Search results

1 – 10 of 574
Open Access
Article
Publication date: 27 February 2024

Maryam R. Nezami, Mark L.C. de Bruijne, Marcel J.C.M. Hertogh and Hans L.M. Bakker

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern…

Abstract

Purpose

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern infrastructures, requiring close collaboration of various infrastructure owners. To effectively manage and improve inter-organizational collaboration (IOC) in infrastructure construction projects, collaboration status should be assessed continually. This study identifies the assessment criteria, forming the foundation of a tool for assessing the status of IOC in interconnected infrastructure projects.

Design/methodology/approach

A systematic literature study and in-depth semi-structured interviews with practitioners in interconnected infrastructure construction projects in the Netherlands are performed to identify the criteria for assessing the status of IOC in infrastructure construction projects, based on which an assessment tool is developed.

Findings

The identified assessment criteria through the literature and the practitioner’s perspectives results in the designing and development of a collaboration assessment tool. The assessment tool consists of 12 criteria and 36 sub-criteria from three different categories of collaborative capacity: individual, relational, and organizational.

Originality/value

The assessment tool enables practitioners to monitor the status of IOC between infrastructure owners and assists them in making informed decisions to enhance collaboration. The assessment tool provides the opportunity to assess and analyze the status of collaboration based on three categories (i.e., individual, relational, and organizational).

Details

Engineering, Construction and Architectural Management, vol. 31 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 February 2024

Luwei Zhao, Qing’e Wang, Bon-Gang Hwang and Alice Yan Chang-Richards

The purpose of this study is to develop a new hybrid method that combines interpretative structural modeling (ISM) and matrix cross-impact multiplication applied to classification…

Abstract

Purpose

The purpose of this study is to develop a new hybrid method that combines interpretative structural modeling (ISM) and matrix cross-impact multiplication applied to classification (MICMAC) to investigate the influencing factors of sustainable infrastructure vulnerability (SIV).

Design/methodology/approach

(1) Literature review and case study were used to identify the possible influencing factors; (2) a semi-structured interview was conducted to identify representative factors and the interrelationships among influencing factors; (3) ISM was adopted to identify the hierarchical structure of factors; (4) MICMAC was used to analyze the driving power (DRP) and dependence power (DEP) of each factor and (5) Semi-structured interview was used to propose strategies for overcoming SIV.

Findings

Results indicate that (1) 18 representative factors related to SIV were identified; (2) the relationship between these factors was divided into a five-layer hierarchical structure. The 18 representative factors were divided into driving factors, dependent factors, linkage factors and independent factors and (3) 12 strategies were presented to address the negative effects of these factors.

Originality/value

The findings illustrate the factors influencing SIV and their hierarchical structures, which can benefit the stakeholders and practitioners of an infrastructure project by encouraging them to take effective countermeasures to deal with related SIVs.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 1 August 2023

Jacob Guerrero and Susanne Engström

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving…

Abstract

Purpose

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving innovation in the transport infrastructure sector.

Design/methodology/approach

Addressing a large public client in Sweden, a case study design was initially applied to provide in-depth insights and perspectives of client project managers’ views and experiences of managing projects expected to drive innovation. In this paper, the concepts of “hard” and “soft” are used to discuss empirical findings on challenges associated with adopting a PM-approach for driving innovation in projects. The empirical material consists of interview data, complemented with observations and archival data.

Findings

Findings reveal challenges associated with combining hard and soft approaches, frequently demonstrating difficulties in balancing short-term project expectations with the promotion of innovation. In line with the literature, project managers note that there is a need for soft approaches to promote development and drive innovation. Yet, findings reflect a situation in which operational success criteria predominate, whereas soft approaches are not sufficiently used to create the grounds required for fostering innovation.

Originality/value

Insights are provided into how PM-approaches may impact construction innovation in the infrastructure sector, demonstrating a need for further research on the challenges and implications of applying and combining hard and soft PM-approaches.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 4 August 2023

MohammedShakil S. Malek and Viral Bhatt

Managing mega infrastructure projects (MIPs) is more complex because of time, size, social, environmental and financial implications. This study aims to address the management…

Abstract

Purpose

Managing mega infrastructure projects (MIPs) is more complex because of time, size, social, environmental and financial implications. This study aims to address the management approaches, complexity and risk factors involved in MIPs. The study focuses on project success criteria and their individual effects on the success of MIPs.

Design/methodology/approach

To address the challenges and identify the most influencing factor for the success of MIPs, the study deployed a cross-sectional survey approach. Six hundred eighty-two usable samples were collected from the respondents to understand the impact of predetermined factors on the success of MIPs. The structural equation model and artificial neural network approach were used to derive the importance of factors affecting the success of MIPs.

Findings

The study's outcome confirms that all three influencing factors: feasibility studies, community engagements and contract selection, have a significant positive impact on the success of MIPs. Community engagement amongst all three has the most influential predictor for the success of MIPs.

Originality/value

The developed model will enable practitioners and policymakers from Indian construction companies and other emerging nations to concentrate on recognized risk reduction variables to enhance project success criteria and project management success, especially for MIPs.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 September 2024

Ghiwa Assaf and Rayan H. Assaad

Project bundling is an innovative practice that groups or bundles several infrastructure projects into a single contract. While project bundling has various benefits, agencies are…

Abstract

Purpose

Project bundling is an innovative practice that groups or bundles several infrastructure projects into a single contract. While project bundling has various benefits, agencies are facing some challenges when bundling their projects, including properly assessing the feasibility (or infeasibility) of project delivery methods (PDMs) of interest. More specifically, project owners face the challenge of properly selecting between traditional and alternative PDMs for their bundled projects. Although some research efforts were devoted to providing guidelines in relation to different aspects related to project bundling, no previous study was conducted to help project owners performing PDMs-related feasibility analysis for bundled projects, which differ from normal, singly delivered projects. To fill this knowledge gap, this paper develops a decision-support tool that assists agencies in deciding whether they should select a traditional or alternative PDM (i.e. whether to go with the Design-Bid-Build (DBB) PDM or not) for their bundled projects.

Design/methodology/approach

An analytical methodology comprised of four main steps was followed in this paper. First, an expert survey was developed and distributed to industry experts to quantify the importance of 25 project bundling objectives. Second, principal component analysis was used to determine the weights for the different project bundling objectives. Third, a series of statistical tests was implemented to identify different feasibility tiers. Fourth, a user-friendly decision-support tool was developed, and its capabilities were demonstrated.

Findings

The results showed that six tiers exist to classify the feasibility (or infeasibility) of traditional PDMs (i.e. the DBB method) for bundled projects. The research outcomes have also reflected that the following five project bundling objectives contribute the most to making traditional PDMs (i.e. the DBB method) more feasible for bundled projects: (1) Having well-defined design features; (2) Requiring prior knowledge or experience with similar project size and scope; (3) Completing the overall project on schedule; (4) Keeping rate of expenditures within cash flow plan; and (5) Acquiring specific legislative, regulatory and jurisdictional requirements early on.

Originality/value

This research adds to the body of knowledge by equipping agencies and project owners with a decision-support system that helps them identify whether traditional or alternative PDMs are more appropriate for the specific objectives of their bundling program(s). By making the right PDM decision, project owners can enhance their bundling practices (especially in relation to the PDM proper selection) and ultimately the performance of their bundled projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 23 April 2024

Anna Kadefors, Kirsi Aaltonen, Stefan Christoffer Gottlieb, Ole Jonny Klakegg, Pertti Lahdenperä, Nils O.E. Olsson, Lilly Rosander and Christian Thuesen

Relational contracting is increasingly being applied to complex and uncertain construction projects. However, it has proved hard to achieve stable performance and industry-level…

Abstract

Purpose

Relational contracting is increasingly being applied to complex and uncertain construction projects. However, it has proved hard to achieve stable performance and industry-level learning in this field. This paper employs an institutional perspective to analyze how legitimacy for relational contracting has been produced and challenged in Denmark, Finland, Norway and Sweden, including implications for dissemination and learning.

Design/methodology/approach

A collaborative case study design is used, where longitudinal accounts of the developments in relational contracting over more than 25 years in four Nordic countries were developed by scholars based in each country. The descriptions are underpinned by literature sources from research, practice and policy.

Findings

The countries share similar problem perceptions that have triggered the de-institutionalization of traditional contracting practices. Models and policies developed elsewhere are important sources of knowledge and legitimacy. Most countries have seen pendulum movements, where dissemination of relational contracting is followed by backlashes when projects fail to meet projected outcomes. Before long, however, relational contracting tends to re-emerge under new labels and in slightly new forms. Such a proliferation of concepts presents further obstacles to learning. Successful institutionalization is found to rely on realistic goals in combination with broad competence development at the organizational and industry levels.

Practical implications

In seeking inspiration from other countries, policymakers should go beyond contract models to also consider strategies to manage industry-level learning.

Originality/value

The paper provides a unique longitudinal cross-country perspective on the field of relational contracting. As such, it contributes to the small stream of literature on long-term institutional change in the construction sector.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 8 November 2022

Ahmad Shah Kakar, Abid Hasan, Kumar Neeraj Jha and Amarjit Singh

The Afghan construction industry faces resource shortages and heavily relies on foreign aid to fund public projects on the path to recovery and reconstruction. While the resource…

Abstract

Purpose

The Afghan construction industry faces resource shortages and heavily relies on foreign aid to fund public projects on the path to recovery and reconstruction. While the resource constraints demand cost-efficient delivery of construction projects, many Afghan public projects experience delays and cost overruns. This study aims to evaluate various attributes and factors influencing cost performance in public construction projects in Afghanistan.

Design/methodology/approach

The literature review and Delphi method identified 30 cost performance attributes relevant to the context of Afghanistan. Next, a questionnaire survey was conducted with construction management professionals working in the public sector in the Afghan construction industry to evaluate these attributes.

Findings

This study found that the lack of resources, poor project management skills and corruption in procurement are the leading causes behind cost overruns in Afghan public projects. This study also identified five latent factors influencing cost performance in public projects in Afghanistan: competency of the project team, socioeconomic and political support, governance and public procurement, planning and risk management and project characteristics.

Research limitations/implications

The exploratory factor analysis did not reveal the relative significance of different cost performance success factors. Moreover, the ranking of cost performance attributes is based on the responses from the public sector construction professionals only.

Practical implications

The construction industry in Afghanistan significantly contributes to the country’s social and economic growth and employment. This study’s findings will help researchers, project sponsors, government departments and industry practitioners interested in improving the cost performance in Afghan public projects.

Originality/value

Given the scarcity of research in war-affected and conflict-sensitive regions, this study fills a research gap on project cost performance by providing insights into the cost performance success factors in public projects in Afghanistan.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 21 July 2022

Anna-Therése Järvenpää, Johan Larsson and Per Erik Eriksson

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Abstract

Purpose

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Design/methodology/approach

Semi-structured interviews about six infrastructure projects were conducted to identify respondents’ views on innovation possibilities. These possibilities were then analyzed from an organizational control perspective within principal–agent relationships between the Swedish Transport Administration (STA) and their contractors.

Findings

How the client uses control systems affects innovation possibilities. Relying on process control could negatively affect innovation opportunities, whereas output control could have a positive influence. In addition, social control seems to have a weak effect, as the STA appears not to use social control to facilitate joint innovation. Public clients must comply with the Public Procurement Act and, therefore, retain the requirements specified in the tendering documents. Much of the steering of the execution is connected to the ex ante phase (before signing the contract), which affects innovation possibilities in the design and execution phases for the contractor.

Research limitations/implications

This study was conducted with only one client, thus limiting its generalizability. However, the findings provide an important stepping stone to further investigation into balancing control systems and creating innovation possibilities in a principal–agent relationship.

Originality/value

Although public procurement has increasingly been emphasized as a major potential source of innovation, studying how a public client’s use of organizational control systems affects innovation possibilities in the construction sector has received scant attention.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 16 February 2023

Yanliang Niu, Huimin Li, Xiaowei Luo and Xiaopeng Deng

Members in the international joint ventures (IJVs) for high-speed rail (HSR) projects usually engage in coopetition interactions to create common benefits (CB) and simultaneously…

Abstract

Purpose

Members in the international joint ventures (IJVs) for high-speed rail (HSR) projects usually engage in coopetition interactions to create common benefits (CB) and simultaneously safeguard private benefits (PB). Previous studies of coopetition and performance using variance-based methods usually ignore the combinational influence of diverse coopetition constructs on performance, which can be effectively compensated by adopting a configuration perspective. Therefore, this research aims to ascertain various combinations of three coopetition constructs (coopetition relationship, coopetition capability and coopetition strategy) that lead to high IJVs’ performance through a configuration approach.

Design/methodology/approach

First, the research framework of coopetition configuration was established, and the key constructs were operationalized, which were validated by expert interviews. Then the information on 12 HSR IJVs was collected and quantified through nine rounds of interviews and a questionnaire survey. Later, the fuzzy-set qualitative comparative analysis (fsQCA) was applied to explore what coopetition configurations benefit the CB or PB achievement.

Findings

Configuration results indicate that six coopetition configurations lead to CB outcome and seven configurations lead to PB outcome. Based on the results, coopetition contexts are divided into four categories: firm-based coopetition, project-based coopetition, firm-project-based coopetition and none-based coopetition. Then, a selection scheme for coopetition strategies in various contexts has been developed. The results also show that the core conditions mostly appear in the coopetition relationships and coopetition strategies dimensions, and the optimal coopetition strategies vary in different contexts.

Originality/value

This study enhances the theoretical understanding of coopetition in HSR IJVs and assists relative HSR industrialists, as well as the mega infrastructure project managers, in IJVs’ implementation. The configuration perspective of this paper also contributes to a systemic and holistic view of coopetition in HSR IJVs.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 September 2024

Ayodeji Emmanuel Oke, John Aliu, Samuel Ukaha Onyeukwu, Paramjit Singh Jamir Singh, Rosfaraliza Azura Ramli and Mohamad Shaharudin Samsurijan

Despite the growing use of Fourth Industrial Revolution (4IR) technologies in construction, the reasons behind adopting social media in this context and its real benefits for…

Abstract

Purpose

Despite the growing use of Fourth Industrial Revolution (4IR) technologies in construction, the reasons behind adopting social media in this context and its real benefits for sustainable construction and productivity remain unclear. This study aims to examine how construction professionals perceive the impact of social media on sustainable construction and productivity in the industry.

Design/methodology/approach

This research used a mixed-methods research approach (qualitative and quantitative), resulting in the formulation of a well-structured questionnaire which was distributed to construction professionals. Ordinal regression and multinomial logistic regression were carried out to assess the impact of social media use on sustainable construction and productivity enhancement, as well as the extent of social media utilization in construction projects.

Findings

Through exploratory factor analysis, five distinct clusters of social media consequences were identified, namely: information and knowledge sharing, community engagement and morale, environmental and resource management, disruptive and stressful effects and communication and collaboration. Furthermore, the extent of social media usage is closely related to three key factors: community engagement and morale, environmental and resource management and communication and collaboration.

Originality/value

This study represents one of the pioneering research efforts in Nigeria to investigate the implications of social media usage in the construction industry. Thus, future studies can build upon this research to further contribute to the multifaceted dimensions of social media’s impact on the construction industry.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 574