Taofeek Tunde Okanlawon, Luqman Oyekunle Oyewobi and Richard Ajayi Jimoh

The purpose of this study is to assess the barriers to the implementation of blockchain technology in construction supply chain management in Nigeria.

1193

Abstract

Purpose

The purpose of this study is to assess the barriers to the implementation of blockchain technology in construction supply chain management in Nigeria.

Design/methodology/approach

This study employed a quantitative research approach through a questionnaire survey that was conducted among professionals in the Nigerian construction industry using the snowball sampling method, which resulted in a selection of 155 respondents. The collected data were analysed using descriptive and exploratory factor analysis (EFA), while Cronbach's alpha was used to assess the reliability.

Findings

The analysis revealed that all barriers ranked above the average mean item score. It also revealed that all professionals have a convergent opinion on the barriers. EFA was used in clustering the identified barriers into two categories: technological and socio-political barrier.

Research limitations/implications

This research was carried out in the Southwestern region which is one of the six geo-political zones in Nigeria using a cross-sectional survey method.

Practical implications

The findings provide valuable insights into the barriers to the implementation of blockchain in supply chain management for professionals and practitioners in the Nigerian construction industry.

Originality/value

The research categorised the barriers into technological and social-political barrier and identified that lack of digitalisation is the major barrier to the implementation of blockchain technology in construction supply chain.

Details

Frontiers in Engineering and Built Environment, vol. 4 no. 1
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 6 June 2022

Paige M. Hulls, Frank de Vocht, Richard M. Martin and Rebecca M. Langford

Around 400,000 working days per year are lost in the construction industry due to stress, depression or anxiety, but a large proportion of the industry – those primarily not based…

2816

Abstract

Purpose

Around 400,000 working days per year are lost in the construction industry due to stress, depression or anxiety, but a large proportion of the industry – those primarily not based “on-site” – is not included in these statistics. Little research has been conducted in this group about their experiences of occupational stress. The authors explored how stress was experienced and managed by construction professionals and its perceived impact on health.

Design/methodology/approach

The authors interviewed 32 construction professionals in a British construction company, with varying levels of seniority and years in the industry. Interviews were transcribed, coded and analysed thematically.

Findings

Stress was viewed an inevitable and increasing part of the construction industry, exacerbated by recent economic challenges. Participants talked about a culture of stress and overwork but often felt unable to challenge it due to job insecurity. Senior management acknowledged stress was a problem within the industry and something that potentially threatened company productivity. Company-wide initiatives had been implemented to address stress levels (e.g. Mental Health First Aiders), but were criticised for ignoring underlying issues. Informal means of managing stress were identified, such as careful consideration of team dynamics, which allowed employees to form close bonds and using “banter” and camaraderie to relieve stress. However, the persistence of a macho male image meant some participants were reluctant to talk about their feelings at work. Participants described individual coping strategies, such as exercise, but these were hard to prioritise in challenging times.

Originality/value

There is growing recognition that health and well-being must be given greater priority in the construction industry. Industry pressures and competitive practices undermine efforts to improve staff well-being. Action must be taken at senior levels to address this conflict, while building on existing informal mechanisms of support and stress relief.

Details

International Journal of Workplace Health Management, vol. 15 no. 5
Type: Research Article
ISSN: 1753-8351

Keywords

Open Access
Article
Publication date: 13 July 2020

Felix Gradinger, Julian Elston, Sheena Asthana, Chloe Myers, Sue Wroe and Richard Byng

This integrated care study seeks to highlight how voluntary sector “wellbeing co-ordinators” co-located in a horizontally and vertically integrated, multidisciplinary community…

2388

Abstract

Purpose

This integrated care study seeks to highlight how voluntary sector “wellbeing co-ordinators” co-located in a horizontally and vertically integrated, multidisciplinary community hub within one locality of an Integrated Care Organisation contribute to complex, person-centred, co-ordinated care.

Design/methodology/approach

This is a naturalistic, mixed method and mixed data study. It is complementing a before-and-after study with a sub-group analysis of people receiving input from the wider hub (including Wellbeing Co-ordination and Enhanced Intermediate Care), qualitative case studies, interviews, and observations co-produced with embedded researchers-in-residence.

Findings

The cross-case analysis uses trajectories and outcome patterns across six client groups to illustrate the bio-psycho-social complexity of each group across the life course, corresponding with the range of inputs offered by the hub.

Research limitations/implications

To consider the effectiveness and mechanisms of complex system-wide interventions operating at horizontal and vertical interfaces and researching this applying co-produced, embedded, naturalistic and mixed methods approaches.

Practical implications

How a bio-psycho-social approach by a wellbeing co-ordinator can contribute to improved person reported outcomes from a range of preventive, rehabilitation, palliative care and bereavement services in the community.

Social implications

To combine knowledge about individuals held in the community to align the respective inputs, and expectations about outcomes while considering networked pathways based on functional status, above diagnostic pathways, and along a life-continuum.

Originality/value

The hub as a whole seems to (1) Enhance engagement through relationship, trust and activation, (2) Exchanging knowledge to co-create a shared bio-psycho-social understanding of each individual’s situation and goals, (3) Personalising care planning by utilising the range of available resources to ensure needs are met, and (4) Enhancing co-ordination and ongoing care through multi-disciplinary working between practitioners, across teams and sectors.

Details

Journal of Integrated Care, vol. 28 no. 4
Type: Research Article
ISSN: 1476-9018

Keywords

Access

Only content I have access to

Year

Content type

1 – 3 of 3