Search results

1 – 2 of 2
Article
Publication date: 9 July 2018

Felipe Alberto Bastos Siaudzionis Filho, Heráclito Lopes Jaguaribe Pontes, Marcos Ronaldo Albertin, Raphael Luiz Maia de Lima and Thais de Castro Moraes

The management of materials consists of an important analysis for industries as there are factors in several areas that should be considered. For this, it should take into account…

Abstract

Purpose

The management of materials consists of an important analysis for industries as there are factors in several areas that should be considered. For this, it should take into account logistical factors, quality and production, because one piece delivered in a large lead time or outside the technical quality standards, imply delays in the project or rework. In this context, the importance of creating a control method of input and output of tools in an aviation industry in the city of Toulouse, France, was seen due to the amount of many incomplete arrivals or inappropriate material for use. The paper aims to discuss this issue.

Design/methodology/approach

This study used a philosophy of lean manufacturing tools and visual management (VM). A VM panel with information documents of all tools used in an assembly station of a model airplane was applied. With all data collected to carry out the project, the panel was created with the most relevant information of each tool and applied to an assembly station. That done, the production supervisors, mechanical and electrical supervisors were trained in the operation. Despite a change of management, it was realized that all supported the change due to the ease of understanding of the method and a good VM.

Findings

At the end of the work, materials management became more simplified, operators were more satisfied because of the non-occurrence of tools mistakes and the control time decreased from 120 to 15 minutes.

Research limitations/implications

The application of this project has begun in an assembly station; however, it has been validated to be applied throughout the facility and its applications are being studied for other industries with different models.

Practical implications

This project developed a visual panel for support visual communication of the airplane assembly line. Its usage eliminates tools lost, inefficiencies and decreases lost time with tools selection.

Originality/value

This work proposes a way to simplify the management tools for assembly station plane using a VM panel based on the lean philosophy. The study was conducted at the Final Assembly Line of an aircraft model from a unit of an aircraft company.

Details

International Journal of Productivity and Performance Management, vol. 67 no. 6
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 6 July 2015

Marcos Ronaldo Albertin, Heraclito Lopes Jaguaribe Pontes, Enio Rabelo Frota and Matheus Barros Assunção

The purpose of this paper is to describe and propose a new way to do benchmarking. It describes an explanatory case study whereby data are collected through an internet…

1175

Abstract

Purpose

The purpose of this paper is to describe and propose a new way to do benchmarking. It describes an explanatory case study whereby data are collected through an internet benchmarking system with multi-criteria performance.

Design/methodology/approach

The research methodology was to conduct a literature review on international journals about evolution, typology and trends of benchmarking. Through a third year case study of Internet Benchmarking and Monitoring System of Productive Arrangements System the authors describe and propose a flexible benchmarking model.

Findings

The paper provides empirical insights about a new model of flexible benchmarking taking into account different demands, whereby partners’ data are collected and processed according to their needs.

Research limitations/implications

For monitoring and trending analysis more data and time is needed. These three-year applications show that it takes a long time to build a database that can be meaningful for benchmarking and monitoring purposes management. It also requires management maturity, performance system and finally procedures to invite companies to collect and input online data.

Practical implications

The paper describes a flexible benchmarking, detailing its features in the form of a case study. The gap analysis shows the individual and collective gaps and requirements. Examples of practical use and reports generated “online” are presented.

Originality/value

The paper presents a new potential for the use of benchmarking tools. It is expected to contribute to the academic area, describing ways to achieve greater potential in the use of benchmarking tools, proposing a new way to do benchmarking.

Details

Benchmarking: An International Journal, vol. 22 no. 5
Type: Research Article
ISSN: 1463-5771

Keywords

1 – 2 of 2