Search results

1 – 3 of 3
Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

1080

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 29 June 2023

Gunilla Carlsson, Oskar Jonsson, Stefan Olander, Marianne Salén, Eva Månsson Lexell and Björn Slaug

This study aims to explore how an accessibility database (AD) has been developed and implemented as a tool for facility managers to evaluate and increase the accessibility of…

Abstract

Purpose

This study aims to explore how an accessibility database (AD) has been developed and implemented as a tool for facility managers to evaluate and increase the accessibility of public facilities.

Design/methodology/approach

Eight participants were strategically sampled for semi-structured interviews, and documents on the AD were gathered. The Consolidated Framework for Implementation Research (CFIR) was used for a directed content analysis of the data. The CFIR domains used for the analysis were: intervention characteristics, outer setting, inner setting, characteristics of individuals and process.

Findings

The development and implementation of the AD demonstrated the complexity in assessing and planning for increased accessibility. The communication and iterative processes within the inner as well as with the outer setting was an important part of the development and implementation, as well as anchoring each step locally, regionally and nationally, within public authorities and disability organizations.

Practical implications

The assessments of environmental barriers and the results reported in the AD can serve as a guide for identification of accessibility issues. However, singular identified barriers were reported as a fragmentation of the building regulations, and thereby when retrofitting is carried out, experts who have the competence to suggest solutions based on the entirety need to be involved to reach the goals of increased accessibility and countering of exclusion and discrimination.

Originality/value

By structuring the implementation process by means of the CFIR, facilitators and barriers of using an AD as a basis for retrofitting were revealed. The practical challenges outlined in assessing and increasing accessibility can guide facility managers when considering actions to increase accessibility.

Access

Only content I have access to

Year

Last 6 months (3)

Content type

1 – 3 of 3