Search results

1 – 10 of 13
Content available
Article
Publication date: 1 April 2000

John Goodier

106

Abstract

Details

Library Review, vol. 49 no. 3
Type: Research Article
ISSN: 0024-2535

Keywords

Content available
52

Abstract

Details

Library Review, vol. 50 no. 1
Type: Research Article
ISSN: 0024-2535

Keywords

Content available
Article
Publication date: 1 March 1998

John Goodier

342

Abstract

Details

Collection Building, vol. 17 no. 1
Type: Research Article
ISSN: 0160-4953

Keywords

Content available
Article
Publication date: 1 March 1999

John Goodier

68

Abstract

Details

Library Review, vol. 48 no. 2
Type: Research Article
ISSN: 0024-2535

Keywords

Content available
Article
Publication date: 1 September 2000

John Goodier

153

Abstract

Details

New Library World, vol. 101 no. 5
Type: Research Article
ISSN: 0307-4803

Keywords

Content available
Article
Publication date: 1 November 1998

John Goodier

51

Abstract

Details

Library Review, vol. 47 no. 7
Type: Research Article
ISSN: 0024-2535

Keywords

Content available
Article
Publication date: 16 February 2010

Tony Chalcraft

433

Abstract

Details

Reference Reviews, vol. 24 no. 2
Type: Research Article
ISSN: 0950-4125

Content available
Article
Publication date: 20 November 2007

Rose Goodier

61

Abstract

Details

Interlending & Document Supply, vol. 35 no. 4
Type: Research Article
ISSN: 0264-1615

Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

80182

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 29 March 2021

Rita Lavikka, Krishna Chauhan, Antti Peltokorpi and Olli Seppänen

Systemic innovations emerge and create value in an inter-organisational context. However, innovation studies rarely investigate the role of value creation and value capture among…

2510

Abstract

Purpose

Systemic innovations emerge and create value in an inter-organisational context. However, innovation studies rarely investigate the role of value creation and value capture among multiple organisations in successful innovation implementation. This paper aims to understand the role of value creation and value capture in the implementation of systemic innovations in construction which is by nature, an inter-organisational context.

Design/methodology/approach

The empirical research focused on the barriers, enablers and opportunities for value creation and value capture of the Finnish construction project parties when trying to implement mechanical, electrical and plumbing (MEP) prefabrication, which is a systemic innovation. Data were collected through interviews, observations and action workshops.

Findings

The empirical study identified interaction patterns on how social, political, technical and economic barriers lead to uneven value capturing, lack of value-based procurement and unclear value creation between MEP design and installation. They hinder the implementation of MEP prefabrication. The results point to enablers leading to fairly shared value to all parties, procurement of value and collaborative value creation, thus increasing the usage of MEP prefabrication, a systemic innovation.

Originality/value

The study adds new knowledge by demonstrating that the identification of barriers and their interaction with enablers and opportunities for value creation and capture lay a baseline for suggestions on how to implement a systemic innovation. This study stresses the importance of enabling value creation and capture for all construction project parties when implementing a systemic innovation.

Details

Construction Innovation , vol. 21 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 13