Search results

1 – 10 of over 1000
Open Access
Article
Publication date: 17 October 2023

Sajida and Bevaola Kusumasari

This paper aims to identify the factors affecting the implementation of Public-Private Partnerships (PPPs) in the education sector.

4019

Abstract

Purpose

This paper aims to identify the factors affecting the implementation of Public-Private Partnerships (PPPs) in the education sector.

Design/methodology/approach

Based on Scopus and adopting the protocol of Staples and Niazi (2007), this systematic literature review examined 21 articles on PPPs in the education sector. Content analysis is adopted to identify research gaps and provide information on critical issues in the cases.

Findings

The findings have identified the critical success factors of PPPs in the education sector in 12 countries, revealing varying degrees of success and implementation challenges. They reflect the importance of clear objectives, effective communication, and robust partnerships between the public and private sectors to achieve success. These insights contribute to an in-depth understanding of PPP implementation in education, which can guide future projects.

Originality/value

The critical success factors identified in PPPs implementation in education across various countries may provide a comprehensive worldwide perspective for researchers, practitioners and policymakers.

Details

Public Administration and Policy, vol. 26 no. 3
Type: Research Article
ISSN: 1727-2645

Keywords

Open Access
Article
Publication date: 9 November 2023

Abdulmohsen S. Almohsen, Naif M. Alsanabani, Abdullah M. Alsugair and Khalid S. Al-Gahtani

The variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the…

Abstract

Purpose

The variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the quality of the owner's estimation for predicting precisely the contract cost at the pre-tendering phase and avoiding future issues that arise through the construction phase.

Design/methodology/approach

This paper integrated artificial neural networks (ANN), deep neural networks (DNN) and time series (TS) techniques to estimate the ratio of a low bid to the OEC (R) for different size contracts and three types of contracts (building, electric and mechanic) accurately based on 94 contracts from King Saud University. The ANN and DNN models were evaluated using mean absolute percentage error (MAPE), mean sum square error (MSSE) and root mean sums square error (RMSSE).

Findings

The main finding is that the ANN provides high accuracy with MAPE, MSSE and RMSSE a 2.94%, 0.0015 and 0.039, respectively. The DNN's precision was high, with an RMSSE of 0.15 on average.

Practical implications

The owner and consultant are expected to use the study's findings to create more accuracy of the owner's estimate and decrease the difference between the owner's estimate and the lowest submitted offer for better decision-making.

Originality/value

This study fills the knowledge gap by developing an ANN model to handle missing TS data and forecasting the difference between a low bid and an OEC at the pre-tendering phase.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 10 July 2023

Réka Tamássy, Zsuzsanna Géring, Gábor Király, Réka Plugor and Márton Rakovics

This study aims to investigate how highly ranked business schools portray ideal students in terms of their attributes and their agency. Understanding how these higher education…

Abstract

Purpose

This study aims to investigate how highly ranked business schools portray ideal students in terms of their attributes and their agency. Understanding how these higher education institutions (HEIs) discursively construct their present and prospective students also shed light on the institutions’ self-representation, the portrayal of the student–institution relationship and eventually the discursive construction of higher education’s (HE) role.

Design/methodology/approach

To understand this dynamic interrelationship, this study uses mixed methodological textual analysis first quantitatively identifying different modes of language use and then qualitatively analysing them.

Findings

With this approach, this study identified six language use groups. While the portrayal of the business schools and that of the students are always co-constructed, these groups differ in the extent of student and organisational agency displayed as well as the role and purpose of the institution. Business schools are always active agents in these discourses, but their roles and the students’ agency vary greatly across these six groups.

Practical implications

These findings can help practitioners determine how students are currently portrayed in their organisational texts, how their peers and competitors talk and where they want to position themselves in relation to them.

Originality/value

Previous studies discussed the ideal HE students from the perspective of the students or their educators. Other analyses on HE discourse focused on HEIs’ discursive construction and social role This study, however, unveils how the highly ranked business schools in their external organisational communication discursively construct their ideals and expectations for both their students and the general public.

Details

Journal of International Education in Business, vol. 17 no. 1
Type: Research Article
ISSN: 2046-469X

Keywords

Open Access
Article
Publication date: 14 September 2023

Peter Dodzi Kwasi Agbaxode, Ehsan Saghatforoush and Sitsabo Dlamini

The conventional project delivery (CPD) approach has been reported in the literature as the most widely used project delivery method in the construction industry globally compared…

Abstract

Purpose

The conventional project delivery (CPD) approach has been reported in the literature as the most widely used project delivery method in the construction industry globally compared to other delivery methods. However, researchers and practitioners have argued that the approach, specifically during the production of design documentation under the CPD, lacks certain capabilities that ensure quality and enhance project delivery. Therefore, this study aims to use the Ghanaian construction industry to identify the capabilities required of the CPD in practice, particularly during the production of design documentation.

Design/methodology/approach

The study design follows a pragmatist philosophy and uses mixed methods based on a deductive approach. Data collection involved a questionnaire survey, followed by semi-structured interviews. Quantitative data analysis used descriptive and inferential statistics, whereas qualitative data analysis used content analysis with the assistance of IBM SPSS and QSR Nvivo 12 Pro.

Findings

Findings indicate that there should be incentives for producing good design documentation quality; mandatory coordination of design documentation; improving collaboration among designers; and allowing contractors to make input during the design stage.

Practical implications

The results indicate the need for the identified capabilities to be introduced in the CPD approach to improve design documentation quality.

Originality/value

This study offers a significant insight into the specific capabilities that are required of the CPD approach in practice particularly, in the production of design documentation

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 7 December 2023

Neil Govender, Samuel Laryea and Ron Watermeyer

Competitive tendering in South Africa is often associated with procurement based on the lowest fee tendered. Previous research on this topic did not provide in-depth examinations…

Abstract

Purpose

Competitive tendering in South Africa is often associated with procurement based on the lowest fee tendered. Previous research on this topic did not provide in-depth examinations of how pricing within consulting engineering companies was affected by competitive tendering nor did it illuminate the extent to which professional services were impacted by competitive tendering. This paper aims to examine the implications of competitive tendering on pricing and delivery of consulting engineering services in South Africa.

Design/methodology/approach

A survey research strategy with a questionnaire as the research instrument elicited qualitative data from 28 experienced consulting engineers in South Africa. Thematic analysis was used to analyse qualitative data from the questionnaires.

Findings

Three key themes were identified, namely: considerations when determining consulting engineering fees on competitively tendered projects; the impact of reduced fees due to competitive tendering on the delivery of consulting engineering services; and interventions to prevent unsustainably “low” professional fees. Many consulting engineers in South Africa still determine fees using fee scales, while other considerations include resources, project complexity, risk, etc. Most participants asserted that design optimisation/value engineering, training, meetings and construction monitoring were adversely impacted by “low” fees.

Originality/value

This paper provides in-depth qualitative feedback from experienced consulting engineers (most having more than 20 years’ experience) on a topical issue in the South African construction industry. Thematic analysis was a novel method of analysis that was not used previously in this area of study.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 6 July 2023

Caroline Ingvarsson, Anette Hallin and Christof Kier

The purpose of this paper is to explore how gamification may be used for project stakeholder engagement.

1728

Abstract

Purpose

The purpose of this paper is to explore how gamification may be used for project stakeholder engagement.

Design/methodology/approach

The paper presents the results of a systematic literature review of extant research concerning the gamification of projects. Based on this, an agenda for future studies is outlined.

Findings

Extant research on the gamification of projects is scarce and scattered among various disciplines, but the engineering fields dominate. The research performed does indicate that gamification may be used for involving stakeholders in projects, primarily by promoting learning, but also by engaging them, motivating action and solving problems.

Research limitations/implications

In several cases, extant research display poor quality in research design and a lack in cross-disciplinary perspectives, which means that more research is needed. The users’ perspective is often lacking. Furthermore, the ideas gamification might be “hidden” within other technologies.

Practical implications

The findings of this research may assist project management practitioners in the endeavor of adopting gamification principles to better involve stakeholders.

Originality/value

The study fills a gap in summarizing the research on how gamification may be used to promote project stakeholder engagement. Based on this, it proposes a research agenda for future research on the use of gamification to promote project stakeholder engagement.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Content available
Book part
Publication date: 10 November 2023

Abstract

Details

Introducing Multidisciplinary Micro-credentialing: Rethinking Learning and Development for Higher Education and Industry
Type: Book
ISBN: 978-1-80382-460-4

Content available
Book part
Publication date: 12 February 2024

Lerato Aghimien, Clinton Ohis Aigbavboa and Douglas Aghimien

Abstract

Details

Construction Workforce Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-83797-019-3

Content available
Book part
Publication date: 27 September 2023

Abstract

Details

High Impact Practices in Higher Education: International Perspectives
Type: Book
ISBN: 978-1-80071-197-6

Access

Only content I have access to

Year

Last 12 months (1272)

Content type

1 – 10 of over 1000