Construction SMEs labour productivity: causal layered analysis

Oluseyi Julius Adebowale (Department of Building Sciences, Tshwane University of Technology, Pretoria, South Africa)
Justus Ngala Agumba (Department of Building Sciences, Tshwane University of Technology, Pretoria, South Africa)

Journal of Engineering, Design and Technology

ISSN: 1726-0531

Article publication date: 16 August 2023

166

Abstract

Purpose

Small and medium-sized contractors are critical to micro and macroeconomic performance. These contractors in South Africa have long been confronted with the problem of business failure because of a plethora of factors, including poor productivity. The purpose of this study is to investigate salient issues undermining the productivity of small and medium-sized contractors in South Africa. This study proposes alternative possibilities to engender productivity improvement.

Design/methodology/approach

Qualitative data were collected using semi-structured interviews with 15 contractors in Gauteng Province, South Africa. The research data were analysed using content and causal layered analyses.

Findings

Challenges to contractors’ productivity were associated with inadequately skilled workers, management competence and political factors. Skills development, construction business and political factors were dominant stakeholders’ perceptions. Metaphors for construction labour productivity are presented and reconstructed as alternative directions for productivity improvement.

Practical implications

Contractors lose a substantial amount of South African Rand to poor productivity. Alternative directions provided in this study can be leveraged to increase profitability in construction organizations, enhance the social well-being of South Africans and ultimately improve the contribution of contractors to the South African economy.

Originality/value

The causal layered analysis (CLA) applied in this study is novel to construction labour productivity research. The four connected layers of CLA, which make a greater depth of inquiry possible, were explored to investigate labour productivity in construction organizations.

Keywords

Acknowledgements

The authors acknowledge the financial support provided by Tshwane University of Technology for this study.

Conflict of interest: The authors have no competing interests to declare.

Citation

Adebowale, O.J. and Agumba, J.N. (2023), "Construction SMEs labour productivity: causal layered analysis", Journal of Engineering, Design and Technology, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/JEDT-11-2022-0583

Publisher

:

Emerald Publishing Limited

Copyright © 2023, Emerald Publishing Limited

Related articles