Conor Shaw, Flávia de Andrade Pereira, Karim Farghaly, Cathal Hoare, Timo Hartmann and James O'Donnell

This research demonstrates the theoretical merit of a reference architecture-based approach to life cycle cost (LCC) analysis system provision in the built environment. LCC…

Abstract

Purpose

This research demonstrates the theoretical merit of a reference architecture-based approach to life cycle cost (LCC) analysis system provision in the built environment. LCC insight is considered fundamental to sustainable decision making by asset managers; however, the current capabilities in practice do not align with the political ambition and the scale of competencies required to realise sectoral emissions–reduction targets.

Design/methodology/approach

In pursuing practical outcomes, the study employs a custom design science research-inspired methodology. Domain requirements are gathered via literature research as an initial top-down software reference architecture which is refined, bottom-up, through testing and implementation in a representative case study. A prototype IT system and reference architecture artefact are developed and used to evaluate the concept qualitatively through broad practitioner focus groups.

Findings

Sentiment analysis of the expert opinions is broadly positive and helps to substantiate the proposal’s theoretical suitability in addressing the scalability challenge. Additionally, constructive feedback provides guidance towards this trajectory, highlighting the importance of aligning with existing communities and standards, broadening future research scope to consider further scenarios and prioritisation of efforts to build trust around contracts and data quality.

Originality/value

The novelty of the work is the provision of the reusable LCC reference architecture development methodology.

Practical implications

The concept has the potential to provide LCC capabilities to industry at scale while the artefacts developed herein can be appended to existing LCC standards as implementation guidance to support IT system developers. Furthermore, the developed methodology can be employed in harmonisation efforts between policy and practice.

Details

Built Environment Project and Asset Management, vol. 14 no. 5
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 8 July 2024

Abraham Kuol, Koorosh Gharehbaghi, Ken Farnes, Kong Fah Tee and Kerry McManus

While efficient design in engineering projects is crucial, this paper aims to examine the integration of Building Information Modeling (BIM) into railway Intelligent…

79

Abstract

Purpose

While efficient design in engineering projects is crucial, this paper aims to examine the integration of Building Information Modeling (BIM) into railway Intelligent Transportation Systems (ITS). The paper provides some key understanding of integrating BIM and ITS to improve the efficiency of railway infrastructure projects.

Design/methodology/approach

An in-depth qualitative analysis of three ITS case studies was conducted to understand BIM’s global impact and benefits in railway infrastructure projects. While case study one investigated the Crossrail (UK), the other two case studies were TUC Rail (Belgium) and the Intercity railway network (Norway).

Findings

The findings include the specific benefits of BIM, regarding the railway infrastructure. The result indicated that BIM benefits were consistently the same across all case studies. Although Case study 1 was the only one that boasts a high reduction in waste and reworks, all of the case studies showed less rework and delays due to BIM. The results indicated that the advantages of BIM for such projects are cost optimization, reduction in waste, rework and lessening delays. Subsequently, this leads to the ease and efficiency with which structures and railways can be built. The outcomes can ultimately assist transportation planners in better planning and managing railway projects.

Practical implications

This study proposes the integration of BIM into railway projects as a part of their ITS. The BIM integration into railway projects as a part of their ITS fits within the overall planning to handover phases. Specifically, the BIM integration improves the design process of typical railway projects. Thus, the most significant advantage of BIM for railway projects is to further improve their design process leading to a higher degree of constructability.

Originality/value

Railway infrastructure performs a major role in economic and regional development. The complexity of railway projects continues to increase as the need for more railway infrastructure is on the rise globally. BIM is proving to be an effective tool for improving the efficiency of railway infrastructure projects. As the utilization of BIM is intensifying, the railway industry can further exploit BIM to improve project delivery adeptness by offering greater collaboration leading to efficient design processes. As a result, the understanding of BIM for horizontal projects such as railway infrastructure on a global scale is a substantial exercise that this research aims to respond to.

Details

Technological Sustainability, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2754-1312

Keywords

Article
Publication date: 22 August 2024

Chisomo Kapatsa, Neema Kavishe, Sambo Lyson Zulu and Godwin Maro

The purpose of this study is to identify sustainability assessment indicators of road infrastructure projects by analyzing and synthesizing existing literature, considering that…

Abstract

Purpose

The purpose of this study is to identify sustainability assessment indicators of road infrastructure projects by analyzing and synthesizing existing literature, considering that, despite being essential to achieving the sustainable development goals, sustainability performance in road infrastructure projects is a persistent challenge. Therefore, determining how sustainability can be assessed in these projects is crucial, necessitating a systematic review of the sustainability assessment indicators of road infrastructure projects.

Design/methodology/approach

Using PRISMA principles, 54 peer-reviewed papers from 2010 to 2022 were retrieved from three search databases (Scopus, Research for Life and Google Scholar) as part of a systematic literature review. Data analysis techniques included both descriptive and content analysis.

Findings

The study identified 22 indicators. The results emphasized that the sustainability of road infrastructure projects should consider all three sustainability dimensions to provide development while meeting human needs, preserving the planet Earth and enhancing economic growth. Similarly, indicators should be incorporated from the design phase to implement and attain sustainability successfully.

Practical implications

The outcome of this study will serve as a guide to road infrastructure stakeholders to understand the relevant sustainability indicators to assess the sustainability performance of their projects.

Originality/value

The study’s findings provide the sustainability assessment indicators for roads, which serve as a foundation for developing a sustainability assessment indicator framework for road infrastructure projects. Future research can look at establishing the indicators for the end-of-life phase of the project lifecycle.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 15 August 2024

Meiqi Lu and Maxwell Fordjour Antwi-Afari

Recent emerging information technologies like digital twin (DT) provide new concepts and transform information management processes in the architecture, engineering and…

Abstract

Purpose

Recent emerging information technologies like digital twin (DT) provide new concepts and transform information management processes in the architecture, engineering and construction (AEC) industry. Although numerous articles are pertinent to DT applications, existing research areas and potential future directions related to the state-of-the-art DT in project operation and maintenance (O&M) are yet to be studied. Therefore, this paper aims to review the state-of-the-art research on DT applications in project O&M.

Design/methodology/approach

The current review adopted four methodological steps, including literature search, literature selection, science mapping analysis and qualitative discussion to gain a deeper understanding of DT in project O&M. The impact and contribution of keywords and documents were examined from a total of 444 journal articles retrieved from the Scopus database.

Findings

Five mainstream research topics were identified, including (1) DT-based artificial intelligence technology for project O&M, (2) DT-enabled smart city and sustainability, (3) DT applications for project asset management, (4) Blockchain-integrated DT for project O&M and (5) DT for advanced project management. Subsequently, research gaps and future research directions were proposed.

Originality/value

This study intends to raise awareness of future research by summarizing the current DT development phases and their impact on DT implementation in project O&M among researchers and practitioners.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 January 2022

The-Quan Nguyen, Eric C.W. Lou and Bao Ngoc Nguyen

This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers…

Abstract

Purpose

This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers for the following questions: (1) When to start the QTO processes to facilitate the contract progress payments? (2) What information is required to measure the quantity of works to estimate contract progress payment (3) What are the challenges to manage (i.e. create, store, update and exploit)? What are the required information for this BIM use? and (4) How to process the information to deliver BIM-based QTO to facilitate contract progress payment?

Design/methodology/approach

The paper applied a deductive approach and expert consensus through a Delphi procedure to adapt to current innovation around BIM-based QTO. Starting with a literature review, it then discusses current practices in BIM-based QTO in general and high-rise building projects in particular. Challenges were compiled from the previous studies for references for BIM-based QTO to facilitate contract progress payment for high-rise building projects in Vietnam. A framework was developed considering a standard information management process throughout the construction lifecycle, when the BIM use of this study is delivered. The framework was validated with Delphi technique.

Findings

Four major challenges for BIM-based QTO discovered: new types of information required for the BIM model, changes and updates as projects progress, low interoperability between BIM model and estimation software, potentiality of low productivity and accuracy in data entry. Required information for QTO to facilitate progress payments in high-rise building projects include Object Geometric/Appearance Information, Structural Components' Definition and Contextual Information. Trade-offs between “Speed – Level of Detail–Applicable Breadth” and “Quality – Productivity” are proposed to consider the information amount to input at a time when creating/updating BIM objects. Interoperability check needed for creating, authoring/updating processing the BIM model's objects.

Research limitations/implications

This paper is not flawless. The first limitation lies in that the theoretical framework was established only based on desk research and small number of expert judgment. Further primary data collection would be needed to determine exactly how the framework underlies widespread practices. Secondly, this study only discussed the quantity take-off specifically for contract progress payment, but not for other purposes or broader BIM uses. Further research in this field would be of great help in developing a standard protocol for automatic quantity surveying system in Vietnam.

Originality/value

A new theoretical framework for BIM-based QTO validated with Delphi technique to facilitate progress payments for high-rise building projects, considering all information management stages and the phases of information development in the project lifecycle. The framework identified four types of information required for this QTO, detailed considerations for strategies (Library Objects Development, BIM Objects Information Declaration, BIM-based QTO) for better managing the information for this BIM use. Two trade-offs of “Speed – LOD–Applicable Breadth” and “Quality – Productivity” have been proposed for facilitating the strategies and also for enhancing the total efficiency and effectiveness of the QTO process.

Details

International Journal of Building Pathology and Adaptation, vol. 42 no. 4
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 14 March 2023

Mohammad Javad Zoleykani, Hamidreza Abbasianjahromi, Saeed Banihashemi, Seyed Amir Tabadkani and Aso Hajirasouli

Extended reality (XR) is an emerging technology, with its popularity rising in different industry sectors, where its application has been recently considered in construction…

Abstract

Purpose

Extended reality (XR) is an emerging technology, with its popularity rising in different industry sectors, where its application has been recently considered in construction safety. This study aims to investigate the applications of XR technologies in the safety of construction through projects lifecycle perspective.

Design/methodology/approach

Scientometric analysis was conducted to discover trends, keywords, contribution of countries and publication outlets in the literature. The content analysis was applied to categorize previous studies into three groups concerning the phase of lifecycle in which they used XR.

Findings

Results of the content analysis showed that the application of XR in the construction safety is mostly covered in two areas, namely, safety training and risk management. It was found that virtual reality was the most used XR tool with most of its application dedicated to safety training in the design phase. The amount of research on the application of augmented reality and mixed reality in safety training, and risk management in all phases of lifecycle is still insignificant. Finally, this study proposed three main areas for using the XR technologies regarding the safety issues in future research, namely, control of safety regulations and safety coordination in construction phase, and safety reports in the operation phase.

Originality/value

This paper inspected the utilization of all types of XR for safety in each phase of construction lifecycle and proposed future directions for research by addressing the safety challenges in each phase.

Details

Construction Innovation , vol. 24 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 11 September 2024

Cláudia Ascenção, Henrique Teixeira, João Gonçalves and Fernando Almeida

Security in large-scale agile is a crucial aspect that should be carefully addressed to ensure the protection of sensitive data, systems and user privacy. This study aims to…

Abstract

Purpose

Security in large-scale agile is a crucial aspect that should be carefully addressed to ensure the protection of sensitive data, systems and user privacy. This study aims to identify and characterize the security practices that can be applied in managing large-scale agile projects.

Design/methodology/approach

A qualitative study is carried out through 18 interviews with 6 software development companies based in Portugal. Professionals who play the roles of Product Owner, Scrum Master and Scrum Member were interviewed. A thematic analysis was applied to identify deductive and inductive security practices.

Findings

The findings identified a total of 15 security practices, of which 8 are deductive themes and 7 are inductive. Most common security practices in large-scale agile include penetration testing, sensitive data management, automated testing, threat modeling and the implementation of a DevSecOps approach.

Originality/value

The results of this study extend the knowledge about large-scale security practices and offer relevant practical contributions for organizations that are migrating to large-scale agile environments. By incorporating security practices at every stage of the agile development lifecycle and fostering a security-conscious culture, organizations can effectively address security challenges in large-scale agile environments.

Details

Information & Computer Security, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2056-4961

Keywords

Article
Publication date: 10 July 2023

Senuri Siriwardhana and Robert Moehler

Skills development among construction stakeholders has become an increasingly urgent necessity for the successful implementation of Construction 4.0 in recent years. There is a…

Abstract

Purpose

Skills development among construction stakeholders has become an increasingly urgent necessity for the successful implementation of Construction 4.0 in recent years. There is a lack of comprehensive analysis on the domain of Construction 4.0 implementation, with a focus on skills development. This study aims to address this gap through the use of the science mapping approach to show the gaps of research domain and propose future directions.

Design/methodology/approach

This study adopted a three-step holistic review approach, comprising bibliometric review, scientometric analysis, and qualitative discussion, to obtain a comprehensive overview of research in the field of Construction 4.0 skills development. f on a total of 57 articles published in three databases, the influential sources, keywords, scholars, and articles in the domain were analysed. A follow-up discussion aimed to identify main-stream research topics, research gaps, and future research directions.

Findings

Findings discovered that the topics were concerned about Construction 4.0 whilst skills development aspect was lacking in creation of policies, frameworks, strategies in different contexts. The study revealed research gaps such as presence of skills gaps and shortages in some countries, the lack of frameworks and roadmaps for successful Construction 4.0 implementation, and the lack of readiness assessments from professional, company and industry viewpoints.

Originality/value

This study contributes to the knowledge in the domain of Construction 4.0 and the contribution of skills development for its implementation and a comprehensive overview with research gaps and future research directions in the domain.

Details

Smart and Sustainable Built Environment, vol. 13 no. 4
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 21 April 2023

Ehsan Shekarian, Anupama Prashar, Jukka Majava, Iqra Sadaf Khan, Sayed Mohammad Ayati and Ilkka Sillanpää

Recently, interest in sustainability has grown globally in the heavy vehicle and equipment industry (HVEI). However, this industry's complexity poses a challenge to the…

3179

Abstract

Purpose

Recently, interest in sustainability has grown globally in the heavy vehicle and equipment industry (HVEI). However, this industry's complexity poses a challenge to the implementation of generic sustainable supply chain management (SSCM) practices. This study aims to identify SSCM's barriers, practices and performance (BPP) indicators in the HVEI context.

Design/methodology/approach

The results are derived from case studies of four multinational manufacturers. Within-case and cross-case analyses were conducted to categorise the SSCM BPP indicators that are unique to HVEI supply chains.

Findings

This study's analysis revealed that supply chain cost implications and a deficient information flow between focal firms and supply chain partners are the key barriers to SSCM in the HVEI. This analysis also revealed a set of policies, programmes and procedures that manufacturers have adopted to address SSCM barriers. The most common SSCM performance indicators included eco-portfolio sales to assess economic performance, health and safety indicators for social sustainability and carbon- and energy-related measures for environmental sustainability.

Practical implications

The insights can help HVEI firms understand and overcome the typical SSCM barriers in their industry and develop, deploy and optimise their SSCM strategies and practices. Managers can use this knowledge to identify appropriate mechanisms with which to accelerate their transition into a sustainable business and effectively measure performance outcomes.

Originality/value

The extant SSCM literature has focused on the light vehicle industry, and it has lacked a concrete examination of HVEI supply chains' sustainability BPP. This study develops a framework that simultaneously analyses SSCM BPP in the HVEI.

Details

Benchmarking: An International Journal, vol. 31 no. 6
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 19 September 2024

Diana Ominde, Edward Godfrey Ochieng and Tarila Zuofa

The purpose of this study is to examine the influence of stakeholder integration and project complexity on information technology (IT) projects in Kenya. The following research…

Abstract

Purpose

The purpose of this study is to examine the influence of stakeholder integration and project complexity on information technology (IT) projects in Kenya. The following research question guided our inquiry: what is the influence of project complexity and stakeholder integration on the performance of IT projects in Kenya?

Design/methodology/approach

To advance the current understanding of the effect of stakeholder integration and project complexity on IT projects, multiple regressions were used to predict how project complexity and stakeholder integration influence project performance. Both government-funded and privately funded IT projects from a developing country were examined.

Findings

The study found that any project’s complexity and stakeholder integration levels offer a distinctive contribution to its success. Theoretically, the study contributes to linkages between stakeholder integration and project complexity concerning IT project performance. Through the adoption of actionable research and theoretical elaboration, we have shown that the successful execution of IT projects is driven by the successful integration of stakeholders and monitoring the level of complexity at each phase of the project.

Originality/value

The findings of this study add to the burgeoning literature on the performance of IT projects and come with several managerial implications as well. It brings to the fore the concept of stakeholder integration as an essential element of project success. The findings suggest that the inclusion of stakeholder integration into corporate decisions, strategies and policies can be an asset to the production of sustainable competitive advantages needed during the implementation of IT projects in government entities and organisations. As shown in this study, all the above require a collaborative platform allowing for data sharing among diverse stakeholders to ameliorate distrust or lack of information.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article