Search results

1 – 10 of over 3000
Open Access
Article
Publication date: 4 July 2022

Shiyu Wan, Yisheng Liu, Grace Ding, Goran Runeson and Michael Er

This article aims to establish a dynamic Energy Performance Contract (EPC) risk allocation model for commercial buildings based on the theory of Incomplete Contract. The purpose…

1813

Abstract

Purpose

This article aims to establish a dynamic Energy Performance Contract (EPC) risk allocation model for commercial buildings based on the theory of Incomplete Contract. The purpose is to fill the policy vacuum and allow stakeholders to manage risks in energy conservation management by EPCs to better adapt to climate change in the building sector.

Design/methodology/approach

The article chooses a qualitative research approach to depict the whole risk allocation picture of EPC projects and establish a dynamic EPC risk allocation model for commercial buildings in China. It starts with a comprehensive literature review on risks of EPCs. By modifying the theory of Incomplete Contract and adopting the so-called bow-tie model, a theoretical EPC risk allocation model is developed and verified by interview results. By discussing its application in the commercial building sector in China, an operational EPC three-stage risk allocation model is developed.

Findings

This study points out the contract incompleteness of the risk allocation for EPC projects and offered an operational method to guide practice. The reasonable risk allocation between building owners and Energy Service Companies can realize their bilateral targets on commercial building energy-saving benefits, which makes EPC more attractive for energy conservation.

Originality/value

Existing research focused mainly on static risk allocation. Less research was directed to the phased and dynamic risk allocation. This study developed a theoretical three-stage EPC risk allocation model, which provided the theoretical support for dynamic EPC risk allocation of EPC projects. By addressing the contract incompleteness of the risk allocation, an operational method is developed. This is a new approach to allocate risks for EPC projects in a dynamic and staged way.

Details

International Journal of Climate Change Strategies and Management, vol. 15 no. 4
Type: Research Article
ISSN: 1756-8692

Keywords

Open Access
Article
Publication date: 7 February 2022

Chunsuk Park, Dong-Soon Kim and Kaun Y. Lee

This study attempts to conduct a comparative analysis between dynamic and static asset allocation to achieve the long-term target return on asset liability management (ALM). This…

1445

Abstract

This study attempts to conduct a comparative analysis between dynamic and static asset allocation to achieve the long-term target return on asset liability management (ALM). This study conducts asset allocation using the ex ante expected rate of return through the outlook of future economic indicators because past economic indicators or realized rate of returns which are used as input data for expected rate of returns in the “building block” method, most adopted by domestic pension funds, does not fully reflect the future economic situation. Vector autoregression is used to estimate and forecast long-term interest rates. Furthermore, it is applied to gross domestic product and consumer price index estimation because it is widely used in financial time series data. Based on asset allocation simulations, this study derived the following insights: first, economic indicator filtering and upper-lower bound computation is needed to reduce the expected return volatility. Second, to reach the ALM goal, more stocks should be allocated than low-yielding assets. Finally, dynamic asset allocation which has been mirroring economic changes actively has a higher annual yield and risk-adjusted return than static asset allocation.

Details

Journal of Derivatives and Quantitative Studies: 선물연구, vol. 30 no. 1
Type: Research Article
ISSN: 1229-988X

Keywords

Content available
Article
Publication date: 15 June 2017

Ali Dadashi, Maxim A. Dulebenets, Mihalis M. Golias and Abdolreza Sheikholeslami

The paper aims to propose a new mathematical model for allocation and scheduling of vessels at multiple marine container terminals of the same port, considering the access channel…

1532

Abstract

Purpose

The paper aims to propose a new mathematical model for allocation and scheduling of vessels at multiple marine container terminals of the same port, considering the access channel depth variations by time of day.

Design/methodology/approach

This paper proposes a new mathematical model for allocation and scheduling of vessels at multiple marine container terminals of the same port, considering the access channel depth variations by time of day. The access channel serves as a gate for vessels entering or leaving the port. During low-depth tidal periods the vessels with deep drafts have to wait until the depth of the access channel reaches the required depth.

Findings

A number of numerical experiments are performed using the operational data collected from Port of Bandar Abbas (Iran). Results demonstrate that the suggested methodology is able to improve the existing port operations and significantly decrease delayed vessel departures.

Originality/value

The contribution of this study to the state of the art is a novel mathematical model for allocation and scheduling of vessels at multiple terminals of the same port, taking into consideration channel depth variations by time of day. To the best of the authors’ knowledge, this is the first continuous berth scheduling linear model that addresses the tidal effects on berth scheduling (both in terms of vessel arrival and departure at/from the berth) at multiple marine container terminals.

Details

Maritime Business Review, vol. 2 no. 2
Type: Research Article
ISSN: 2397-3757

Keywords

Open Access
Article
Publication date: 23 May 2023

Myungjoo Kang, Inwook Song and Seiwan Kim

This study aims to empirically analyze the asset allocation capabilities of Outsourced Chief Investment Officers (OCIOs) in Korea. The empirical analysis used data from 35 funds…

Abstract

This study aims to empirically analyze the asset allocation capabilities of Outsourced Chief Investment Officers (OCIOs) in Korea. The empirical analysis used data from 35 funds that were evaluated by the Ministry of Strategy and Finance from 2012 to 2020. The results of the analysis are summarized as follows. First, this study found that funds that adopted OCIO improved their asset allocation performance. Second, the sensitivity between risk-taking and performance decreased for funds that adopted OCIO. Third, it is found that OCIO adoption improves a fund's asset management execution (tactical capabilities). This study has methodological limitations in which the methodology used in this study is not based on theoretical prior research, but on practical applications. However, considering the need to clearly analyze the capabilities of OCIO and the timeliness of the topic, this study is valuable and can provide meaningful information to funders who are considering adopting OCIO in the future.

Details

Journal of Derivatives and Quantitative Studies: 선물연구, vol. 31 no. 2
Type: Research Article
ISSN: 1229-988X

Keywords

Content available
Book part
Publication date: 30 July 1993

Abstract

Details

Contingent Valuation: A Critical Assessment
Type: Book
ISBN: 978-1-84950-860-5

Open Access
Article
Publication date: 1 August 2016

Wenqi Jiang

Different from manufacturing resources allocation problems, the prices and amounts of limited public service resources could not be changed with the consumers’ requirements and…

1647

Abstract

Purpose

Different from manufacturing resources allocation problems, the prices and amounts of limited public service resources could not be changed with the consumers’ requirements and social fairness is the most important objective for improving allocation efficiency. To measure social fairness reasonably, the purpose of this paper is fourfold: first, divide social fairness into longitudinal comparative fairness and crosswise comparative fairness, therefore providing their calculation formula and describing the comprehensive fair degree by using the interval numbers. Second, the comparison regulations of interval numbers are given and the corresponding features are also described. Third, an extension of VIKOR method is put forward for evaluating social fairness of different allocation alternatives with interval numbers. Finally, a numerical example illustrates the proposed method and clarifies the main results developed in the paper.

Design/methodology/approach

In this paper, the author depicts the social fair degree as an interval number, and thus proposes the comparison method between any two interval numbers. Based on the basis procedure of the VIKOR method, the paper proposes an extension of the fuzzy VIKOR method with the interval numbers to rank and select the compromise allocation alternatives. Finally, a numerical example illustrates the practicability of the proposed method.

Findings

The comparison of interval numbers is very important when the author evaluates the decision alternatives. Through analyzing the present comparison methods, the paper proposes the simple method of comparing the interval numbers, which can obtain the same results with the above two methods. The fuzzy VIKOR method, a popular multi-criteria decision-making method, focusses on ranking and selecting from a set of alternatives in a fuzzy environment. For the fuzzy value, the paper also proposes the extension of the VIKOR method to perform an evaluation and get the compromise alternatives.

Originality/value

According to the huge customers’ requirement, how to improve their social fair degree has become the focus in public service resources allocation, where the social fair degree may be a comprehensive concept which includes the fair degree compared with all the other allocation alternatives and the fair degree compared with the other small group under the same allocation alternative. In the paper, the author defines the above two types of fair degree and then depicts the comprehensive fair degree as their integration, which will be interval numbers.

Details

Kybernetes, vol. 45 no. 7
Type: Research Article
ISSN: 0368-492X

Keywords

Open Access
Article
Publication date: 20 February 2024

Richard Robertson, Athanasios Petsakos, Chun Song, Nicola Cenacchi and Elisabetta Gotor

The choice of crops to produce at a location depends to a large degree on the climate. As the climate changes and food demand evolves, farmers may need to produce a different mix…

Abstract

Purpose

The choice of crops to produce at a location depends to a large degree on the climate. As the climate changes and food demand evolves, farmers may need to produce a different mix of crops. This study assesses how much cropland may be subject to such upheavals at the global scale, and then focuses on China as a case study to examine how spatial heterogeneity informs different contexts for adaptation within a country.

Design/methodology/approach

A global agricultural economic model is linked to a cropland allocation algorithm to generate maps of cropland distribution under historical and future conditions. The mix of crops at each location is examined to determine whether it is likely to experience a major shift.

Findings

Two-thirds of rainfed cropland and half of irrigated cropland are likely to experience substantial upheaval of some kind.

Originality/value

This analysis helps establish a global context for the local changes that producers might face under future climate and socioeconomic changes. The scale of the challenge means that the agricultural sector needs to prepare for these widespread and diverse upheavals.

Details

China Agricultural Economic Review, vol. 16 no. 2
Type: Research Article
ISSN: 1756-137X

Keywords

Content available
Article
Publication date: 19 January 2022

Zhihong Jin, Xiaohan Wang, Jiaqing Sun and Qi Xu

Energy groups are cargo owners with large amounts of energy sources (such as coal) to transport. To achieve a satisfactory tradeoff between the reliability requirements of the sea…

1294

Abstract

Purpose

Energy groups are cargo owners with large amounts of energy sources (such as coal) to transport. To achieve a satisfactory tradeoff between the reliability requirements of the sea transportation process and the need to control the investment cost, they usually set up a self-owned fleet supplemented by a chartered fleet. This paper aims to investigate the best fleet structure and to evaluate the investment scheme under volatile circumstances in the shipping market.

Design/methodology/approach

The authors construct a mathematical model to determine the ratio of the self-owned fleet to the total fleet to minimize fleet operating costs. The volatility of both freight rates and oil prices is taken into consideration. The CPLEX solver is used to empirically analyze real data from an energy group in China, and the ship investment plan is evaluated considering the technical and economic feasibility.

Findings

If the ratio of the self-owned fleet to the total fleet is increased to the optimal of 90.40%, the total operating cost is reduced by 33.98%. Thus, the energy group should increase its capacity with a Panamax vessel of approximately 82,000 DWT. Purchasing a 5-year-old secondhand ship and building a new ship both have good investment return indicators.

Originality/value

For cargo owners engaging in transporting bulk cargo domestically in China, the suggested fleet ratio can provide a reference with a universal application scale, given the boundary economic conditions (including the volatility of freight rates and oil prices in the shipping market) in the paper.

Details

Maritime Business Review, vol. 7 no. 3
Type: Research Article
ISSN: 2397-3757

Keywords

Open Access
Article
Publication date: 28 June 2022

Sahar Jawad, Ann Ledwith and Rashid Khan

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and…

1975

Abstract

Purpose

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and successfully achieving project objectives has yet to be explored. This research investigates the enablers and barriers that influence the elements of PCS success and drive project objectives.

Design/methodology/approach

This study adopts a mixed approach of descriptive analysis and regression models to explore the impact of six PCS elements on project outcomes. Petroleum and chemical projects in Saudi Arabia were selected as a case study to validate the research model.

Findings

Data from a survey of 400 project managers in Saudi’s petroleum and chemical industry reveal that successful PCS are the key to achieving all project outcomes, but they are particularly critical for meeting project cost objectives. Project Governance was identified as the most important of the six PCS elements for meeting project objectives. A lack of standard processes emerged as the most significant barrier to achieving effective project governance, while having skilled and experienced project team members was the most significant enabler for implementing earned value.

Practical implications

The study offers a direction for implementing and developing PCS as a strategic tool and focuses on the PCS elements that can improve project outcomes.

Originality/value

This research contributes to project management knowledge and differs from previous attempts in two ways. Firstly, it investigates the elements of PCS that are critical to achieving project scope, schedule and cost objectives; secondly, enablers and barriers of PCS success are examined to see how they influence each element independently.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Content available
Book part
Publication date: 28 September 2016

Abstract

Details

Paratransit: Shaping the Flexible Transport Future
Type: Book
ISBN: 978-1-78635-225-5

1 – 10 of over 3000