Modeling and performance evaluation of PPP projects utilizing IFC extension and enhanced matter-element method

Zhao Xu (Department of Construction and Real Estate, School of Civil Engineering, Southeast University, Nanjing, China)
Xiang Wang (Department of Construction and Real Estate, School of Civil Engineering, Southeast University, Nanjing, China)
Ya Xiao (Department of Construction and Real Estate, School of Civil Engineering, Southeast University, Nanjing, China)
Jingfeng Yuan (Department of Construction and Real Estate, School of Civil Engineering, Southeast University, Nanjing, China)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 21 April 2020

Issue publication date: 21 September 2020

1049

Abstract

Purpose

There is often a lack of accurate performance evaluation in Public–Private Partnership (PPP) projects. It is a challenging issue to effectively use Building Information Modeling (BIM) for PPP project performance evaluation. The objective of this study is to develop a PPP project performance evaluation model based on Industry Foundation Classes (IFC) and an enhanced matter-element method to more precisely evaluate PPP project performance.

Design/methodology/approach

The performance evaluation of PPP projects in the construction and operation period was explored. The PPP project performance evaluation indicator system was first established based on a literature review and PPP project practice. Then, the evaluation indicator information was expressed through IFC mapping and extension. After that, an IFC-based PPP project performance evaluation model was developed, and a case study was provided to validate the use of the proposed performance evaluation model.

Findings

The results of the case study show that the proposed approach can accurately and efficiently evaluate PPP projects, and it could favorably contribute to performance evaluation in PPP projects.

Research limitations/implications

This study only concerns the performance evaluation of one type of PPP project. Further research is required to study different types of PPP projects; the model needs to be more efficient and intelligent.

Originality/value

The performance evaluation of PPP projects utilizing IFC extension and the enhanced matter-element method provides guidance for the government and private parties to accurately and efficiently evaluate PPP project performance.

Keywords

Acknowledgements

The authors' special thanks go to all survey participants and reviewers of the paper.Data Availability Statement: Data generated or analyzed during the study are available from the corresponding author by request.Conflicts of Interest: The authors declare that there is no conflict of interest regarding the publication of this paper.

Citation

Xu, Z., Wang, X., Xiao, Y. and Yuan, J. (2020), "Modeling and performance evaluation of PPP projects utilizing IFC extension and enhanced matter-element method", Engineering, Construction and Architectural Management, Vol. 27 No. 8, pp. 1763-1794. https://doi.org/10.1108/ECAM-08-2019-0429