Article
Publication date: 18 June 2019

This paper aims to review the latest management developments across the globe and pinpoint practical implications from cutting-edge research and case studies.

Abstract

Purpose

This paper aims to review the latest management developments across the globe and pinpoint practical implications from cutting-edge research and case studies.

Design/methodology/approach

This briefing is prepared by an independent writer who adds their own impartial comments and places the articles in context.

Findings

This research paper concentrates on the reasons why the labor-only procurement of construction services is being commonly used in Nigeria. Adopting a survival strategy for hard economic times of accepting labor-only work benefits small- and medium-sized contractors by providing quick sources of cash flow and by allowing them to build more client relationships, while small private clients benefit from cost savings and from controlling material quality.

Originality/value

The briefing saves busy executives, strategists, and researchers hours of reading time by selecting only the very best, most pertinent information and presenting it in a condensed and easy-to-digest format.

Details

Strategic Direction, vol. 35 no. 8
Type: Research Article
ISSN: 0258-0543

Keywords

Article
Publication date: 14 January 2019

Oluwaseyi Alabi Awodele, Douglas Omoregie Aghimien, Olutayo Gabriel Akinkunmi and Clinton Ohis Aigbavboa

Due to its cost savings nature and ability to ensure constant jobs for contractors, this study aims to assess the capability of the labour-only procurement system to serve as a…

Abstract

Purpose

Due to its cost savings nature and ability to ensure constant jobs for contractors, this study aims to assess the capability of the labour-only procurement system to serve as a surviving strategy for construction contractors in a challenging economy.

Design/methodology/approach

The study adopted a mixed-methods design. An interview and questionnaire were used to harness information from 98 construction participants who have been involved in labour-only procured projects. These respondents were identified through snowballing. Frequency, percentage, mean item score, Mann–Whitney u-test and content analysis were used in analysing the data gathered.

Findings

Result revealed that participants are willing to execute more projects through this system because it gives considerable cost savings for clients and provides reduction in contractor’s risk and allows them to maintain healthy cash flow. The main factors influencing its usage are the client’s decision to procure materials, need for job at hand for contractors and the need for referrals from clients for subsequent jobs.

Practical implications

Findings of this study will assist contractors to understand the potential of this procurement system as a surviving option in a harsh economy. Small and medium contractors can make use of this available opportunity of having projects at hand at reduced risk to ensure continuous cash flow to keep their organisations afloat.

Originality/value

The contribution of this study to the body of knowledge lies in its provision of a reasonable insight on the inherent nature of a procurement system as a surviving strategy for contractors unlike the usual assessment of the generic survival strategies adopted in other studies.

Details

Journal of Engineering, Design and Technology, vol. 17 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 4 December 2023

Nnedinma Umeokafor, Abimbola Windapo and Oluwole Alfred Olatunji

The purpose of this study is to investigate the influences of the characteristics of procurement strategies, in this instance labour-only, on project performance concerning health…

Abstract

Purpose

The purpose of this study is to investigate the influences of the characteristics of procurement strategies, in this instance labour-only, on project performance concerning health and safety (H&S), a project performance indicator.

Design/methodology/approach

Using non-probability purposeful and snowballing sampling methods, questionnaires were used to collect data from construction professionals in Nigeria. This was then analysed using descriptive (frequency and mean scores) and inferential statistics (Mann–Whitney-U and Kendall's Tau_b tests).

Findings

The findings indicate a statistically significant negative correlation between ‘the level of client involvement and ‘fatalities' and a positive one with ‘conducting of health and safety risk assessment' and ‘conducting employee surveys on health and safety attitude’. Poor hygiene is found to be the worst lagging indicator, while conducting of inspection is the most adopted leading indicator of project health and safety performance. It also emerged that there is no significant difference in the health and safety performance of projects procured through the procurement strategy in urban and rural areas.

Practical implications

The study provides valuable insight into the complexities in H&S management due to the high level of client involvement in labour-only procurement system (LoPS) projects and the level of diversity in their responsibilities therein. It creates a fundamental direction for developing a detailed framework or guidance notes for client involvement in the integration of H&S into LoPS projects.

Originality/value

This is the first study that examines the influence of the characteristics of procurement strategy on project health and safety performance. Evidence in the literature shows that project delivery outcomes significantly improve if procurement is strategically used, including when it is considered early in projects. However, integrating H&S into procurement strategies has received little attention.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0401

Keywords

Book part
Publication date: 5 April 2022

Ayodeji Emmanuel Oke, Seyi Segun Stephen, Clinton Ohis Aigbavboa, Deji Rufus Ogunsemi and Isaac Olaniyi Aje

This chapter discusses the involvement of procurement in smart city development. Procurement plays a vital role in the development of strategies in planning, and execution in the…

Abstract

This chapter discusses the involvement of procurement in smart city development. Procurement plays a vital role in the development of strategies in planning, and execution in the construction industry. This is further introduced into smart city to find the best possible methods of bringing the ideas behind smart city into realisation. The common procurement methods are explained along with their involvement in smart city. Common drawbacks to smart cities procurement and measures to challenges in the procurement of smart city are also explicitly explained in the chapter. Through an identified and accepted procurement method into smart city, the processes involved in executing smart city will be the ones with directions and proper planning.

Details

Smart Cities: A Panacea for Sustainable Development
Type: Book
ISBN: 978-1-80382-455-0

Keywords

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The challenges confronting the Nigerian construction industry which led to the adoption of supply chain management (SCM) practice were evaluated in this chapter. It was discovered…

Abstract

The challenges confronting the Nigerian construction industry which led to the adoption of supply chain management (SCM) practice were evaluated in this chapter. It was discovered that the Nigerian construction industry is confronted with fragmentation and poor information management. The stakeholders within the Nigerian construction industry proposed the adoption of SCM to overcome the fragmentation and other shenanigans facing the industry. This chapter revealed that construction supply chain (CSC) practices within the Nigerian construction industry focus on waste elimination by adopting the lean concept. The focus on the lean concept could be attributed to the numerous research related to lean or the enormous waste emanating from the Nigerian construction industry. Regardless of the emphasis on lean, the Nigerian CSC is still confronted with fragmentation and heavy waste generation. Thus, this chapter proposed the adoption of principles and technologies driven by the fourth industrial revolution (4IR) is a paradigm shift for the management of CSC in the country. It was discovered in this chapter that Nigerian construction supply stakeholders had not embraced the technologies and principles of the 4IR. The failure to adopt the technologies driven by the 4IR is attributed to the absence of a CSC model that depicts the management of CSC in alignment with the 4IR. This chapter called for developing a SCM model for the Nigerian construction industry in tandem with the principles and technologies of the 4IR.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Article
Publication date: 16 September 2021

Abimbola Windapo, Abdulrauf Adediran, James Olabode Bamidele Rotimi and Nnedinma Umeokafor

This study aims to investigate whether clients’ knowledge about construction procurement systems influence project performance objectives and the role of procurement systems on…

Abstract

Purpose

This study aims to investigate whether clients’ knowledge about construction procurement systems influence project performance objectives and the role of procurement systems on project performance objectives in South Africa.

Design/methodology/approach

Using a two-round survey, 90 usable questionnaires from construction professionals in South Africa plus 3 expert clients were collected. The data were analysed using descriptive statistics – means, percentages and the analytical hierarchy process to determine the rank of client project performance criteria, while inferential statistics – Pearson product-moment correlation was used in establishing the relationship between the level of clients’ knowledge and project performance.

Findings

It was found that the common procurement systems used are traditional, followed by management-oriented and integrated procurement systems. In addition, it emerged that client’s knowledge of procurement systems shows a positive relationship with the achievement of project performance objectives. Based on these findings, it is concluded that some procurement systems being selected by clients in South Africa are inappropriately selected. This is despite the emergence of more efficient procurement systems. If procurement systems are selected based on the knowledge of the client, it will give better chances of a successful project outcome.

Practical implications

The research suggests the need for clients to seek ways to improve their understanding or increase their knowledge of procurement systems in construction. Policymakers’ responsibilities in driving policies that will place responsibilities on clients to seek a reasonable way to improve their knowledge where possible is implied in the study.

Originality/value

It contributes to improving project performance by examining whether the level of knowledge possessed by a client influences project performance.

Details

Journal of Engineering, Design and Technology , vol. 20 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 2 November 2015

Wilson Udo Udofia, B. H. W. Hadikusumo and Djoen San Santoso

This paper aims to identify and examine valid project termination reasons and the rebidding strategies of road construction project. Rebidding strategies is one of the measures to…

Abstract

Purpose

This paper aims to identify and examine valid project termination reasons and the rebidding strategies of road construction project. Rebidding strategies is one of the measures to restructure terminated/troubled road construction project.

Design/methodology/approach

An instrument which comprised 82 items entitled “Project Termination and Rebidding Strategies in Road Construction Projects in Nigeria” (PTRS) was developed to evaluate 60 randomly sampled road projects using qualified project/site managers and engineers as project respondents for the purpose of securing valid information on the terminated and rebid road construction projects. Mean, standard deviation and factor analysis shall be used as analytical tools in identifying valid termination reasons and rebidding strategies and as well as the relationship between them through regression analysis.

Findings

The paper’s findings revealed major project termination reasons and rebidding strategies. It further indicated significant relationship between variables which constitutes project termination reasons and rebidding strategies through regression analysis.

Practical implications

The outcome of the paper could be of immense benefits during the procurement phase of public project, especially regarding road construction. Stakeholders involved in the road procurement should seek relevant information concerning the road project reprocurement from the expert prior to contractual obligations.

Originality/value

Major challenges confronting the road construction project involve inappropriate procurement practices which frequently culminate into late deliveries of project. Rebidding strategies serve as a model through which cost, time and quality needs of the project client can be reassured in restructuring a terminated/troubled project.

Details

Journal of Financial Management of Property and Construction, vol. 20 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 4 December 2017

Titus Ebenezer Kwofie, Emmanuel Adinyira and Frank Fugar

Communication ineffectiveness inherent in the unique attributes of Mass Housing Project (MHP) features is well admitted in the body of literature. However, the understanding of…

Abstract

Purpose

Communication ineffectiveness inherent in the unique attributes of Mass Housing Project (MHP) features is well admitted in the body of literature. However, the understanding of the extent and nature of this influence of the unique features of MHPs requires an empirical insight. The aim of this paper is to identify the communication ineffectiveness induced by the unique features and delineate the implications of the findings for mass housing practitioners and stakeholders towards engendering effective communication performance.

Design/methodology/approach

Through a structured questionnaire survey, data were elicited from mass housing stakeholders and project team leaders. The data were subsequently analysed using structural equation modelling, and the communication effectiveness evaluation model was developed. Subsequently, the model was validated through a questionnaire survey on ten experienced mass housing practitioners, researchers and stakeholders.

Findings

The results revealed significant, moderate and weak effects of the unique features of MHP team communication performance. This suggests that the unique features of MHPs have varying degree of influence on the communication performance among project teams’ delivery. The findings provide practical, empirical insights and understanding into the inherent communication ineffectiveness on MHPs, and thus are very useful in communication management and planning in MHP’s delivery.

Originality/value

Against the backdrop of the need to gain an in-depth understanding of the inherent communication challenges towards improving communication performance in MHP delivery, the findings have rigorously revealed and provided clear insight into the nature of communication ineffectiveness inherent in the unique features of MHPs. The findings and insights provided by this study are thus useful for aligning communication management planning and strategies to the unique MHP environment to engender communication success. Practitioners can also use these findings towards the development of their communication behavioural skills and communication infrastructure for MHP delivery.

Details

Journal of Engineering, Design and Technology, vol. 15 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 1 January 1966

Denning, L.J. Diplock and L.J. Russell

March 18, 1966 Trade Dispute — Acts in furtherance of — Procuring breach of contract — Sub‐contract for “labour only” — Trade union objection in principle to “labour only”…

Abstract

March 18, 1966 Trade Dispute — Acts in furtherance of — Procuring breach of contract — Sub‐contract for “labour only” — Trade union objection in principle to “labour only” contracts — Industrial action to procure termination of sub‐contract continued after opportunity to learn terms on which sub‐contract terminable — Application by sub‐contractors for interim injunction — Whether industrial action prima facie unlawful interference with sub‐contract — Whether “labour only” contract “contract of employment”, Trade Disputes Act, 1906 (6 Edw. VII, c.47),s.3 — Trade Disputes Act, 1965 (c.48),s.1.

Details

Managerial Law, vol. 1 no. 1
Type: Research Article
ISSN: 0309-0558

Article
Publication date: 1 January 1996

AMMAR P. KAKA and FARZAD KHOSROWSHAHI

This paper addresses the effect of different procurement methods (traditional, design and build and management contracting) on project cash flow. Historical data relating to the…

Abstract

This paper addresses the effect of different procurement methods (traditional, design and build and management contracting) on project cash flow. Historical data relating to the periodic cost of 150 construction projects were collected. Four criteria were identified to classify the projects: type of project, size, company and type of procurement. The effect of these criteria on the S‐curves was then examined using ANOVA. Results confirmed that differently procured projects with different sizes produce different patterns. The company and type of project did not significantly affect the shape of the S‐curve. Standard S‐curves were then modelled for the three aforementioned procurement routes. These curves were used to calculate the relevant cash flows using a computer based cash flow forecasting model. A series of simulation tests were conducted to evaluate the extent of variation in cash flow, given different contract conditions. Results revealed that, in some cases, the variation in procurement routes has a significant effect on contract cash flows.

Details

Engineering, Construction and Architectural Management, vol. 3 no. 1/2
Type: Research Article
ISSN: 0969-9988

Keywords