Search results

1 – 10 of over 7000
Content available
Book part
Publication date: 10 October 2017

Hans Mikkelsen and Jens O. Riis

Abstract

Details

Project Management
Type: Book
ISBN: 978-1-78714-830-7

Content available
Book part
Publication date: 10 October 2017

Hans Mikkelsen and Jens O. Riis

Abstract

Details

Project Management
Type: Book
ISBN: 978-1-78714-830-7

Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Content available
Book part
Publication date: 10 October 2017

Hans Mikkelsen and Jens O. Riis

Abstract

Details

Project Management
Type: Book
ISBN: 978-1-78714-830-7

Open Access
Article
Publication date: 29 August 2021

Bert de Groot, Wim Leendertse and Jos Arts

Learning across teams and organisational levels enables organisations to deal with challenges that arise from changing contexts. Project-oriented organisations increasingly use…

2430

Abstract

Purpose

Learning across teams and organisational levels enables organisations to deal with challenges that arise from changing contexts. Project-oriented organisations increasingly use programme management to cope with such challenges and improve performance. This paper aims to find out how different programme configurations affect learning across project teams and between project teams and their parent organisation in project-oriented organisations.

Design/methodology/approach

A case study of a project-oriented organisation involved in five infrastructure programmes was performed.

Findings

The studied programmes linked learning processes at group and organisational levels by creating relationships across project teams and their parent organisation and acting as a knowledge centre. Team learning benefits from the learning culture and stable environment that programmes create for project teams. This study indicates that a programme’s features and focus strongly determines whether a programme predominantly enhances learning across project teams or learning between project teams and their parent organisation.

Originality/value

Although programme management is increasingly used by project-oriented organisations, there are few studies relating to learning in programmes. This study provides new insights into learning across teams through programmes.

Details

The Learning Organization, vol. 29 no. 1
Type: Research Article
ISSN: 0969-6474

Keywords

Open Access
Article
Publication date: 4 August 2022

Christopher Amoah and Hlatshwayo Nkosazana

Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study…

5553

Abstract

Purpose

Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study sought to identify effective management strategies to mitigate construction contract issues that might emerge during construction.

Design/methodology/approach

A quantitative research approach was adopted for the study. Structured questionnaires made up of close-ended questions were distributed to construction professionals in South Africa via the SurveyMonkey platform. The data were then analysed using descriptive statistics.

Findings

The findings indicate that the critical sources of contract-related disputes are ambiguous definitions of the contract parties' scope of their rights and obligations, lack of precise arrangements regarding the calculation of contractual penalties for failure to meet the deadline, lack of detailed specification of the works and specific milestones, lack of provisions regulating changes to the project documentation during the construction stage, an excessive amount of contractual penalties on contractor's side and lack of provisions regarding the rules of performing additional and replacement works and their settlement. However, for these disputes to be effectively managed, strategies such as reduction uncertainties in project's phases, setting up contingency plans, construction guarantee, extension of time claims, payment guarantee, retention and escalation clause should be implemented by the parties involved.

Research limitations/implications

Even though the empirical study focused on construction professionals in South Africa, the findings could be applied to other countries outside of South Africa.

Practical implications

To effectively manage and prevent contract disputes from averting project failures and losses to parties involved in the contract, construction professionals need to be aware of strategies that must be implemented before and during the project execution. If well implemented, these strategies will help a construction project be successful and experience fewer contractual disputes.

Originality/value

The study has identified the knowledge gap concerning suitable contract risk management strategies available for implementation to effectively prevent any contract parties from losing money, time and project failure.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 21 May 2018

Saeed Akbari, Mostafa Khanzadi and Mohammad Reza Gholamian

To address requirements and specifications of construction project, academics need to build a project classification model. In recent years, project success concept, particularly…

2825

Abstract

Purpose

To address requirements and specifications of construction project, academics need to build a project classification model. In recent years, project success concept, particularly on large-scale construction projects, has been a controversial issue, especially in developing countries. Hence, in this paper, after introducing a sustainable success index (SSI), a novel method called “rough set approach” had been adopted to induce decision rules and to classify construction projects. The paper aims to discuss these issues.

Design/methodology/approach

At first, 20 effective success factors and 15 success criteria based on three pillars of sustainability of economy, society and environment had been categorized. The research data used for analysis had been collected from 26 large-scale construction projects in Iran and five other countries. After collecting data collection, observations had been analyzed and 51 decision rules were generated, and the projects were classified. Eventually, in order to evaluate the performance of the generated rules, confusion matrix was applied, and the model was validated.

Findings

The results of the present study show that rough set theory (RST) can be an effective and valuable tool for building expert systems. Practical applications of these results along with limitations and future research are described.

Originality/value

Perhaps for the first time, in the present study, a number of large-scale construction projects are classified based on SSI. Applying RST for building rule-based system and classifying projects in construction project area are novel attempts undertaken in this paper. The rules induced in this study can be applied to develop a sustainable success prediction model in the future studies.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 7 May 2024

Yazeed A. Alragabah and Mohd. Ahmed

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of…

Abstract

Purpose

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of this paper is to assess the impact of CSFs on the government construction projects in Saudi Arabia. The success factors are investigated from a broader consideration of failure criteria, from consideration of most effectiveness in successful project completion and also from consideration of the impact of implementing control processes for successful project completion.

Design/methodology/approach

This study has analysed the impact of success factors on construction projects in Saudi Arabia using a descriptive methodology. An exhaustive literature survey is undertaken to identify the success and failure factors related to government construction projects in Saudi Arabia. The survey data are sorted out and analysed by cost, schedule, technical, context and finance dimensions of the projects based on project types, engineering complexity, size, modality, jurisdictional control and funding approach. To evaluate the influence of success factors implementation, qualitative data were collected in a survey via a web-based questionnaire that was sent to officials working and occupying a responsible position in national project guidelines organizations and in government construction organizations in Saudi Arabia. In all, 28 CSFs were identified, ranked and evaluated for their impact on project success. The four identified factors belong to process categories of construction projects, nine factors belong to management of construction projects and 15 success factors are identified for impact assessment of implementation in construction projects.

Findings

The study's findings have identified and ranked the top five CSFs that significantly influence project outcomes, including meeting time targets, adhering to financial budgets, delivering desired outcomes for all stakeholders, effectively managing risks and assembling the appropriate team while optimizing resource allocation. Additionally, the research indicates that hindrances to projects primarily stem from execution, economic, human and political factors. The study advocates for strict controls over incomplete engineering designs and advises against contractors independently handling design work to ensure project success. Additionally, addressing contractors' qualifications and financial matters is crucial for project success. By highlighting these CSFs and challenges, the research provides actionable insights to enhance project management practices in the construction industry.

Research limitations/implications

This study is limited to the infrastructure projects constructed by governmental bodies with the participation of officials from government organizations. Further study, including private projects and officials working on private projects, may be needed to generalized the research outcome.

Originality/value

Numerous studies have investigated CSFs in construction projects, but few have examined their relevance to Saudi Arabian government projects. This study aims to fill this gap by identifying key CSFs specific to Saudi Arabian public sector construction projects and assessing their impact on project success. It advocates for stringent controls in the Saudi Arabian construction sector, emphasizing the importance of preventing incomplete or altered engineering designs by contractors to increase the success rate of public sector projects. This research offers practical insights to stakeholders, advancing project management practices in Saudi Arabia's construction sector for improved outcomes and resource utilization.

Details

Frontiers in Engineering and Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Book part
Publication date: 1 May 2019

John Connaughton and William Collinge

This paper aims to report on a new form of project insurance in the UK construction designed to improve collaborative working among project participants. It aims to examine the…

Abstract

Purpose

This paper aims to report on a new form of project insurance in the UK construction designed to improve collaborative working among project participants. It aims to examine the interprofessional collaborative endeavour under the new insurance arrangements, drawing on a structuration model of interdisciplinary collaboration developed in the field of healthcare studies.

Design/Methodology/Approach

The research employed a longitudinal, action research approach with participant observation. A novel element included a project facilitator as part of the action research team. Qualitative and quantitative data were collected using semi-structured interviews with close scrutiny of the documented project record.

Findings

Project structure emerges as a more important element in the collaboration process than is typically recognised in practice-based studies; the analysis revealing the interplay of structure, the socialising processes of participants and how facilitation helps develop interdependence among project participants. The analysis provides a basis for understanding collaboration on the trial project.

Research Limitations/Implications

The project provides a unique context for the examination of collaboration under the new project insurance arrangements. The results have implications for the study of collaboration in highlighting the important relationship between project structure, collaboration and facilitation.

Practical Implications

Understanding how interdependency is developed through structure, the socialising processes of collaborators and facilitation has important implications for those concerned with designing project arrangements and managing collaborative processes.

Originality/Value

The paper reports on the first full trial of new project insurance arrangements in the UK. It highlights the significance of project structure, and the interplay between collaborators’ emerging practices and facilitation.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 23 November 2021

Mara Soncin and Marta Cannistrà

This study aims to investigate the organisational structure to exploit data analytics in the educational sector. The paper proposes three different organisational configurations…

2567

Abstract

Purpose

This study aims to investigate the organisational structure to exploit data analytics in the educational sector. The paper proposes three different organisational configurations, which describe the connections among educational actors in a national system. The ultimate goal is to provide insights about alternative organisational settings for the adoption of data analytics in education.

Design/methodology/approach

The paper is based on a participant observation approach applied in the Italian educational system. The study is based on four research projects that involved teachers, school principals and governmental organisations over the period 2017–2020.

Findings

As a result, the centralised, the decentralised and the network-based configurations are presented and discussed according to three organisational dimensions of analysis (organisational layers, roles and data management). The network-based configuration suggests the presence of a network educational data scientist that may represent a concrete solution to foster more efficient and effective use of educational data analytics.

Originality/value

The value of this study relies on its systemic approach to educational data analytics from an organisational perspective, which unfolds the roles of schools and central administration. The analysis of the alternative organisational configuration allows moving a step forward towards a structured, effective and efficient system for the use of data in the educational sector.

Details

Qualitative Research in Accounting & Management, vol. 19 no. 3
Type: Research Article
ISSN: 1176-6093

Keywords

1 – 10 of over 7000