Search results

1 – 10 of 111
Article
Publication date: 21 December 2023

Lobone Lloyd Kasale, Moses Shanako Moruisi and Elsie Gaolatlhe Motswakhumo

This research investigates the roles that resources, organisational structure and climate play in the performance management of National Sport Organisations (NSOs).

Abstract

Purpose

This research investigates the roles that resources, organisational structure and climate play in the performance management of National Sport Organisations (NSOs).

Design/methodology/approach

This qualitative study draws data from 31 interviews, five focus groups conducted amongst Botswana National Sport Organisations. To corroborate the data collected, documents from these sport organisations were content analysed.

Findings

The amount and type of resources available, the degree to which decision-making is centralised, practices formalised and roles specialised affects how NSOs implement performance management. NSOs were not implementing performance management systems and could not tell whether they were creating favourable environments to implement the practices.

Practical implications

Sport managers, policymakers and educators can use insights from this study to improve their practices. This study also proposes avenues for further research.

Originality/value

This study contributes to sport management literature on performance management, and it is original because such as study has not been conducted before.

Details

Sport, Business and Management: An International Journal, vol. 14 no. 3
Type: Research Article
ISSN: 2042-678X

Keywords

Article
Publication date: 16 April 2024

Heather Keathley-Herring, Eileen Van Aken and Geert Letens

This study assesses performance measurement (PM) system implementation efforts across various organizational contexts and investigates which factors are critical to achieving…

Abstract

Purpose

This study assesses performance measurement (PM) system implementation efforts across various organizational contexts and investigates which factors are critical to achieving implementation success (IS).

Design/methodology/approach

An empirical field study was conducted to refine a framework of PM system IS that consists of 5 dimensions of success and 29 factors. A survey questionnaire was used to investigate actual organizational practice and exploratory factor analysis was conducted to refine constructs corresponding to potential factors and dimensions of IS. The resulting variables were then investigated using multiple regression analysis to identify critical success factors for implementing PM systems.

Findings

The survey was completed by representatives from 124 organizations and the exploratory factor analysis results indicated that there are three underlying dimensions of IS (i.e. Use of the System, PM System Performance, and Improved Results and Processes) and 12 factors. Of the factors, nine can be considered critical success factors having a significant relationship with at least one dimension of IS: Leader Support, Design and Implementation Approach, Reward System Alignment, Organizational Acceptance, Organizational Culture and Climate, Easy to Define Environment, IT Infrastructure Capabilities, PM System Design Quality, and PM Participation and Training.

Originality/value

The results show that there are distinct dimensions of IS and, although some factors are associated with all dimensions, most are more closely related to only one dimension. This suggests that different strategies should be utilized based on the types of challenges experienced during implementation.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 24 April 2024

Mahmoud Mawed

Amidst the complicated nature of the UAE’s facilities management (FM) industry, the need to recalibrate the existing performance measurement (PM) system measures and criteria has…

Abstract

Purpose

Amidst the complicated nature of the UAE’s facilities management (FM) industry, the need to recalibrate the existing performance measurement (PM) system measures and criteria has been resonating to ensure their ability to capture the FM industry trends and dynamics, thus enhancing organizational excellence. Therefore, this research aimed to propose a specific PM tool to the country’s FM industry to accurately assess performance and establish strategic enhancements.

Design/methodology/approach

The study reviewed literature on the available PM systems to gather the available measures, which were presented to a focus group of seven participants, who were purposively selected based on their expertise in FM and PM implementation in the UAE to adjust them and add ones relevant to the UAE’s FM industry.

Findings

The focus group conducted various changes, from retaining certain measures and criteria, renaming them to simplify or make them more representative of the industry, ranking them based on their importance to limit their numbers, to finally categorizing them as enablers or results. Consequently, the final proposed tool was composed of nine dimensions with 51 measures as performance enablers and three dimensions with 11 measures as performance results. Seven measures were added by the experts, who highlighted their increasing popularity in the UAE’s FM industry.

Originality/value

Through addressing the critical void in literature, this paper develops a specific PM tool aligning with the intricacy of the UAE’s FM industry, thus providing proactive contribution to the industry’s effective and sustainable growth.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 1 August 2023

Jacob Guerrero and Susanne Engström

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving…

Abstract

Purpose

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving innovation in the transport infrastructure sector.

Design/methodology/approach

Addressing a large public client in Sweden, a case study design was initially applied to provide in-depth insights and perspectives of client project managers’ views and experiences of managing projects expected to drive innovation. In this paper, the concepts of “hard” and “soft” are used to discuss empirical findings on challenges associated with adopting a PM-approach for driving innovation in projects. The empirical material consists of interview data, complemented with observations and archival data.

Findings

Findings reveal challenges associated with combining hard and soft approaches, frequently demonstrating difficulties in balancing short-term project expectations with the promotion of innovation. In line with the literature, project managers note that there is a need for soft approaches to promote development and drive innovation. Yet, findings reflect a situation in which operational success criteria predominate, whereas soft approaches are not sufficiently used to create the grounds required for fostering innovation.

Originality/value

Insights are provided into how PM-approaches may impact construction innovation in the infrastructure sector, demonstrating a need for further research on the challenges and implications of applying and combining hard and soft PM-approaches.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 3 October 2023

Renan Ribeiro Do Prado, Pedro Antonio Boareto, Joceir Chaves and Eduardo Alves Portela Santos

The aim of this paper is to explore the possibility of using the Define-Measure-Analyze-Improve-Control (DMAIC) cycle, process mining (PM) and multi-criteria decision methods in…

Abstract

Purpose

The aim of this paper is to explore the possibility of using the Define-Measure-Analyze-Improve-Control (DMAIC) cycle, process mining (PM) and multi-criteria decision methods in an integrated way so that these three elements combined result in a methodology called the Agile DMAIC cycle, which brings more agility and reliability in the execution of the Six Sigma process.

Design/methodology/approach

The approach taken by the authors in this study was to analyze the studies arising from this union of concepts and to focus on using PM tools where appropriate to accelerate the DMAIC cycle by improving the first two steps, and to test using the AHP as a decision-making process, to bring more excellent reliability in the definition of indicators.

Findings

It was indicated that there was a gain with acquiring indicators and process maps generated by PM. And through the AHP, there was a greater accuracy in determining the importance of the indicators.

Practical implications

Through the results and findings of this study, more organizations can understand the potential of integrating Six Sigma and PM. It was just developed for the first two steps of the DMAIC cycle, and it is also a replicable method for any Six Sigma project where data acquisition through mining is possible.

Originality/value

The authors develop a fully applicable and understandable methodology which can be replicated in other settings and expanded in future research.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 1 June 2023

Carlos Botelho

This paper aims to analyze the synergistic influence of performance appraisal (PA) practices and performance-driven culture (PDC) on the effectiveness of the performance…

Abstract

Purpose

This paper aims to analyze the synergistic influence of performance appraisal (PA) practices and performance-driven culture (PDC) on the effectiveness of the performance management (PM) system, which is measured by employees' reactions, namely satisfaction and perceived utility. It also analyzes the type of relationship between PA practices and PA satisfaction, specifically whether it is additive or modeled as a latent factor.

Design/methodology/approach

This is a cross-sectional study. Data were collected from 513 managers and employees working in 135 public and private organizations. The research model and hypotheses were tested using structured equation modeling.

Findings

The results support the positive impact of a set of four PA best practices on PA satisfaction. It shows that PDC is an enabler for the effective deployment of PA practices. It also demonstrates that the perceived utility of the PM system plays a role as a mediator in the relationship between PA practices and PA satisfaction.

Research limitations/implications

Data were collected using a questionnaire at a single point in time, and thus, cause-and-effect inferences were not possible.

Practical implications

The results provide guidance to organizations that are interested in designing and implementing PM systems and PA practices that contribute toward enhancing employees' managing performance experiences.

Originality/value

This study advances our understanding of the mechanisms by which organizational culture and PA practices influence the effectiveness of the PM system. It suggests that organizations, to benefit the most from a set of PA best practices, need to have a PDC.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 4
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 14 December 2022

Bryan Pieterse, Kofi Agyekum, Patrick Manu, Saeed Reza Mohandes, Clara Cheung and Akilu Yunusa-Kaltungo

Major maintenance projects are often regarded as maintenance activities regardless of the projects' complexity and scale. Consequently, very scarce research attention has hitherto…

Abstract

Purpose

Major maintenance projects are often regarded as maintenance activities regardless of the projects' complexity and scale. Consequently, very scarce research attention has hitherto been paid to the critical skills required when undertaking these projects. More specifically, the body of relevant knowledge is deprived of a study focusing on maintenance projects within the energy sector. In view of this shortcoming, this research aims to examine the critical project management (PM) skills required to deliver major maintenance projects within the energy sector.

Design/methodology/approach

Based on a quantitative research strategy, this study addressed the knowledge gap through a cross-sectional survey of professionals involved in the delivery of major maintenance projects in the United Kingdom's (UK) energy sector. Data obtained were analyzed via descriptive (e.g. frequencies, mean and standard deviation [SD]) and inferential statistical analyses (One sample t-test and exploratory factor analysis (EFA)).

Findings

Out of the 45 PM skills identified in the literature and examined by the respondents, the results obtained from the One sample t-test (based on p (1-tailed) = 0.05) showed that 37 were considered to be at least “important,” accounting for 80.4% of all the skills identified. EFA revealed a clustering of the PM skills items into seven components: “skills related to work scheduling and coordination”; “communication, risk, safety and stakeholder management skills”; “quality assurance skills”; “people management skills”; “skills related to forecasting scope and duration of outage”; “implementation of processes and time management skills” and “technical/engineering skills and experience pertaining to the outage and local site knowledge.”

Originality/value

This study has identified and contributed to the limited state-of-the-art skills project managers must possess to manage major maintenance projects in the energy sector successfully. The findings would be useful to organizations within the energy sector in ensuring that the organizations have suitable personnel in place to deliver major maintenance projects on the organizations' assets.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 May 2024

Uttara Jangbahadur, Sakshi Ahlawat, Prinkle Rozera and Neha Gupta

This paper examines and empirically validates the artificial intelligence-enabled human resource management (AI-enabled HRM) dimensions and sustainable organisational performance…

Abstract

Purpose

This paper examines and empirically validates the artificial intelligence-enabled human resource management (AI-enabled HRM) dimensions and sustainable organisational performance (SOP) relationship. It also examines the mediation and moderation of employee engagement (EE) and fusion skills (FS).

Design/methodology/approach

The indirect effects of AI-enabled HRM dimensions on SOP were found using structural equation modelling (SEM), bootstrapping and FS’s moderation effect by AMOS 22.

Findings

Results showed that AI-enabled HRM dimensions indirectly affected SOP through EE as a full and partial mediator with no moderation effects of FS.

Originality/value

This is the first study to link AI-enabled HRM dimensions, EE and SOP and determine how FS moderates EE and SOP.

Details

Evidence-based HRM: a Global Forum for Empirical Scholarship, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2049-3983

Keywords

Article
Publication date: 30 May 2023

Natalia Aversano, Diana Ferullo, Giuseppe Nicolò and Nadia Ardito

The present research aims to understand the performance disclosure levels provided by Italian healthcare organisations (HCOs). The authors conducted this study to assess the…

Abstract

Purpose

The present research aims to understand the performance disclosure levels provided by Italian healthcare organisations (HCOs). The authors conducted this study to assess the transparency of HCOs' performance reporting processes by examining the amount and the type of information disclosed in Annual Performance Reports (APRs).

Design/methodology/approach

The present study uses a qualitative research methodology based on manual content analysis. The APRs of a sample of 171 Italian public HCOs were analysed.

Findings

Results evidence that the APRs provide a sufficient level of disclosure of performance information, putting high attention on the epidemiological conditions; however, the APRs do not present a strong information function for stakeholders' decision-making purposes. The Italian HCOs APRs are not easily understandable because the APRs are not very concise and present information mainly in discursive terms with limited graphic support.

Originality/value

To the best of the authors' knowledge, this is the first research investigating both the extent and type of performance information reported by Italian HCOs in the APRs, considering the particular contextual conditions caused by the most significant challenge the healthcare (HC) sector has faced in recent years: the epidemiological crisis of the coronavirus disease 2019 (COVID-19). The study also explores whether APRs are currently used by HCOs as a merely regulatory requirement or as an information tool for accountability and decision-making purposes.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 4
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 14 September 2022

Petra Pekkanen and Timo Pirttilä

The aim of this study is to empirically explore and analyze the concrete tasks of output measurement and the inherent challenges related to these tasks in a traditional and…

Abstract

Purpose

The aim of this study is to empirically explore and analyze the concrete tasks of output measurement and the inherent challenges related to these tasks in a traditional and autonomous professional public work setting – the judicial system.

Design/methodology/approach

The analysis of the tasks is based on a categorization of general performance measurement motives (control-motivate-learn) and main stakeholder levels (society-organization-professionals). The analysis is exploratory and conducted as an empirical content analysis on materials and reports produced in two performance improvement projects conducted in European justice organizations.

Findings

The identified main tasks in the different categories are related to managing resources, controlling performance deviations, and encouraging improvement and development of performance. Based on the results, key improvement areas connected to output measurement in professional public organizations are connected to the improvement of objectivity and fairness in budgeting and work allocation practices, improvement of output measures' versatility and informativeness to highlight motivational and learning purposes, improvement of professional self-management in setting output targets and producing outputs, as well as improvement of organizational learning from the output measurement.

Practical implications

The paper presents empirically founded practical examples of challenges and improvement opportunities related to the tasks of output measurement in professional public organization.

Originality/value

This paper fulfils an identified need to study how general performance management motives realize as concrete tasks of output measurement in justice organizations.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 11
Type: Research Article
ISSN: 1741-0401

Keywords

1 – 10 of 111