Search results

1 – 5 of 5
Article
Publication date: 22 August 2024

Binghai Zhou and Mingda Wen

Owing to the finite nature of the boundary of the line (BOL), the conventional method, involving the strong matching of single-variety parts with storage locations at the…

Abstract

Purpose

Owing to the finite nature of the boundary of the line (BOL), the conventional method, involving the strong matching of single-variety parts with storage locations at the periphery of the line, proves insufficient for mixed-model assembly lines (MMAL). Consequently, this paper aims to introduce a material distribution scheduling problem considering the shared storage area (MDSPSSA). To address the inherent trade-off requirement of achieving both just-in-time efficiency and energy savings, a mathematical model is developed with the bi-objectives of minimizing line-side inventory and energy consumption.

Design/methodology/approach

A nondominated and multipopulation multiobjective grasshopper optimization algorithm (NM-MOGOA) is proposed to address the medium-to-large-scale problem associated with MDSPSSA. This algorithm combines elements from the grasshopper optimization algorithm and the nondominated sorting genetic algorithm-II. The multipopulation and coevolutionary strategy, chaotic mapping and two further optimization operators are used to enhance the overall solution quality.

Findings

Finally, the algorithm performance is evaluated by comparing NM-MOGOA with multi-objective grey wolf optimizer, multiobjective equilibrium optimizer and multi-objective atomic orbital search. The experimental findings substantiate the efficacy of NM-MOGOA, demonstrating its promise as a robust solution when confronted with the challenges posed by the MDSPSSA in MMALs.

Originality/value

The material distribution system devised in this paper takes into account the establishment of shared material storage areas between adjacent workstations. It permits the undifferentiated storage of various part types in fixed BOL areas. Concurrently, the innovative NM-MOGOA algorithm serves as the core of the system, supporting the formulation of scheduling plans.

Article
Publication date: 19 September 2024

Mohammad Azim Eirgash and Vedat Toğan

Most of the existing time-cost-quality-environmental impact trade-off (TCQET) analysis models have focused on solving a simple project representation without taking typical…

Abstract

Purpose

Most of the existing time-cost-quality-environmental impact trade-off (TCQET) analysis models have focused on solving a simple project representation without taking typical activity and project characteristics into account. This study aims to present a novel approach called the “hybrid opposition learning-based Aquila Optimizer” (HOLAO) for optimizing TCQET decisions in generalized construction projects.

Design/methodology/approach

In this paper, a HOLAO algorithm is designed, incorporating the quasi-opposition-based learning (QOBL) and quasi-reflection-based learning (QRBL) strategies in the initial population and generation jumping phases, respectively. The crowded distance rank (CDR) mechanism is utilized to rank the optimal Pareto-front solutions to assist decision-makers (DMs) in achieving a single compromise solution.

Findings

The efficacy of the proposed methodology is evaluated by examining TCQET problems, involving 69 and 290 activities, respectively. Results indicate that the HOLAO provides competitive solutions for TCQET problems in construction projects. It is observed that the algorithm surpasses multiple objective social group optimization (MOSGO), plain Aquila Optimization (AO), QRBL and QOBL algorithms in terms of both number of function evaluations (NFE) and hypervolume (HV) indicator.

Originality/value

This paper introduces a novel concept called hybrid opposition-based learning (HOL), which incorporates two opposition strategies: QOBL as an explorative opposition and QRBL as an exploitative opposition. Achieving an effective balance between exploration and exploitation is crucial for the success of any algorithm. To this end, QOBL and QRBL are developed to ensure a proper equilibrium between the exploration and exploitation phases of the basic AO algorithm. The third contribution is to provide TCQET resource utilizations (construction plans) to evaluate the impact of these resources on the construction project performance.

Details

Engineering Computations, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 17 September 2024

Mohammad Yaghtin and Youness Javid

The purpose of this research is to address the complex multiobjective unrelated parallel machine scheduling problem with real-world constraints, including sequence-dependent setup…

Abstract

Purpose

The purpose of this research is to address the complex multiobjective unrelated parallel machine scheduling problem with real-world constraints, including sequence-dependent setup times and periodic machine maintenance. The primary goal is to minimize total tardiness, earliness and total completion times simultaneously. This study aims to provide effective solution methods, including a Mixed-Integer Programming (MIP) model, an Epsilon-constraint method and the Nondominated Sorting Genetic Algorithm (NSGA-II), to offer valuable insights into solving large-sized instances of this challenging problem.

Design/methodology/approach

This study addresses a multiobjective unrelated parallel machine scheduling problem with sequence-dependent setup times and periodic machine maintenance activities. An MIP model is introduced to formulate the problem, and an Epsilon-constraint method is applied for a solution. To handle the NP-hard nature of the problem for larger instances, an NSGA-II is developed. The research involves the creation of 45 problem instances for computational experiments, which evaluate the performance of the algorithms in terms of proposed measures.

Findings

The research findings demonstrate the effectiveness of the proposed solution approaches for the multiobjective unrelated parallel machine scheduling problem. Computational experiments on 45 generated problem instances reveal that the NSGA-II algorithm outperforms the Epsilon-constraint method, particularly for larger instances. The algorithms successfully minimize total tardiness, earliness and total completion times, showcasing their practical applicability and efficiency in handling real-world scheduling scenarios.

Originality/value

This study contributes original value by addressing a complex multiobjective unrelated parallel machine scheduling problem with real-world constraints, including sequence-dependent setup times and periodic machine maintenance activities. The introduction of an MIP model, the application of the Epsilon-constraint method and the development of the NSGA-II algorithm offer innovative approaches to solving this NP-hard problem. The research provides valuable insights into efficient scheduling methods applicable in various industries, enhancing decision-making processes and operational efficiency.

Details

Journal of Modelling in Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1746-5664

Keywords

Article
Publication date: 13 September 2024

Qiuhan Wang and Xujin Pu

This research proposes a novel risk assessment model to elucidate the risk propagation process of industrial safety accidents triggered by natural disasters (Natech), identifies…

Abstract

Purpose

This research proposes a novel risk assessment model to elucidate the risk propagation process of industrial safety accidents triggered by natural disasters (Natech), identifies key factors influencing urban carrying capacity and mitigates uncertainties and subjectivity due to data scarcity in Natech risk assessment.

Design/methodology/approach

Utilizing disaster chain theory and Bayesian network (BN), we describe the cascading effects of Natechs, identifying critical nodes of urban system failure. Then we propose an urban carrying capacity assessment method using the coefficient of variation and cloud BN, constructing an indicator system for infrastructure, population and environmental carrying capacity. The model determines interval values of assessment indicators and weights missing data nodes using the coefficient of variation and the cloud model. A case study using data from the Pearl River Delta region validates the model.

Findings

(1) Urban development in the Pearl River Delta relies heavily on population carrying capacity. (2) The region’s social development model struggles to cope with rapid industrial growth. (3) There is a significant disparity in carrying capacity among cities, with some trends contrary to urban development. (4) The Cloud BN outperforms the classical Takagi-Sugeno (T-S) gate fuzzy method in describing real-world fuzzy and random situations.

Originality/value

The present research proposes a novel framework for evaluating the urban carrying capacity of industrial areas in the face of Natechs. By developing a BN risk assessment model that integrates cloud models, the research addresses the issue of scarce objective data and reduces the subjectivity inherent in previous studies that heavily relied on expert opinions. The results demonstrate that the proposed method outperforms the classical fuzzy BNs.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 12 September 2024

Qing Liu, Chengjun Wang, Chenchen Shang and Jiabao Li

The purpose of this study is to reduce the residual stress in welded workpieces, optimize the vibratory stress relief treatment process through the use of a vibration generator…

Abstract

Purpose

The purpose of this study is to reduce the residual stress in welded workpieces, optimize the vibratory stress relief treatment process through the use of a vibration generator and enhance the durability and longevity of the workpiece by developing a vibratory stress relief robot that incorporates a multi-manipulator system.

Design/methodology/approach

The multi-manipulator combination work is designed so that each manipulator is deployed according to the requirements of vibration stress relief work. Each manipulator works independently and coordinates with others to achieve multi-dimensional vibratory stress relief of the workpiece. A two-degree-of-freedom mobile platform is designed to enable the transverse and longitudinal movement of the manipulator, expanding the working space of the robot. A small electromagnetic superharmonic vibration generator is designed to produce directional vibrations in any orientation. This design addresses the technical challenge of traditional vibration generators being bulky and unable to achieve directional vibrations.

Findings

The residual stress relief experiment demonstrates that the residual stress of the workpiece is reduced by approximately 73% through three-degree-of-freedom vibration. The multi-dimensional vibration effectively enhances the relief effect of residual stress, which is beneficial for improving the strength and service life of the workpiece.

Originality/value

A new multi-manipulator robot is proposed to alleviate the residual stress generated by workpiece welding by integrating vibratory stress relief with robotics. It is beneficial to reduce material and energy consumption while enhancing the strength and service life of the workpiece.

Details

Industrial Robot: the international journal of robotics research and application, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0143-991X

Keywords

1 – 5 of 5