Search results

1 – 2 of 2
Article
Publication date: 27 February 2024

Xiongyong Zhou, Haiyan Lu and Sachin Kumar Mangla

Food sustainability is a world-acknowledged issue that requires urgent integrated solutions at multi-levels. This study aims to explore how food firms can improve their…

Abstract

Purpose

Food sustainability is a world-acknowledged issue that requires urgent integrated solutions at multi-levels. This study aims to explore how food firms can improve their sustainability performance through digital traceability practices, considering the mediating effect of sustainability-oriented innovation (SOI) and the moderating effect of supply chain learning (SCL) for the food supply chain therein.

Design/methodology/approach

Hierarchical regression with a moderated mediation model is used to test the proposed hypotheses with a sample of 359 food firms from four provinces in China.

Findings

Digital traceability has a significant positive impact on the three pillars of sustainability performances among food firms. SOI (product innovation, process innovation and organisational innovation) mediates the relationship between digital traceability and sustainability performance. SCL plays moderating roles in the linkage between digital traceability and both product and process innovation, respectively.

Originality/value

This paper contributes as one of the first studies to develop digital traceability practices and their sustainability-related improvements for Chinese food firms; it extends studies on supply chain traceability to a typical emerging market. This finding can support food sustainability practice in terms of where and how to invest in sustainability innovation and how to improve economic, environmental and social performance.

Details

Supply Chain Management: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1359-8546

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article