Search results
1 – 10 of 282Despite the quantity of collaborations, the vocational network of the housing production in Ankara during its first five years (1923–1928) remains dispersed. The aim of this study…
Abstract
Purpose
Despite the quantity of collaborations, the vocational network of the housing production in Ankara during its first five years (1923–1928) remains dispersed. The aim of this study is to identify all the actors of housing production and their collaborations which shaped Ankara's urban development as the new capital city.
Design/methodology/approach
The study engages with the literature and archival documents to identify the actors of the housing production, i.e. architects, master-builders, public institutions, private companies, contractors and entrepreneurs, and their resultant vocational network in the housing production in Ankara during 1923–1928.
Findings
Due to different agendas, such as speculation, financial interests or patriotism, the construction industry in Ankara had become an arena where many paths intersected, forming an intertwined vocational network. The profession of contractor became popular, and local architects, engineers and even individuals of various other professions began to work as mediators for foreign companies and public institutions, which required support especially in large-scale projects.
Originality/value
The dispersed information revealed that the actors of the housing production remained mostly anonymous, or only the famous architects were commemorated; however, others could be found within the lines of the established literature on Ankara and/or in archival documents. This research not only focuses on “salient” actors but also highlights the “silent” actors of the housing production and prepares charts to clarify the vocational network in Ankara during its first five years to contribute to the future studies on Ankara and its housing.
Details
Keywords
This study traced the architectural, urban and social characteristics of the Bugok Railway Official Residences (BRORs) in South Korea. It also explored the modern elements of…
Abstract
Purpose
This study traced the architectural, urban and social characteristics of the Bugok Railway Official Residences (BRORs) in South Korea. It also explored the modern elements of Western (or Japanized Western) or traditional Korean characteristics embodied in the BRORs in the modernization process of Korea in the early 20th century.
Design/methodology/approach
Through literature reviews, field trips and archive investigation, this study uncovered new critical facts concerning the origin of the BRORs’ construction plan and architectural characteristics.
Findings
The BRORs’ value can be described as follows. First, the BRORs are the first modern housing complex in the Uiwang region. Second, they are meaningful as a housing area built during the Japanese colonial period, and many houses were concentrated in the center of a large city. Third, each official residence shows that various phenomena (mass production, standardization, efficiency and so on) are concentrated in buildings from premodern to modern period. Finally, the image of a group residential complex about to be demolished due to redevelopment is recorded in detail.
Social implications
In the 1940s, the Railway Bureau of the Japanese Government-General of Korea planned a new small-scale town where mainly railway workers would live. The BRORs in Sam-dong, Uiwang were the first-phase plan. Specifically, 200 households in 100 buildings (two households per building) were built in 1943 during the end of the Japanese colonial period. After the liberation in 1945, these residences were made available to the general public and only 27 households remained through modification and renovation. The remaining residences will be demolished in 2023.
Originality/value
This research examined the meaning of the BRORs, which had not previously been researched in-depth, from diverse perspectives; accordingly, the basic research required for sustainable archiving can be performed after demolition using the study data.
Details
Keywords
Andrew Ebekozien, Clinton Ohis Aigbavboa and Mohamad Shaharudin Samsurijan
Though alternative building technologies (ABTs) have been encouraged to address accessible and affordable issues in low-cost housing (LCH) provision, their adoption is still…
Abstract
Purpose
Though alternative building technologies (ABTs) have been encouraged to address accessible and affordable issues in low-cost housing (LCH) provision, their adoption is still overwhelmed with encumbrances. The encumbrances that hinder ABT adoption require an in-depth study, especially in developing countries like Nigeria. However, studies regarding ABT and its role in improving Nigeria's LCH to achieve Sustainable Development Goal (SDG) 11 are scarce. This research investigates encumbrances to ABT adoption in Nigeria's LCH provision and suggests feasible measures to prevent or reduce the encumbrances, thereby improving achieving SDG 11 (sustainable cities and communities).
Design/methodology/approach
This research utilised qualitative research and adopted a face-to-face interview as the primary data collection. The interviewees comprised ABT practitioners and end users in Nigeria who were chosen by a convenient sampling technique. The study's data were analysed manually through a thematic approach.
Findings
This study shows that stakeholders should embrace ABT in LCH provision to improve achieving SDG 11 in Nigeria. Also, it clustered the perceived 20 encumbrances to ABT adoption in LCH provision into government/policymaker, housing developers/building contractors, ABT users and ABT manufacturers-related issues in Nigeria's context. This study suggested mechanisms to mitigate encumbrances to ABT adoption in LCH provision, thereby improving achieving SDG 11.
Originality/value
This research adds to the limited literature by analysing ABT adoption encumbrances in Nigeria's LCH provision, which could assist policy formulation for the uptake of ABT in LCH provision and improve achieving Goal 11.
Details
Keywords
B.V. Binoy, M.A. Naseer and P.P. Anil Kumar
Land value varies at a micro level depending on the location’s economic, geographical and political determinants. The purpose of this study is to present a comprehensive…
Abstract
Purpose
Land value varies at a micro level depending on the location’s economic, geographical and political determinants. The purpose of this study is to present a comprehensive assessment of the determinants affecting land value in the Indian city of Thiruvananthapuram in the state of Kerala.
Design/methodology/approach
The global influence of the identified 20 explanatory variables on land value is measured using the traditional hedonic price modeling approach. The localized spatial variations of the influencing parameters are examined using the non-parametric regression method, geographically weighted regression. This study used advertised land value prices collected from Web sources and screened through field surveys.
Findings
Global regression results indicate that access to transportation facilities, commercial establishments, crime sources, wetland classification and disaster history has the strongest influence on land value in the study area. Local regression results demonstrate that the factors influencing land value are not stationary in the study area. Most variables have a different influence in Kazhakootam and the residential areas than in the central business district region.
Originality/value
This study confirms findings from previous studies and provides additional evidence in the spatial dynamics of land value creation. It is to be noted that advanced modeling approaches used in the research have not received much attention in Indian property valuation studies. The outcomes of this study have important implications for the property value fixation of urban Kerala. The regional variation of land value within an urban agglomeration shows the need for a localized method for land value calculation.
Details
Keywords
Kanokwan Pimchan and Chonlatis Darawong
This study aims to examine the influence of condominium attributes on resident satisfaction and word of mouth from the perspectives of the elderly in Thailand.
Abstract
Purpose
This study aims to examine the influence of condominium attributes on resident satisfaction and word of mouth from the perspectives of the elderly in Thailand.
Design/methodology/approach
Data were collected from 338 elderly residents through a questionnaire survey and analysed by using descriptive statistics and structural equation modelling procedures.
Findings
The results showed that the strongest predictor of resident satisfaction was design functionality, followed by social environment, safety and security and service quality. In addition, the strongest predictor of word of mouth was safety and security, followed by design functionality, proximity, service quality and social environment.
Research limitations/implications
The data were drawn at the level of the overall characteristics of elderly residents. People may be different in terms of their demographic characters such as gender, age, and user experience.
Practical implications
The study suggests that condominium developers and designers should pay attention to design functionality both physically and mentally such as suitable materials, lighting and common areas. Moreover, the developers should focus on the proximity of the nearest hospitals, safety and security measures, well-trained security personnel and social activity arrangement.
Originality/value
Elderly condominium markets are increasingly growing as a result of the ageing society in Thailand. However, very few empirical studies investigate condominium attributes that affect resident satisfaction and word of mouth provided by real estate developers. The paper aims to determine driving factors that enhance the better well-being of elderly residents.
Details
Keywords
Anas M.M. Awad, Ketut Wikantika, Haytham Ali, Sohaib K.M. Abujayyab and Javad Hashempour
The rapid development of urban areas in Sleman District, Indonesia, has created new challenges for firefighting response services. One of the primary challenges is to identify the…
Abstract
Purpose
The rapid development of urban areas in Sleman District, Indonesia, has created new challenges for firefighting response services. One of the primary challenges is to identify the optimal locations for new fire stations, to improve service quality and maximize service coverage within the specified time.
Design/methodology/approach
This paper proposes a method for precisely calculating travel time that integrates delay time caused by traffic lights, intersections and congestion. The study highlights the importance of precise calculation of travel time in order to provide a more accurate understanding of the service area covered by the fire stations. The proposed method utilizes network analysis in ArcGIS, the analytical hierarchy process (AHP) and simple additive weighting (SAW) to accurately calculate travel time and to identify the best locations for new fire stations. The identification of new site was based on service safety, service quality, service costs and demographic factors and applied to the Sleman district in Indonesia.
Findings
The results showed that the total area covered by old and new fire stations decreased from 61% to 31.8% of the study area when the adjusted default speed scenario was implemented.
Practical implications
The results indicated that the default speed scenario could provide misleading information about the service area, while the adjusted default speed scenario improved service quality and maximized service coverage.
Originality/value
The proposed method provides decision-makers with an effective tool to make informed decisions on optimal locations for new fire stations and thus enhance emergency response and public safety.
Details
Keywords
The main aim of this article is to broaden the notion of strategic intent in public relations. It also develops an understanding of the social value of what can be defined as the…
Abstract
Purpose
The main aim of this article is to broaden the notion of strategic intent in public relations. It also develops an understanding of the social value of what can be defined as the first modern health communication campaign in Europe based on strategic intents and the development of modernity.
Design/methodology/approach
The study is based on both historical research and empirical material from the Norwegian tuberculosis campaign from 1889 up to 1913, when Norwegian women achieved suffrage. The campaign is analysed in the framework of modernity and social theory. The literature on lobbying and social movements is also used to develop a theoretical framework for the notion of strategic intent.
Findings
The study shows that strategic intent can be divided into two layers: (1) the implicit strategic intent is the real purpose behind the communication efforts, whereas (2) the explicit intent is found directly in the communication efforts. The explicit intent may be presented as a solution for the good of society at the right political moment, giving an organisation the possibility to mobilise for long-term social changes, in which could be the implicit intent.
Originality/value
The distinction between explicit and implicit strategic intent broadens our understanding on how to make long-term social changes as well as how social and political changes occur in modern societies. The article also gives a historical account of what is here defined as the first modern health communication campaign in Europe and its social value.
Details
Keywords
Atul Kumar Singh and V.R.Prasath Kumar
Implementing blockchain in sustainable development goals (SDGs) and environmental, social and governance (ESG)-aligned infrastructure development involves intricate strategic…
Abstract
Purpose
Implementing blockchain in sustainable development goals (SDGs) and environmental, social and governance (ESG)-aligned infrastructure development involves intricate strategic factors. Despite technological advancements, a significant research gap persists, particularly in emerging economies. This study aims to address the challenges related to SDGs and ESG objectives during infrastructure delivery remain problematic, identifying and evaluating critical strategic factors for successful blockchain implementation.
Design/methodology/approach
This study employs a three-stage methodology. Initially, 13 strategic factors are identified through a literature review and validated by conducting semi-structured interviews with six experts. In the second stage, the data were collected from nine additional experts. In the final stage, the collected data undergoes analysis using interpretive structural modeling (ISM)–cross-impact matrix multiplication applied to classification (MICMAC), aiming to identify and evaluate the independent and dependent powers of strategic factors driving blockchain implementation in infrastructure development for SDGs and ESG objectives.
Findings
The study’s findings highlight three significant independent factors crucial for successfully integrating blockchain technology (BT) into infrastructure development for SDGs and ESG goals: data security (F4), identity management (F8) and supply chain management (F7). The study unravels these factors, hierarchical relationships and dependencies by applying the MICMAC and ISM techniques, emphasizing their interconnectedness.
Originality/value
This study highlights critical strategic factors for successful blockchain integration in SDG and ESG-aligned infrastructure development, offering insights for policymakers and practitioners while emphasizing the importance of training and infrastructure support in advancing sustainable practices.
Details
Keywords
Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and David John Edwards
In comparison to other countries, power generation in Sub-Saharan Africa is poor. The demand for power has surged in recent times and continues to increase at a fast rate. The…
Abstract
Purpose
In comparison to other countries, power generation in Sub-Saharan Africa is poor. The demand for power has surged in recent times and continues to increase at a fast rate. The public–private partnership (PPP) model has been identified as an option to address the challenges in the power sector. The purpose of this research paper is to critically explore the reasons for entering into PPP power projects in Ghana by the public and private parties.
Design/methodology/approach
Questionnaires were used to elicit responses from respondents using a two-round Delphi survey. From 60 respondents contacted in round one, 48 responses were obtained, and these 48 respondents further took part in round two. Mean score ranking was used to rank the reasons for entering into PPP power projects, while analysis of variance (ANOVA) was run to test significant difference in perceptions among the respondents.
Findings
From round 2 of the Delphi survey, the significant reasons for public sector entering into PPP power projects were as follows: achieving improved value for money, access to additional capital, increased certainty of projects and greater efficiency of project delivery services. For private sector, most significant reasons were as follows: obtaining of investment support, improvement in private sector’s international image and synergy with public sector. From ANOVA analysis, there were significant different perceptions among some of factors on the respondent profile variables and the reasons for entering into PPP power projects, while other factors did not have significant different perception.
Originality/value
Significant reasons for both public and private sectors identified would be incorporated by the government when PPP policy guidelines and laws are reviewed. This will aid in the effective implementation of PPP for power projects.
Details
Keywords
Abdul Rauf, Daniel Efurosibina Attoye and Robert H. Crawford
Recently, there has been a shift toward the embodied energy assessment of buildings. However, the impact of material service life on the life-cycle embodied energy has received…
Abstract
Purpose
Recently, there has been a shift toward the embodied energy assessment of buildings. However, the impact of material service life on the life-cycle embodied energy has received little attention. We aimed to address this knowledge gap, particularly in the context of the UAE and investigated the embodied energy associated with the use of concrete and other materials commonly used in residential buildings in the hot desert climate of the UAE.
Design/methodology/approach
Using input–output based hybrid analysis, we quantified the life-cycle embodied energy of a villa in the UAE with over 50 years of building life using the average, minimum, and maximum material service life values. Mathematical calculations were performed using MS Excel, and a detailed bill of quantities with >170 building materials and components of the villa were used for investigation.
Findings
For the base case, the initial embodied energy was 57% (7390.5 GJ), whereas the recurrent embodied energy was 43% (5,690 GJ) of the life-cycle embodied energy based on average material service life values. The proportion of the recurrent embodied energy with minimum material service life values was increased to 68% of the life-cycle embodied energy, while it dropped to 15% with maximum material service life values.
Originality/value
The findings provide new data to guide building construction in the UAE and show that recurrent embodied energy contributes significantly to life-cycle energy demand. Further, the study of material service life variations provides deeper insights into future building material specifications and management considerations for building maintenance.
Details