To read this content please select one of the options below:

Bendix builds a six‐machine FMS

Integrated Manufacturing Systems

ISSN: 0957-6061

Article publication date: 1 April 1990

21

Abstract

Examines the progressive introduction of a large FMS by Bendix Heavy Vehicles. Discusses the reasons for installing FMS: the need for batch production, reduction of labour content, and reduction of in‐process inventory, as well as details of the system itself, in particular scheduling and tool wear measurement. Concludes that FMS has improved quality, reduced lead time and has the added benefit of giving customers the perception of the company as a technology leader.

Keywords

Citation

Hollingum, J. (1990), "Bendix builds a six‐machine FMS", Integrated Manufacturing Systems, Vol. 1 No. 4, pp. 179-183. https://doi.org/10.1108/EUM0000000002070

Publisher

:

MCB UP Ltd

Copyright © 1990, MCB UP Limited

Related articles