Article
Publication date: 28 March 2022

Muhammad Ayat, Azmat Ullah and Changwook Kang

The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects…

Abstract

Purpose

The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects in developing countries.

Design/methodology/approach

The main data set for this study was collected from the World Bank database consisting of 8,951 PPI projects that occurred in developing countries from 1996 to 2020. Hierarchical logistic regression was applied for investigating the effects of USPs on project success. Three moderators, namely, control of corruption, presence of local sponsor and project size were also included in the model to test the impact of their interactions with the USP on the performance of PPI projects. Further, to assess the impact of the effect of USPs, the average marginal effect was calculated. The framework used in this study consists of 18 control variables, three moderators and one noncontrolled independent variable (the USP).

Findings

The results of hierarchical logistic regression indicate that USPs have a significant and negative effect on the success of PPI projects occurring in developing countries. The negative effect of a USP weakens with the presence of local sponsors and stronger control of corruption in the host country. However, contrary to the authors’ expectations, the results show that project size does not significantly affect the association between USPs and the success of PPI projects. Moreover, the results of average marginal effects show that the negative impact of USP on the success of PPI projects ranges between 2.4% and 3.8%.

Originality/value

This study quantifies the negative impact of USP on the success of PPI projects in developing countries, which will be helpful for the practitioners to understand the associated risk with USP projects. Furthermore, it also identifies the moderating roles of control of corruption and the presence of local sponsors on the relationship between USP and the success of PPI projects.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 2 January 2024

Andreas Wibowo

This paper delves into the ex ante rates of return demanded by the private sector in Indonesian public–private partnership (PPP) infrastructure projects and the manifold factors…

Abstract

Purpose

This paper delves into the ex ante rates of return demanded by the private sector in Indonesian public–private partnership (PPP) infrastructure projects and the manifold factors emanating from project attributes that can influence these rates.

Design/methodology/approach

This paper analyzes feasibility studies of 37 PPP projects across different sectors. The studies were carefully selected based on relevance, completeness and validity of data. The analysis uses statistical techniques, including Levene’s tests, t-tests, ANOVA tests, Cohen’s effect size and Pearson correlations, to explore differences in cost of capital and excess returns across various attributes.

Findings

Based on the statistical analysis, no significant difference exists between the excess return of 200 basis points (bps) and the equity excess return of 0 bps. This suggests that the eligibility criteria for PPP projects require an internal rate of return (IRR) equal to the weighted average cost of capital plus 200 bps or an equity IRR equal to the cost of equity. The variations in the tested variables among diverse project attributes do not exhibit statistically significant disparities, even though specific attributes display moderate to high effect sizes.

Originality/value

This paper represents one of the first attempts to examine the rates of return demanded by the private sector in the context of Indonesian PPP projects. It comprehensively explores the factors that influence these rates, drawing on insights derived from feasibility studies.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Book part
Publication date: 17 November 2023

Simon Ofori Ametepey, Clinton Ohis Aigbavboa and Wellington Didibhuku Thwala

The essence of finance has become essential in the sustainability discussion in recent times as a result of the capital intensive nature of sustainable projects. This has…

Abstract

The essence of finance has become essential in the sustainability discussion in recent times as a result of the capital intensive nature of sustainable projects. This has motivated financial experts and institutions to develop various financial instruments and mechanisms to further advance the course of protecting the environment, and decreasing the release of excess carbon and GreenHouse Gases. This is to also provide the opportunity for funding Green or sustainable infrastructure development. This chapter advances a discourse on matters relating to sustainable financing of infrastructure projects. The fundamentals of sustainable or green funding of infrastructure projects, and sustainable schemes of financing green infrastructure projects are discussed.

Details

Sustainable Road Infrastructure Project Implementation in Developing Countries: An Integrated Model
Type: Book
ISBN: 978-1-83753-811-9

Open Access
Article
Publication date: 17 October 2023

Sajida and Bevaola Kusumasari

This paper aims to identify the factors affecting the implementation of Public-Private Partnerships (PPPs) in the education sector.

1837

Abstract

Purpose

This paper aims to identify the factors affecting the implementation of Public-Private Partnerships (PPPs) in the education sector.

Design/methodology/approach

Based on Scopus and adopting the protocol of Staples and Niazi (2007), this systematic literature review examined 21 articles on PPPs in the education sector. Content analysis is adopted to identify research gaps and provide information on critical issues in the cases.

Findings

The findings have identified the critical success factors of PPPs in the education sector in 12 countries, revealing varying degrees of success and implementation challenges. They reflect the importance of clear objectives, effective communication, and robust partnerships between the public and private sectors to achieve success. These insights contribute to an in-depth understanding of PPP implementation in education, which can guide future projects.

Originality/value

The critical success factors identified in PPPs implementation in education across various countries may provide a comprehensive worldwide perspective for researchers, practitioners and policymakers.

Details

Public Administration and Policy, vol. 26 no. 3
Type: Research Article
ISSN: 1727-2645

Keywords

Article
Publication date: 2 November 2023

Hung Duy Nguyen, Tuan Anh Nguyen, Vi Vu Doan and Chau Ngoc Dang

Public–private partnership (PPP) projects play a pivotal role in fostering infrastructure development in developing countries. This study aims to identify major barriers and…

Abstract

Purpose

Public–private partnership (PPP) projects play a pivotal role in fostering infrastructure development in developing countries. This study aims to identify major barriers and critical success factors (CSFs) for PPP projects in Vietnam.

Design/methodology/approach

The study initially conducted an extensive literature review and interviewed industry experts to compile a comprehensive list of barriers and success factors. Subsequently, a survey involving 250 construction professionals was conducted to assess these identified factors. The research used both ANOVA test and hierarchical regression analysis to explore the relationship between participants’ characteristics and assessments.

Findings

The results could provide a valuable reference for practitioners by assessing barriers and CSFs in PPP projects. Specifically, the ANOVA analysis indicated a positive correlation between barrier assessment and participants’ experience, while the influence of participants’ sector on the evaluation was minor. Furthermore, the hierarchical regression analysis demonstrated that participants’ sector did not moderate the relationship between barrier assessment and industry experience.

Originality/value

This research contributes to the existing literature by offering empirical insights into barriers and CSFs specific to PPP projects in a developing country context. The findings highlight the crucial role of experienced professionals in ensuring PPP project success. Moreover, the study provides construction practitioners with a better understanding of the essential factors and supports the development of effective management strategies for future PPP projects.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 21 December 2023

Georgios Koligiannis, Maria Drakaki and Panagiotis Tzionas

This paper aims to highlight how the Greek State tried to improve public procurement processes during the outbreak of the COVID-19 pandemic and propose measures that could be…

Abstract

Purpose

This paper aims to highlight how the Greek State tried to improve public procurement processes during the outbreak of the COVID-19 pandemic and propose measures that could be implemented in a future force majeure event where the global supply chain will not operate efficiently.

Design/methodology/approach

The authors investigated the existing scientific literature. Afterwards, they designed a questionnaire to gather primary data and add value to the current literature.

Findings

The research paper results highlight that in future force majeure events, the best way for effective public procurement is to implement central procurement, framework agreements with more than one economic operator and use the newly established Public Buyers Community in the European Union. The questionnaire interviews also highlighted that payment terms could be adjusted to the needs of the suppliers to improve their financial flows, which are disrupted in case of a force majeure event.

Research limitations/implications

One of the limitations of the present case study is that apart from the Greek procurement Laws and policy documents related to the COVID-19 pandemic, only scientific articles written in English were used by the authors in the literature review section.

Practical implications

The findings could benefit public contracting authorities and central procurement bodies when designing their processes in case of a force majeure event like the COVID-19 pandemic. As the public contracting authorities and the procurement officers are more informed about potential ways to improve the public procurement processes, they might apply measures that could facilitate the flexibility of the procurement processes.

Social implications

The research paper can provide lessons learned to policy makers, when they have to cope with similar challenges in the future.

Originality/value

To the best of the authors' knowledge, no previous scientific article has examined how the Greek State has tried to respond to the supply shortages created during the pandemic. Furthermore, this is the first study in Greece that gathers primary data from public procurement practitioners.

Details

Journal of Public Procurement, vol. 24 no. 1
Type: Research Article
ISSN: 1535-0118

Keywords

Article
Publication date: 30 January 2024

Frank Ato Ghansah and Weisheng Lu

While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the…

Abstract

Purpose

While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the post-pandemic era and future pandemics, especially cross-border construction logistics and supply chain (Cb-CLSC). Thus, this study aims to develop a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully.

Design/methodology/approach

This is achieved pragmatically through an embedded mixed-method design involving a literature review, survey and interview from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory. The design is further integrated with the partial least squares structural equation modelling (PLS-SEM) approach.

Findings

The study revealed 10 critical managerial practices (MPs) to position the QA to be adequate for the post-pandemic and during future pandemics, with the top three including “strict observance of government regulations (MP1)”, “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)” and “modification of contract to cater for uncertainties (MP4)”. This attained a relatively good percentage agreement of 53% between the industry and academia. However, the top four MPs regarded as very effective include “implementing digital collaborative inspections with subcontractors and trades (MP8)”, “implementing a digital centralized document and issue management system (MP7)”, “strict observance to government regulations, including vaccination of workers, social distancing, use of prescribed nose masks, etc. (MP1)” and “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)”. Two underlying components of the MPs were revealed as policy-process (PP)-related practices and people-technology-process (PTP)-related practices, and these can be modelled into a managerial framework capable of effectively positioning the QA to be adequate during pandemics through to the post-pandemic era.

Practical implications

The findings of this study depicted significant theoretical and practical contributions to the proactive management of QA activities during pandemics through to the post-pandemic era. It could empower organisations to pay attention to smartly and innovatively balancing people, processes, pandemic policy and technology to inform decisions to effectively position the QA for the post-pandemic era and survive the risks of future pandemics.

Originality/value

The study contributes to the body of knowledge in that it develops a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully. It is original research with invaluable primary data in the form of surveys and interviews from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 13 June 2023

Gabriel Castelblanco, Jose Guevara and Alberto De Marco

Global crises have become increasingly recurrent events that jeopardize public-private partnerships (PPPs). In this context, the purpose of this paper is to expose the PPP-crisis…

1771

Abstract

Purpose

Global crises have become increasingly recurrent events that jeopardize public-private partnerships (PPPs). In this context, the purpose of this paper is to expose the PPP-crisis research agenda by combining bibliometric and network analyses.

Design/methodology/approach

The PPP literature associated with global crises between the 2008 global financial crisis and 2022 was analyzed in three stages: (1) paper selection and screening for the inclusion/exclusion of articles relevant to this research, (2) semantic network development for examining thematic relationships among selected papers by considering the co-occurrence of keywords within the chosen studies and (3) calculation of network metrics for analysis.

Findings

The paper identified six research avenues for the PPP-crisis agenda: public interest, relational governance, risk management, user-pay PPPs, crisis management and financial performance. The PPP-crisis literature has spread significantly in the last five years driven by the case study approaches on a national or regional basis. Conversely, non-crisis periods generate room to strengthen user-pay PPPs and relational governance. The pandemic and post-pandemic times shared the priorities of the 2008 financial crisis but also strengthened the management of the risks and the structural drivers of the global crisis.

Originality/value

This study demonstrates that during global crisis periods, the public interest and financial performance gain relevance in a detriment of structural solutions to social legitimacy erosion of PPPs because of the urgency of giving tools to the public and private sectors to tackle the financial issues, which steer future issues for PPPs.

Details

Built Environment Project and Asset Management, vol. 14 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 6 March 2023

Isaac Akomea-Frimpong, Xiaohua Jin, Robert Osei-Kyei and Fatemeh Pariafsai

Public–private partnership (PPP), a project financing arrangement between private investors and the public sector, has revolutionized the approach to the funding and development…

Abstract

Purpose

Public–private partnership (PPP), a project financing arrangement between private investors and the public sector, has revolutionized the approach to the funding and development of public infrastructure worldwide. However, the increasing cases of financial risks and poor financial risk management related to the model threaten the sustainability and financial success of PPP projects leading to huge financial investment losses. This study aims to review existing literature to establish the key measures to control the financial risks of sustainable PPP projects.

Design/methodology/approach

A PRISMA-compliant systematic literature review method was used in this study. Data were sourced from academic databases consisting of 56 impactful peer-reviewed journal articles.

Findings

The review outcomes demonstrate 41 critical factors (measures) in mitigating the financial risks of sustainable PPP projects. They include minimum revenue guarantee, strategic alliance with private investors, financial transparency and accountability and sound macroeconomic policies. The principal results of the study were categorized and conceptualized into a financial risk management maturity model for sustainable PPP projects. Lastly, the study reveals that further studies and project policies must focus more on addressing financial challenges relating to climate risks, and health and safety concerns such as COVID-19 outbreak that have negative impacts on PPP projects.

Research limitations/implications

The results provide essential research gaps and directions for future studies on measures to mitigate the financial risks of sustainable PPP projects. However, this study used small but significant existing publications.

Practical implications

A checklist and a conceptual maturity model are provided in this study to help practitioners to learn and improve upon their practices to mitigate the financial risks of sustainable PPP projects.

Originality/value

This study contributes to managerial measures to reduce huge losses in financial investments of PPP projects and the attainment of sustainability in public infrastructure projects with a financial risk maturity model.

Details

Journal of Financial Management of Property and Construction , vol. 28 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 7 April 2023

Pedro Bento, Sílvio Mariano, Pedro Carvalho, Maria do Rosário Calado and José Pombo

This study is a targeted review of some of the major changes in European regulation that guided energy policy decisions in the Iberian Peninsula and how they may have aggravated…

Abstract

Purpose

This study is a targeted review of some of the major changes in European regulation that guided energy policy decisions in the Iberian Peninsula and how they may have aggravated the problem of lack of flexibility. This study aims to assess some of the proposed short-term solutions to address this issue considering the underlying root causes and suggests a different course of action, that in turn, could help alleviate future market strains.

Design/methodology/approach

The evolution of the most important (macro) energy and price-related variables in both Portugal and Spain is assessed using market and grid operator data. In addition, the authors present critical viewpoints on some of the most recent EU and national regulation changes (official document analysis).

Findings

The Iberian energy policy and regulatory agenda has successfully promoted a rapid adoption of renewables (main goal), although with insufficient diversification of generation technologies. The compulsory closings of thermal plants and an increased tax (mainly carbon) added pressure toward more environmentally friendly thermal power plants. However, inevitably, this curbed the bidding price competitiveness of these producers in an already challenging market framework. Moving forward, decisions must be based on “a bigger picture” that does not neglect system flexibility and security of supply and understands the specificities of the Iberian market and its generation portfolio.

Originality/value

This work provides an original account of unprecedented spikes in energy prices in 2021, specifically in the Iberian electricity market. This acute situation worries consumers, industry and governments. Underlining the instability of the market prices, for the first time, this study discusses how some of the most important regulatory changes, and their perception and absorption by involved parties, contributed to the current environment. In addition, this study stresses that if flexibility is overlooked, the overall purpose of having an affordable and reliable system is at risk.