Search results

1 – 1 of 1
Article
Publication date: 11 August 2023

Kyung-Tae Lee, Jin-Bin Im, Sang-Jun Park and Ju-Hyung Kim

Though daycare centres are built to facilitate children's social and physical growth, divergent stakeholder perceptions yield conflicts while managing risks for each space due to…

159

Abstract

Purpose

Though daycare centres are built to facilitate children's social and physical growth, divergent stakeholder perceptions yield conflicts while managing risks for each space due to the minimal guidelines in the Republic of Korea. Due to the unclearly defined knowledge and experience gap between representative stakeholders, teachers have difficulties in operating it with high satisfaction. This study therefore was conducted to systematically identify which parts of performance should be increased to preferentially increase end-user satisfaction in limited resources.

Design/methodology/approach

This research conducted quantitative analysis gradually. Importance–performance analysis (IPA) grasped the perceptions of construction practitioners and end-users after identifying space composition and representative risks of daycare centres. Based on the factors influencing perception differences, principal component analysis and structural equation modelling (SEM) were conducted to determine which space improves the performance preferentially to increase overall end-user satisfaction.

Findings

As the utilisation of indoor spaces increases after COVID-19, improvement of indoor spaces except for indoor playroom is necessary, especially, advancement of the quality of teachers' rooms.

Practical implications

Outputs by reflecting the end-user experiences support to understand which spaces are managed from the limited resources.

Originality/value

Theoretical framework for daycare centre was established in Korea where guidelines were insufficient, and differences in perception of each risk of stakeholders were identified. Moreover, gradual statistical analysis was set to construct end-user-focused centres by extracting where the performance of space should be improved in prior.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Access

Year

Last 12 months (1)

Content type

1 – 1 of 1