Search results

1 – 10 of 363
Article
Publication date: 3 September 2024

Yongming Wang, Jinlong Wang, Qi Zhou, Sai Feng and Xiaomin Wang

This study aims to address the issues of limited pipe diameter adaptability and low inspection efficiency of current pipeline inspection robots, a new type of pipeline inspection…

Abstract

Purpose

This study aims to address the issues of limited pipe diameter adaptability and low inspection efficiency of current pipeline inspection robots, a new type of pipeline inspection robot capable of adapting to various pipe diameters was designed.

Design/methodology/approach

The diameter-changing mechanism uses a multilink elastic telescopic structure consisting of telescopic rods, connecting rods and wheel frames, driven by a single motor with a helical drive scheme. A geometric model of the position relationships of the hinge points was established based on the two extreme positions of the diameter-changing mechanism.

Findings

A pipeline inspection robot was designed using a simple linkage agency, which significantly reduced the weight of the robot and enhanced its adaptive pipe diameter ability. The analysis determined that the robot could accommodate pipe diameters ranging from 332 mm to 438 mm. A static equilibrium equation was established for the robot in the hovering state, and the minimum pressing force of the wheels against the pipe wall was determined to be 36.68 N. After experimental testing, the robots could successfully pass a height of 15 mm, demonstrating the good obstacle capacity of the robot.

Practical implications

This paper explores and proposes a new type of multilink elastic telescopic variable diameter pipeline inspection robot, which has the characteristics of strong adaptability and flexible operation, which makes it more competitive in the field of pipeline inspection robots and has great potential market value.

Originality/value

The robot is characterized by the innovative design of a multilink elastic telescopic structure and the use of a single motor to drive the wheel for spiral motion. On the basis of reducing the weight of the robot, it has good pipeline adaptability, climbing ability and obstacle-crossing ability.

Details

Industrial Robot: the international journal of robotics research and application, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0143-991X

Keywords

Article
Publication date: 13 September 2023

Omid Alijani Mamaghani and Mohammad Zolfaghari

Gas transmission pipelines are at constant risk of gas leakage or fire due to various atmospheric environments, corrosion on pipe metal surfaces and other external factors. This…

Abstract

Purpose

Gas transmission pipelines are at constant risk of gas leakage or fire due to various atmospheric environments, corrosion on pipe metal surfaces and other external factors. This study aims to reduce the human and financial risks associated with gas transmission by regularly monitoring pipeline performance, controlling situations and preventing disasters.

Design/methodology/approach

Facility managers can monitor the status of gas transmission lines in real-time by integrating sensor information into a building information modeling (BIM) 3D model. Using the Monitoring Panel plugin, coded in C# programming language and operated through Navisworks software, the model provides up-to-date information on pipeline safety and performance.

Findings

By collecting project information on the BIM and installing critical sensors, this approach allows facility manager to observe the real-time safety status of gas pipelines. If any risks of gas leakage or accidents are identified by the sensors, the BIM model quickly shows the location of the incident, enabling facility managers to make the best decisions to reduce financial and life risks. This intelligent gas transmission pipeline approach changes traditional risk management and inspection methods, minimizing the risk of explosion and gas leakage in the environment.

Originality/value

This research distinguishes itself from related work by integrating sensor data into a BIM model for real-time monitoring and providing facility managers with up-to-date safety information. By leveraging intelligent gas transmission pipelines, the system enables quick identification and location of potential hazards, reducing financial and human risks associated with gas transmission.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 29 August 2024

Yizhuo Zhang, Yunfei Zhang, Huiling Yu and Shen Shi

The anomaly detection task for oil and gas pipelines based on acoustic signals faces issues such as background noise coverage, lack of effective features, and small sample sizes…

Abstract

Purpose

The anomaly detection task for oil and gas pipelines based on acoustic signals faces issues such as background noise coverage, lack of effective features, and small sample sizes, resulting in low fault identification accuracy and slow efficiency. The purpose of this paper is to study an accurate and efficient method of pipeline anomaly detection.

Design/methodology/approach

First, to address the impact of background noise on the accuracy of anomaly signals, the adaptive multi-threshold center frequency variational mode decomposition method(AMTCF-VMD) method is used to eliminate strong noise in pipeline signals. Secondly, to address the strong data dependency and loss of local features in the Swin Transformer network, a Hybrid Pyramid ConvNet network with an Agent Attention mechanism is proposed. This compensates for the limitations of CNN’s receptive field and enhances the Swin Transformer’s global contextual feature representation capabilities. Thirdly, to address the sparsity and imbalance of anomaly samples, the SpecAugment and Scaper methods are integrated to enhance the model’s generalization ability.

Findings

In the pipeline anomaly audio and environmental datasets such as ESC-50, the AMTCF-VMD method shows more significant denoising effects compared to wavelet packet decomposition and EMD methods. Additionally, the model achieved 98.7% accuracy on the preprocessed anomaly audio dataset and 99.0% on the ESC-50 dataset.

Originality/value

This paper innovatively proposes and combines the AMTCF-VMD preprocessing method with the Agent-SwinPyramidNet model, addressing noise interference and low accuracy issues in pipeline anomaly detection, and providing strong support for oil and gas pipeline anomaly recognition tasks in high-noise environments.

Details

International Journal of Intelligent Computing and Cybernetics, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1756-378X

Keywords

Article
Publication date: 5 April 2022

Zhimin Pan, Yu Yan, Yizhou Huang, Wei Jiang, Gao Cheng Ye and Hong Jun Li

The purpose of this paper is to achieve optimal climbing control of the gas-insulated switchgear (GIS) robot, as the authors know that the GIS inspection robot is a kind of…

Abstract

Purpose

The purpose of this paper is to achieve optimal climbing control of the gas-insulated switchgear (GIS) robot, as the authors know that the GIS inspection robot is a kind of artificial intelligent mobile equipment which auxiliary or even substitute human labor drive on the inner wall of the gas-insulated metal enclosed switchgear. The GIS equipment fault inspection and maintenance can be realized through the robot manipulator on the mobile platform and the camera carried on the fuselage, and it is a kind of intelligent equipment for operation. To realize the inspection and operation of the GIS equipment pipeline without blind spots, the robot is required to be able to travel on any wall inside the pipeline, especially the top of the pipeline and both right and left sides of the pipeline, which requires the flexible climbing of the GIS inspection robot. The robot device has a certain adsorption function to ensure that the robot is fully attached to the wall surface. At the same time, the robot manipulator can be used for collision-free obstacle avoidance operation planning in the narrow operation space inside the GIS equipment.

Design/methodology/approach

The above two technologies are the key that the robot completes the GIS equipment inspections. Based on this, this paper focuses on modeling and analysis of the chassis adsorption characteristics for the GIS inspection robot. At the same time, the Denavit Hartenberg (D-H) coordinate model of the robot arm system has been established, and the kinematics forward and inverse solutions of the robot manipulator system have been derived.

Findings

The reachable working space point cloud diagram of the robot manipulator in MATLAB has been obtained based on the kinematics analysis, and the operation trajectory planning of the robot manipulator using the robot toolbox has been obtained. The simulation results show that the robot manipulator system can realize the movement without collision and obstacle avoidance. The space can cover the entire GIS pipeline so as to achieve no blind area operation.

Originality/value

Finally, the GIS inspection robot physical prototype system has been developed through system integration design, and the inspection, maintenance operation experiment has been carried out in the actual GIS equipment. The entire robot system can complete the GIS equipment inspection operation soundly and improve the operation efficiency. The research in this paper has important theoretical significance and practical application value for the optimization design and practical research of the GIS inspection robot system.

Details

Industrial Robot: the international journal of robotics research and application, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0143-991X

Keywords

Open Access
Article
Publication date: 6 October 2023

Reijo Savolainen

To elaborate the picture of credibility assessment by examining how participants of online discussion evaluate the informational credibility of conspiracy theories.

Abstract

Purpose

To elaborate the picture of credibility assessment by examining how participants of online discussion evaluate the informational credibility of conspiracy theories.

Design/methodology/approach

Descriptive quantitative analysis and qualitative content analysis of 2,663 posts submitted to seven Reddit threads discussing a conspiracy operation, that is, the damage of the Nord Stream gas pipelines in September 2022. It was examined how the participants of online discussion assess the credibility of information constitutive of conspiracy theories speculating about (1) suspected actors responsible for the damage, (2) their motives and (3) the ways in which the damage was made. The credibility assessments focussed on diverse sources offering information about the above three factors.

Findings

The participants assessed the credibility of information by drawing on four main criteria: plausibility of arguments, honesty in argumentation, similarity to one's beliefs and provision of evidence. Most assessments were negative and indicated doubt about the informational believability of conspiracy theories about the damage. Of the information sources referred to in the discussion, the posts submitted by fellow participants, television programmes and statements provided by governmental organizations were judged most critically, due to implausible argumentation and advocacy of biased views.

Research limitations/implications

As the study focuses on a sample of posts dealing with conspiracy theories about a particular event, the findings cannot be generalized to concern the informational credibility conspiracy narratives.

Originality/value

The study pioneers by providing an in-depth analysis of the nature of credibility assessments by focussing on information constitutive of conspiracy theories.

Details

Aslib Journal of Information Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2050-3806

Keywords

Article
Publication date: 28 February 2023

Chaitali Brahma, Bhaskar Saha and Anirban Chowdhury

The purpose of this study is to understand the perception of the local weavers amongst the Bodos, a tribe of the North-east (NE) India. Towards this a concept of a service…

Abstract

Purpose

The purpose of this study is to understand the perception of the local weavers amongst the Bodos, a tribe of the North-east (NE) India. Towards this a concept of a service pipeline process in the field of heritage attire preservation of Bodo Dokhona was focused that would endorse the local weavers' community for its wellbeing and sustainability.

Design/methodology/approach

The design approaches have been framed after interactions with the local weavers through a survey conducted for understanding the issues pertaining to weavers. Towards sustaining the Bodo heritage attire Dokhona, a service design pipeline for better management system was developed in three phases. Interactions with the local weavers through survey and validation for its feasibility were undertaken.

Findings

This research paper focuses on publishing innovative survey research and practice related to cultural heritage management of the Bodo traditional wear Dokhona and sustainability conservation of the pipeline process. Therefore, developing both skill and knowledge for the weavers' community of the region.

Social implications

The design pipeline approach in this paper has been shared with the local weavers' for easy understanding of the step-by-step process of weaving a Dokhona made of eri silk. A progressive Bodo weaver will gain skill training which would lead to weavers' empowerment.

Originality/value

Developing and documenting an innovative service design approach. In this context, an insight for women empowerment leading to preservation of Bodo heritage is valued.

Details

Journal of Cultural Heritage Management and Sustainable Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-1266

Keywords

Article
Publication date: 6 August 2024

Xiaohui Dou, Yadong Li, Xinwei Zhang, Shengnan Wang, Yang Cheng, Wanpeng Yao, Dalei Zhang and Yan Li

The purpose of this study is to characterize the galvanic corrosion behavior of a simulated X80 pipeline steel welded joint (PSWJ) reconstructed by the wire beam electrode (WBE…

Abstract

Purpose

The purpose of this study is to characterize the galvanic corrosion behavior of a simulated X80 pipeline steel welded joint (PSWJ) reconstructed by the wire beam electrode (WBE) and numerical simulation methods.

Design/methodology/approach

The galvanic corrosion of an X80 PSWJ was studied using WBE and numerical simulation methods. The microstructures of the coarse-grained heat affected zone, fine-grained heat affected zone and intercritical heat affected zone were simulated in X80 pipeline steel via Gleeble thermomechanical simulation processing.

Findings

Comparing the corrosion current density of coupled and isolated weld metal (WM), base metal (BM) and heat-affected zone (HAZ), the coupled WM exhibited a higher corrosion current density than isolated WM; the coupled BM and HAZ exhibited lower corrosion current densities than isolated BM and HAZ. The results exhibited that the maximum anodic galvanic current fitted the Gumbel distribution. Moreover, the numerical simulation results agreed well with the experimental data.

Originality/value

This study provides insight into corrosion evaluation of heterogeneous welded joints by a combination of experiment and simulation. The method of reconstruction of the welded joint has been proven to be a feasible approach for studying the corrosion behavior of the X80 PSWJ with high spatial resolution.

Details

Anti-Corrosion Methods and Materials, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0003-5599

Keywords

Article
Publication date: 23 July 2024

Qing Bao, Baojin Wang, Manman Li, Chao Li and Jin Gao

A section of in-service PE gas pipeline in Guocun, Beijing, was found to appear gas leaking at the electrofusion (EF) joint. This study is dedicated to reveal the material cause…

Abstract

Purpose

A section of in-service PE gas pipeline in Guocun, Beijing, was found to appear gas leaking at the electrofusion (EF) joint. This study is dedicated to reveal the material cause of EF joint failure to help with a more accurate prediction of service life of PE gas pipe and further normalize the construction of PE gas pipeline.

Design/methodology/approach

Defect detection was carried out on the leaking EF joint using ultrasonic phased array. The mechanical degradation and structural aging behavior was studied by tension test, FTIR technology, TG test and DSC test. The organic components in the soil surrounding the PE gas pipe failure area were qualitatively identified.

Findings

The results showed that the organic surfactants in the soil environment could accelerate the aging behavior of PE material, leading to a deterioration of mechanical properties and a serious reduction in the ability of the PE pipe and EF joint, especially at the welding defect, to resist external force.

Originality/value

A novel study was conducted to investigate the failure cause of the EF joint of in-service PE gas pipe, incorporating the analysis of environmental factors and structural deterioration.

Details

Anti-Corrosion Methods and Materials, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0003-5599

Keywords

Article
Publication date: 29 December 2023

Taofeeq D. Moshood, James O.B. Rotimi and Shahzad Wajiha

The purpose of this study is to get a clearer knowledge of the reasons for, approaches to and challenges associated with integrating sustainable development concerns into pipeline…

Abstract

Purpose

The purpose of this study is to get a clearer knowledge of the reasons for, approaches to and challenges associated with integrating sustainable development concerns into pipeline construction projects in New Zealand. To achieve this, this study delves deeply into sustainable construction to understand the reasons behind and incorporate sustainable development trials into their newly established product management and development procedure. As a result, this study looks at identifying key elements of sustainable construction practices and various interpretations of sustainability in the construction industry; offering a strategy for incorporating sustainable construction practices into the pipeline construction project in New Zealand; and benefits and difficulties that the construction industry encounters when implementing sustainable construction. Finally, a framework is developed to help in understanding the issues and potential solutions for integrating sustainable building methods into the pipeline construction project in New Zealand.

Design/methodology/approach

This study followed a four-step method (Figure 1), beginning with the identification of the data, continuing with the first screening of the data, determining eligibility and, finally, including the data. This data collection is being done to provide knowledge and direction for further research. Data were collected from various websites on the Web of Science and from Scopus databases. Additionally, data were gathered with the assistance of aggregator databases such as Scopus (scopus.com) and publishing databases such as Elsevier (sciencedirect.com), Inderscience, Taylor and Francis (tandfonline.com), Emerald Insight (emeraldinsight.com) and Google Scholar. These databases have been considered by a number of scholars to be reputable databases.

Findings

This research provided a thorough description of the key justifications for sustainable construction. This study demonstrated how the idea worked in practice by reviewing the literature on the relevance and analysis of sustainability in construction. This body of research identified crucial components of sustainable construction techniques and varied interpretations of sustainability in the construction industry. To better grasp the current application considerations in the construction sector, it also offered literature on sustainable construction methods. To determine the most effective strategy to make certain adjustments to the current construction processes, the literature also includes a wide range of sustainability-related topics in both developed and developing country contexts. This study also demonstrated the many perspectives and strategies for sustainable behaviors. Because the purpose of this study was to develop a strategy for implementing sustainable construction in New Zealand, it was of the utmost importance to shed light on the most well-known and prominent sustainable construction applications from across the world. The output of this aim provided the literature on construction practices to acquire insight into the ongoing conversations on sustainable practices and systems in the construction industry. This was done to obtain insight into the existing talks.

Originality/value

This research's contribution to the body of knowledge is demonstrated by the fact that this study has led to a better understanding of sustainable construction practices in the construction industry as well as the identification of the most significant challenges that businesses, organizations, educators and policymakers must face to improve their ability to put these strategies into practice. This research has provided a solid foundation for future research that aims to advance knowledge in this field by providing options for future research to evaluate the influence that the approach has had on enhancing the implementation of sustainable construction. Additionally, this study presents options for future research to evaluate the influence the approach has had on improving the implementation of sustainable construction. The successful completion of the research aim in the more traditional forms of higher education in the built environment can contribute to a better representation of new trends in the practice area associated with expanding and improving the construction industry sustainably.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 9 August 2024

Heap-Yih Chong, Yufan Zhang, Cen Ying Lee, Fei Wang and Yubin Zhang

Audit trail cost management is crucial for ensuring accountability and enhancing quality assurance in construction management. Despite limited practical studies on audit trail…

Abstract

Purpose

Audit trail cost management is crucial for ensuring accountability and enhancing quality assurance in construction management. Despite limited practical studies on audit trail management from a cost perspective; this study developed a lifecycle-based audit trail cost management framework. It used synchronized Building Information Modeling (BIM) cost models and Bills of Quantities (BoQs) to address the existing gap.

Design/methodology/approach

This study employed a descriptive case study approach of a real-life hospital project in China. Data triangulation was achieved through interviews, observations, documents, and relevant artifacts.

Findings

The study identified three key factors contributing to cost variances between BIM cost models and BoQs: differences in measurement rules, model precision, and professional errors, particularly evident during the preliminary estimate stage. Notably, significant cost savings of approximately RMB 5.811 million were achieved during the detailed estimate stage. During the construction phase, a synchronized approach was deployed to improve precise payment verification and modifications to the BIM model. In the post-construction phase, the synchronized as-built BIM models and BoQs served as primary references to facilitate the resolution of operational discrepancies.

Practical implications

The research contributes to the literature by proposing a synchronized approach of BIM cost models and BoQs. This approach enhances traceability and accountability of project information, catering to the digitalization needs of the construction industry.

Originality/value

This study unveils a pragmatic approach to enhancing transparency and accountability in audit-trail cost management by synchronizing BIM cost models and BoQs at various project stages. The synchronized approach offers a promising direction for future research and implementation of audit trail frameworks to enhance cost management in construction.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 363