countries as an approach to enhancing the transformational role of women in the architectural and urban developments of the Gulf region.

Details

Archnet-IJAR: International Journal of Architectural Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2631-6862

Keywords

Article
Publication date: 14 July 2022

Ayman Ahmed Ezzat Othman and Ahmed Ramadan Kamal

The aim of this paper is to develop a framework to enhance building maintainability through facilitating early suppliers’ involvement (ESI) in the design process.

Abstract

Purpose

The aim of this paper is to develop a framework to enhance building maintainability through facilitating early suppliers’ involvement (ESI) in the design process.

Design/methodology/approach

A research methodology consisting of literature review, case studies and survey questionnaire was designed to achieve the above-mentioned aim. Firstly, literature review was used to examine the concepts of building maintenance, maintainability, the design process and ESI. Secondly, three case studies were presented and analysed to investigate the role of ESI towards enhancing building maintainability during the design process. Thirdly, a survey questionnaire was carried out with a representative sample of architectural design firms (ADFs) in Egypt to investigate their perception and application of ESI towards enhancing building maintainability during the design process. Finally, the research developed a framework to facilitate ESI in the design process in ADFs in Egypt.

Findings

Through literature review, the research highlighted the relationship between ESI and enhancing building maintainability and identified the roles, benefits, challenges and that encounter ESI in ADFs, factors for suppliers selection and levels of involvement. Results of the data analysis showed that “Difficulty of trusting external parties and sharing information with transparency” was ranked the highest challenge of ESI in ADFs in Egypt, followed by “Legal competitive advantage restrictions”. Moreover, “Better estimation for operation and maintenance costs” was ranked the highest contributions of ESI towards enhancing building maintainability, followed by “Reduce the number of operation and maintenance problems or reworks”. Finally, respondents stated that “Innovation, technical expertise, and competence” was ranked the highest supplier’s selection criteria, while “paying consultation fees for offering advice and recommendations to the design team” was ranked the highest form of supplier’s remuneration.

Research limitations/implications

The proposed framework contributes to the body of knowledge through proposing five functions that aimed to facilitate ESI in the design process, a research area that received scant attention in construction research. In addition, because of the conceptual nature of the framework, it has to be validated to ensure its capability to overcome the challenges of ESI as an approach for enhancing building maintainability during the design process.

Practical implications

This research presents a practical solution that bridges the gap between theory and practice through overcoming the challenges that obstruct suppliers from being involved in the design process as an approach for enhancing building maintainability.

Originality/value

This research discussed the relationship between ESI and enhancing building maintainability as well as the roles, benefits and challenges that encounter ESI in ADFs. In addition, the research investigated the levels of suppliers’ involvement, selection criteria and forms of payment. Moreover, it investigated the perception and application of ESI in ADFs in Egypt towards improving building maintainability. The research proposed a framework to facilitate the integration of suppliers in the early stages of the project life cycle. It represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 1 February 2022

Ayman Ahmed Ezzat Othman and Yomna Abdelghany El-Saeidy

The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design…

Abstract

Purpose

The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design process.

Design/methodology/approach

A research methodology consists of literature review, case studies and survey questionnaire was designed to achieve the abovementioned aim. First, the literature review was used to investigate CW, CW generated during the design process, the design process and ESI. Second, two construction projects were analysed to investigate the role of ESI towards reducing CW generated during the design waste. Third, a survey questionnaire was carried out with a representative sample of architectural design firms (ADFs) in Egypt to examine their perception and application of ESI towards reducing CW generated during the design process. Based on the results of the above, the research developed a framework to facilitate ESI during the design process to reduce CW.

Findings

Through literature review, the research highlighted the causes of CW generated during the design process and identified the benefits and challenges that encounter ESI in ADFs. Results of data analysis showed that “last-minute changes due to client requirements” was ranked the highest challenges of ESI in ADFs in Egypt followed by “lack of design experience”. Moreover, “providing technical information about materials and equipment and their capabilities” was ranked by respondents as the highest contributions of suppliers during the design process which leads to waste reduction followed by “better estimation of materials and costs”. Finally, respondents stated that “resistance of ADFs to include suppliers in the design phase” was ranked the highest challenge of ESI in the design process followed by “no clear guidelines or policies that organise ESI”.

Research limitations/implications

Because of the conceptual nature of the proposed framework, it has to be tested and validated to ensure its capability to overcome the challenges of ESI as an approach for reducing CW generated during the design process.

Practical implications

This research presents a practical solution to the problem of CW generated during the design process through ESI.

Originality/value

The research discussed the causes of CW originated from the design process and the benefits and challenges of ESI in ADFs. It investigated the perception and application of ESI in ADFs in Egypt. The proposed framework which was designed to facilitate the integration of suppliers in the early stages of the project life cycle represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 4 of 4