Search results

1 – 10 of over 1000
Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 25 March 2024

Roope Nyqvist, Antti Peltokorpi and Olli Seppänen

The objective of this research is to investigate the capabilities of the ChatGPT GPT-4 model, a form of artificial intelligence (AI), in comparison to human experts in the context…

1438

Abstract

Purpose

The objective of this research is to investigate the capabilities of the ChatGPT GPT-4 model, a form of artificial intelligence (AI), in comparison to human experts in the context of construction project risk management.

Design/methodology/approach

Employing a mixed-methods approach, the study draws a qualitative and quantitative comparison between 16 human risk management experts from Finnish construction companies and the ChatGPT AI model utilizing anonymous peer reviews. It focuses primarily on the areas of risk identification, analysis, and control.

Findings

ChatGPT has demonstrated a superior ability to generate comprehensive risk management plans, with its quantitative scores significantly surpassing the human average. Nonetheless, the AI model's strategies are found to lack practicality and specificity, areas where human expertise excels.

Originality/value

This study marks a significant advancement in construction project risk management research by conducting a pioneering blind-review study that assesses the capabilities of the advanced AI model, GPT-4, against those of human experts. Emphasizing the evolution from earlier GPT models, this research not only underscores the innovative application of ChatGPT-4 but also the critical role of anonymized peer evaluations in enhancing the objectivity of findings. It illuminates the synergistic potential of AI and human expertise, advocating for a collaborative model where AI serves as an augmentative tool, thereby optimizing human performance in identifying and managing risks.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 October 2023

Muhammad Zada, Jawad Khan, Imran Saeed and Shagufta Zada

This study investigates the link between servant leadership and project management effectiveness in developmental projects in non-governmental organisations (NGOs). Further, this…

Abstract

Purpose

This study investigates the link between servant leadership and project management effectiveness in developmental projects in non-governmental organisations (NGOs). Further, this study examined the mediating role of conflict resolution and moderating role of organisational culture.

Design/methodology/approach

A three-wave survey of 288 non-governmental organisation (NGO) employees was used to evaluate the hypotheses. Hierarchical regression analysis and Hayes' PROCESS macro technique were used for data analysis.

Findings

In this study, servant leadership positively affects employee project management effectiveness in developmental projects in NGOs, and conflict resolution mediates the relationship. Furthermore, the results show that organisational culture moderates the positive relationship between servant leadership and employee project management effectiveness. Moreover, the authors investigated the hypotheses via a moderation mediation model. The strength of the mediated link between servant leadership and project management effectiveness (via conflict resolution) depends on organisational culture strength.

Practical implications

Leaders that practice servant leadership care for their employees genuinely and serve them by allowing them to make their own decisions. Every organisation may benefit from this leadership style since it encourages project effectiveness

Originality/value

New empirical data from this study suggests that servant leadership positively and substantially affects employee project management effectiveness in developmental projects in NGOs.

Details

Journal of Organizational Effectiveness: People and Performance, vol. 11 no. 2
Type: Research Article
ISSN: 2051-6614

Keywords

Article
Publication date: 26 March 2024

Yuanwen Han, Jiang Shen, Xuwei Zhu, Bang An and Xueying Bao

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects…

Abstract

Purpose

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects, reveal the interaction mechanism of interface management risk and provide theoretical support for project managers to develop appropriate interface management risk response strategies.

Design/methodology/approach

This paper introduces the association rule mining technique to improve the complex network modeling method. Taking China as an example, based on the stakeholder perspective, the risk factors and significant accident types of interface management of high-speed rail construction projects are systematically identified, and a database is established. Then, the Apriori algorithm is used to mine and analyze the strong association rules among the factors in the database, construct the complex network, and analyze its topological characteristics to reveal the interaction mechanism of the interface management risk of high-speed rail construction projects.

Findings

The results show that the network is both scale-free and small-world, implying that construction accidents are not random events but rather the result of strong interactions between numerous interface management risks. Contractors, technical interfaces, mechanical equipment, and environmental factors are the primary direct causal factors of accidents, while owners and designers are essential indirect causal factors. The global importance of stakeholders such as owners, designers, and supervisors rises significantly after considering the indirect correlations between factors. This theoretically explains the need to consider the interactions between interface management risks.

Originality/value

The interaction mechanism between interface management risks is unclear, which is an essential factor influencing the decision of risk response measures. This study proposes a new methodology for analyzing interface management risk response strategies that incorporate quantitative analysis methods and considers the interaction of interface management risks.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 October 2023

Mariam Bader, Jiju Antony, Raja Jayaraman, Vikas Swarnakar, Ravindra S. Goonetilleke, Maher Maalouf, Jose Arturo Garza-Reyes and Kevin Linderman

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six…

Abstract

Purpose

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six Sigma and Agile. Proposing a mitigation framework accordingly is also an aim of this study.

Design/methodology/approach

This research undertakes a systematic literature review of 49 papers that were relevant to the scope of the study and that were published in four prominent databases, including Google Scholar, Scopus, Web of Science and EBSCO.

Findings

Further analysis identifies 39 factors that contribute to the failure of PI projects. Among these factors, significant emphasis is placed on issues such as “resistance to cultural change,” “insufficient support from top management,” “inadequate training and education,” “poor communication” and “lack of resources,” as primary causes of PI project failures. To address and overcome the PI project failures, the authors propose a framework for failure mitigation based on change management models. The authors present future research directions that aim to enhance both the theoretical understanding and practical aspects of PI project failures.

Practical implications

Through this study, researchers and project managers can benefit from well-structured guidelines and invaluable insights that will help them identify and address potential failures, leading to successful implementation and sustainable improvements within organizations.

Originality/value

To the best of the author’s knowledge, this paper is the first study of its kind to examine the CFFs of five PI methodologies and introduces a novel approach derived from change management theory as a solution to minimize the risk associated with PI failure.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 27 November 2023

Li Ma and Yongqiang Lu

The purpose of this study is to examine how construction project managers’ conflict management styles (CMSs) affect project team resilience from the perspective of social identity…

Abstract

Purpose

The purpose of this study is to examine how construction project managers’ conflict management styles (CMSs) affect project team resilience from the perspective of social identity theory.

Design/methodology/approach

This study adopted a cross-sectional survey design and collected paired data from 110 construction project managers and 474 employees in China. Based on the data collected, the authors tested the proposed hypotheses using hierarchical regression analysis.

Findings

The results show that a project manager’s cooperative CMS positively affects team resilience, and a project manager’s competitive and avoidant CMS negatively affects team resilience. Team followership plays a mediating role in this relationship. The team power distance moderates the effects of a project manager’s cooperative and avoidant CMSs on team followership.

Originality/value

This paper enriches the existing literature on conflict management in construction projects and have potential guiding significance and application value for team resilience management practices.

Details

International Journal of Conflict Management, vol. 35 no. 3
Type: Research Article
ISSN: 1044-4068

Keywords

Article
Publication date: 13 October 2023

Eduardo André Cândido Da Silva, Flávio Santino Bizarrias, Renato Penha, Luciano Ferreira da Silva and Cristiane Drebes Pedron

Despite the significant interest from researchers and practitioners, the literature on project value measurement from the perspective of the customer is non-existent. This study…

Abstract

Purpose

Despite the significant interest from researchers and practitioners, the literature on project value measurement from the perspective of the customer is non-existent. This study aims to address this gap by developing and validating a scale to measure project value through a customer lens called the customer perception of project value scale.

Design/methodology/approach

A list of items was initially generated based on 762 sample responses through a systematic review of the literature and with the participation of specialists. Exploratory and confirmatory factorial analyses and structural equation modelling were used to develop and validate the scale.

Findings

The authors formulated a four-dimension scale. The dimensions used to measure the second-order construct are customer centrality, process, delivery and cost-benefit. This was validated using a nomological structure.

Research limitations/implications

The non-consensual nature of what is value in projects restricts the results of this study to the context of a specific group of stakeholders only, that is, the consumers of the projects. The authors also see limitations in the absence of competing scales, which do not allow the comparison of the instrument with alternative measures.

Practical implications

This study allows project managers and other professionals to measure a project’s perceived value from the customer’s point of view and manage the improvement of this perception.

Originality/value

To the best of the authors’ knowledge, this is the first study to propose a scale to measure project value, which advances the literature on project management and value and contributes to academic knowledge and practice by measuring project value from the customer standpoint.

Details

European Business Review, vol. 36 no. 3
Type: Research Article
ISSN: 0955-534X

Keywords

Article
Publication date: 23 January 2023

Amir Naser Ghanbaripour, Craig Langston, Roksana Jahan Tumpa and Greg Skulmoski

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating…

477

Abstract

Purpose

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating project delivery success is crucial for organizations since it enables them to prepare for future growth through more effective project management mechanisms and rank the organization's projects for continuous improvement. There is considerable disagreement over a set of success criteria that can be applied to all kinds of projects when evaluating project delivery success, making it a complicated procedure for practitioners and scholars. This research seeks to alleviate the problem by validating and testing a systematic project delivery success model (3D integration model) in the Australian construction industry. The aim is to establish a dependable approach built upon prior research and reliable in evaluating delivery success for any project type.

Design/methodology/approach

Based on a novel project delivery success model, this research applies a case study methodology to analyse 40 construction projects undertaken by a single Australian project management consultancy. The research utilizes a mixed-method research approach and triangulates three sets of data. First, the project delivery success (PDS) scores of the projects are calculated by the model. Second, a qualitative analysis targeting the performance of the same projects using a different system called the performance assessment review (PAR) scores was obtained. These culminate in two sets of ranking. The third step seeks validation of results from the head of the partnering organization that has undertaken the projects.

Findings

The findings of this study indicate that the 3D integration model is accurate and reliable in measuring the success of project delivery in construction projects of various sizes, locations and durations. While the model uses six key performance indicators (KPIs) to measure delivery success, it is evident that three of these may significantly improve the likelihood of PDS: value, speed and impact. Project managers should focus on these priority aspects of performance to generate better results.

Research limitations/implications

Restrictions inherent to the case study approach are identified for this mixed-method multiple-case study research. There is a limitation on the sample size in this study. Despite the researcher's best efforts, no other firm was willing to share such essential data; therefore, only 40 case studies could be analysed. Nonetheless, the number of case studies met the literature's requirements for adequate units for multiple-case research. This research only looked at Australian construction projects. Thus, the conclusions may not seem applicable to other countries or industries. The authors investigated testing the PDS in the construction sector. It can assist in improving efficiency and resource optimization in this area. Nonetheless, the same technique may be used to analyse and rank the success of non-construction projects.

Originality/value

Despite the research conducted previously on the PDS of construction projects, there is still confusion among researchers and practitioners about what constitutes a successful project delivery. Although several studies have attempted to address this confusion, no consensus on consistent performance metrics or a practical project success model has been formed. More importantly, (1) the ability to measure success across multiple project types, (2) the use of triple bottom line (TBL) to incorporate sustainability in evaluating delivery success and (3) the use of a complexity measurement tool to adjust delivery success scores set the 3D integration model apart from others.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 19 December 2022

Si Yee Tiew

Graduate architect plays an important role in contract implementation management when handling building construction projects. Graduate architects had been authorized to manage…

Abstract

Purpose

Graduate architect plays an important role in contract implementation management when handling building construction projects. Graduate architects had been authorized to manage the projects in construction industry due to limited architects in the country. The capability of graduate architect when manage project is critical in reducing performance barriers encountered. The aim of this paper is to identify critical factors that affect graduate architect's performance during project implementation.

Design/methodology/approach

An explorative study was undertaken to provide an insight into actual experiences of graduate architects in contract implementation management. The data were collected through face-to-face semi-structured interviews providing case studies on contract implementation management on housing projects in Malaysia and observation of the actual on-going projects.

Findings

The five most crucial factors affected graduate architects' performance related to lack of training in project documentation, failed to obtain professional and peer support in quality and assessment, isolate in role during project coordination, lack of education support in design process and unaware of legal aspects which delayed response to contractor.

Research limitations/implications

This research focuses only on seven housing projects and semi-structured interviews with twenty graduate architects who in charge of those projects. As such, the resulting factors that affect graduate architect's performance are limited and are constrained only to the construction industry in Malaysia.

Practical implications

This research examined the factors affecting graduate architect's performance which is a timely study, as the increasing number of population and developments will provide ample opportunities for them to perform.

Originality/value

The outcome of the study is expected to facilitate graduate architects to devise proactive risk mitigation measures to reduce impact of these factors and improve project delivery.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 7 May 2024

Yazeed A. Alragabah and Mohd. Ahmed

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of…

Abstract

Purpose

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of this paper is to assess the impact of CSFs on the government construction projects in Saudi Arabia. The success factors are investigated from a broader consideration of failure criteria, from consideration of most effectiveness in successful project completion and also from consideration of the impact of implementing control processes for successful project completion.

Design/methodology/approach

This study has analysed the impact of success factors on construction projects in Saudi Arabia using a descriptive methodology. An exhaustive literature survey is undertaken to identify the success and failure factors related to government construction projects in Saudi Arabia. The survey data are sorted out and analysed by cost, schedule, technical, context and finance dimensions of the projects based on project types, engineering complexity, size, modality, jurisdictional control and funding approach. To evaluate the influence of success factors implementation, qualitative data were collected in a survey via a web-based questionnaire that was sent to officials working and occupying a responsible position in national project guidelines organizations and in government construction organizations in Saudi Arabia. In all, 28 CSFs were identified, ranked and evaluated for their impact on project success. The four identified factors belong to process categories of construction projects, nine factors belong to management of construction projects and 15 success factors are identified for impact assessment of implementation in construction projects.

Findings

The study's findings have identified and ranked the top five CSFs that significantly influence project outcomes, including meeting time targets, adhering to financial budgets, delivering desired outcomes for all stakeholders, effectively managing risks and assembling the appropriate team while optimizing resource allocation. Additionally, the research indicates that hindrances to projects primarily stem from execution, economic, human and political factors. The study advocates for strict controls over incomplete engineering designs and advises against contractors independently handling design work to ensure project success. Additionally, addressing contractors' qualifications and financial matters is crucial for project success. By highlighting these CSFs and challenges, the research provides actionable insights to enhance project management practices in the construction industry.

Research limitations/implications

This study is limited to the infrastructure projects constructed by governmental bodies with the participation of officials from government organizations. Further study, including private projects and officials working on private projects, may be needed to generalized the research outcome.

Originality/value

Numerous studies have investigated CSFs in construction projects, but few have examined their relevance to Saudi Arabian government projects. This study aims to fill this gap by identifying key CSFs specific to Saudi Arabian public sector construction projects and assessing their impact on project success. It advocates for stringent controls in the Saudi Arabian construction sector, emphasizing the importance of preventing incomplete or altered engineering designs by contractors to increase the success rate of public sector projects. This research offers practical insights to stakeholders, advancing project management practices in Saudi Arabia's construction sector for improved outcomes and resource utilization.

Details

Frontiers in Engineering and Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2634-2499

Keywords

1 – 10 of over 1000