1 – 10 of 59Adriano Rehder, João Valsecchi Souza, Roberto Marx and Mario Sergio Salerno
Agile methods are increasingly being applied in the contexts of innovation beyond traditional information technology (IT) and physical product development projects, such as when…
Abstract
Purpose
Agile methods are increasingly being applied in the contexts of innovation beyond traditional information technology (IT) and physical product development projects, such as when process improvements are being implemented. Nevertheless, this phenomenon is still recent and little addressed in the literature, with few descriptions of empirical cases. This study aims to address this gap.
Design/methodology/approach
This multiple case study aims to present and discuss the application of Agile practices embedded in large companies’ innovation value chains, focusing on improvements of business processes. The following research question is pursued: How are large companies applying elements of Agile methods to their innovation processes when implementing incremental improvements in their operational processes? Based on the idea that the Agile-Stage-Gate model is an alternative to this challenge, this study investigates the application of this hybrid model in two large Brazilian companies by presenting their idiosyncrasies, lessons learned, adaptations, challenges and benefits.
Findings
Overall, it was observed that the experience with the application of the Agile-Stage-Gate model is positive for these companies, with better customer engagement, easier project control and increased productivity of the project team.
Originality/value
For those aiming to implement the Agile-Stage-Gate model, this paper identifies the main adaptations made in order to combine the purist approaches and critical success factors for its implementation.
Details
Keywords
The objective of this research is to explore integration and transition activities in large industrial projects. The purpose is to (a) obtain a better understanding of the…
Abstract
Purpose
The objective of this research is to explore integration and transition activities in large industrial projects. The purpose is to (a) obtain a better understanding of the integration and transition activities between the project front-end (FE) and project initiation phases (PIPs), (b) explore what, how and when these integrations and transitions occur, and (c) explore what the integration and transition activities mean to project practitioners.
Design/methodology/approach
A qualitative research design methodology is followed, based on interviews using open-ended questions. An expert panel is used to provide responses to questions pertaining to the integration and transition between the project FE and PIP. The research is focused on managing large projects in the South African electrical engineering industrial projects industry. A literature review combined with empirical analysis reflects the importance of integrating and transitioning in project business.
Findings
The findings provide guidance to researchers and practitioners on integration and transition mechanisms, how and when these occur. It highlights the benefits of integration and transition activities. Important lessons for researchers and practitioners are provided together with areas for future research.
Originality/value
This is an interpretative analysis of expert opinion. Expert panel members are experienced at senior decision-making level, and their expertise was accessed based on experience, education and knowledge. This extensive experience is shared in this paper providing insights into their opinions, experiences, success and failures. These inputs together with the literature review provide interesting implications for both a theoretical foundation as well as practical implications for practitioners.
Details
Keywords
Petteri Annunen, Juho Tella, Sini Pekki and Harri Haapasalo
This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the…
Abstract
Purpose
This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the elements for creating the maintenance capability and the process to be used in construction life cycle projects for buildings.
Design/methodology/approach
An inductive and qualitative research method was used to construct the proposed process based on the literature and 18 interviews in two large construction companies.
Findings
The results indicate that the maintenance phase is usually overlooked during the design and construction phases, and capabilities are not systematically built. In particular, processes are lacking in data management, causing severe problems in maintenance.
Originality/value
This study presents a process including key requirements and activities for creating maintenance capability in conjunction with the design and construction phases, which is novel to the literature. The validated process can be adapted based on the needs of the construction company.
Details
Keywords
Petteri Annunen, Erno Mustonen, Janne Harkonen and Harri Haapasalo
This study aims to focus on creating sales capability as part of new product development (NPD). The aim is to define generic requirements for building sales capability as a part…
Abstract
Purpose
This study aims to focus on creating sales capability as part of new product development (NPD). The aim is to define generic requirements for building sales capability as a part of NPD and to propose a necessary process by defining key activities for sales readiness.
Design/methodology/approach
An inductive and qualitative research method was used to construct a sales capability creation process based on a current state analysis in seven companies.
Findings
The results indicate that the status of companies’ sales-related planning varies during the NPD, and the related activities are not systematically managed. Considering sales early is necessary to enable a smooth and cost-efficient start of sales, and to avoid unnecessary delays and problems in other functions. At the same time, the companies recognise the need for improvement.
Originality/value
This paper presents a potential process including systematic activities for creating sales capability in conjunction with product development, which is novel to the literature. The proposed process is applicable in aligning industrial company needs.
Details
Keywords
Gro Holst Volden and Bjorn Andersen
The purpose of this paper is to study public project governance frameworks in various ministries and agencies in Norway, following the introduction of such a framework on the…
Abstract
Purpose
The purpose of this paper is to study public project governance frameworks in various ministries and agencies in Norway, following the introduction of such a framework on the topmost level (i.e. the cabinet) which applies to the very largest projects.
Design/methodology/approach
The study is methodologically designed as a qualitative assessment of project governance frameworks that apply to state-funded investment projects in selected sectors, based on data gathered through document reviews and interviews.
Findings
The study finds that all of the agencies have introduced their own project governance frameworks, which are basically consistent with the recommendations from the project management literature and with the cabinet’s overall requirements in Norway. By contrast, only one ministry has taken a formalized role as a project owner. Governance tasks thus seem to be extensively delegated to the subordinate agencies. This even includes strategic tasks such as project selection and portfolio management, and implies there is a risk that public project governance has a narrow and internal focus.
Originality/value
The paper is a first step toward a better understanding of public project governance as a hierarchical system and the relationship between project owners on three levels, the cabinet, the sectoral ministry, and the government agency.
Details
Keywords
David T. Rosell, Nicolette Lakemond and Lisa Melander
The purpose of this paper is to explore and characterize knowledge integration approaches for integrating external knowledge of suppliers into new product development projects.
Abstract
Purpose
The purpose of this paper is to explore and characterize knowledge integration approaches for integrating external knowledge of suppliers into new product development projects.
Design/methodology/approach
This paper is based on a multiple, in-depth case study of six product development projects at three knowledge-intensive manufacturing firms.
Findings
Firms make purposeful choices to devise knowledge integration approaches when working in collaborative buyer – supplier projects. The knowledge characteristics of the supplier input guide the choice of either coupling knowledge sharing and combining across firms or decoupling knowledge sharing (across firms) and knowledge combining (within firms).
Research limitations/implications
This study relies on a limited number of case studies and considers only one supplier relationship in each project. Further studies could examine the challenge of knowledge integration in buyer – supplier relationships in different contexts, i.e. in relation to innovation complexity and uncertainty.
Practical implications
Managers need to make choices when designing knowledge integration approaches in collaborative product development projects. The use of coupled and decoupled approaches can help balance requirements in terms of joint problem-solving across firms, the efficiency of knowledge integration and the risks of knowledge leakage.
Originality/value
The conceptualization of knowledge integration as knowledge sharing and knowledge combining extends existing perspectives on knowledge integration as either a transfer of knowledge or as revealing the presence of pertinent knowledge without entirely transmitting it. The findings point to the complexity of knowledge integration as a process influenced by knowledge characteristics, perspectives on knowledge, openness of firm boundaries and elements of knowledge sharing and combining.
Details
Keywords
Teemu Mikael Lappi, Kirsi Aaltonen and Jaakko Kujala
This paper aims to increase the current understanding of the connection between operational level information and communication technology (ICT) projects and national level…
Abstract
Purpose
This paper aims to increase the current understanding of the connection between operational level information and communication technology (ICT) projects and national level digital transformation by researching how project governance structures and practices are applied in an e-government context.
Design/methodology/approach
An elaborative qualitative study through public documentary analysis and empirical multi-case research on Finnish central government is used.
Findings
The study constructs a multi-level governance structure with three main functions and applies this in an empirical setting. The results also describe how different governance practices and processes, focusing on project portfolio management, are applied vertically across different organizational levels to connect the ICT projects with the national digitalization strategy.
Originality/value
This study integrates project governance and portfolio management knowledge into public sector digitalization, thus contributing to project management, e-government and ICT research streams by improving the current understanding on the governance of ICT projects as part of a larger-scale digitalization. This study also highlights perceived gaps between current governance practices and provides implications to managers and practitioners working in the field to address these gaps.
Details
Keywords
Younggeun Lee, Andres Felipe Cortes, Anthony Di Benedetto, Pol Herrmann, Mathew Hughes, Phillip H. Kim, Haemin Dennis Park and Sai Lan
Adebayo Agbejule and Lassi Lehtineva
The aim of the study is to explore how the different combinations of traditional and agile project management (APM) enhance project success under different levels of teamwork…
Abstract
Purpose
The aim of the study is to explore how the different combinations of traditional and agile project management (APM) enhance project success under different levels of teamwork quality.
Design/methodology/approach
The study used system approach, using cluster analysis, to examine the relationships between project success and traditional project management (TPM) and APM under different levels of teamwork quality. A cluster analysis approach provides a method to examine how the entire range of variables combine to improve project success.
Findings
The results of the study revealed three profiles of project managers’ differences in teamwork quality and type of project management used: pure agile, TPM leaning hybrid and APM (APM) leaning hybrid. The results found evidence that TPM leaning hybrid received the highest score in project success.
Practical implications
Organizations should develop teamwork skills to learn to use both TPM and APM so that specific risks presented by one approach use are compensated by the use of other. Finally, organizations should have good TPM practices before planning to implement agile practices.
Originality/value
The findings of this study suggest that TPM with high teamwork quality supported by APM can enhance project success. APM supported by TPM contributes to improved project success.
Details
Keywords
Abstract
Purpose
The purpose of this paper is to identify staff skills and competencies on which Chinese open universities should focus their professional development activities in order to enhance the quality of open and distance learning (ODL) in China.
Design/methodology/approach
Data were collected from surveys of 220 academic and academic-related Chinese staff, each of whom participated in one of seven 3-day Learning Design and Course Creation (LDCC) workshops at three large regional open universities in China between 2017 and 2019. The workshops were based on the UK Open University (UKOU) approach to learning design (LD) and course creation. Using content analysis methodology, textual responses were analysed and compared against the Instructional Design Competencies framework provided by the International Board of Standards for Training, Performance and Instruction (IBSTPI).
Findings
(1) Designing instructional interventions, (2) keeping up to date with design theories, (3) communicating in order to manage stakeholders, teams and projects were the main competencies identified from the participants responses. However, these three identified competencies differed in emphasis between the institutions that took part.
Originality/value
In Western higher education institutions (HEIs), LD has developed as an important approach to improving quality. A need has been identified for robust approaches to quality and professional development opportunities to enhance teaching and learning standards in open and distance learning (ODL) in China. This paper identifies and discusses specific LD skills and competencies that could be targeted to improve the quality of ODL in China.
Details