Search results

1 – 2 of 2
Article
Publication date: 13 August 2018

Isaac Animah, Mahmood Shafiee, Nigel Simms, John Ahmet Erkoyuncu and Jhareswar Maiti

A substantial number of production assets in the offshore oil and gas industry are facing operation beyond their anticipated design life, thus necessitating a service life…

Abstract

Purpose

A substantial number of production assets in the offshore oil and gas industry are facing operation beyond their anticipated design life, thus necessitating a service life extension program in the future. Selection of the most suitable strategy among a wide range of potential options to extend the lifetime of equipment (e.g. re-using, reconditioning, remanufacturing, refurbishing and adding on safety/process control measures) remains a challenging task that involves several technical, economic and organizational complexities. In order to tackle this challenge, it is crucial to develop analytical tools and methods capable of evaluating and prioritizing end-of-life strategies with respect to their associated costs and quantifiable benefits. The paper aims to discuss these issues.

Design/methodology/approach

This paper presents a life-cycle cost-benefit analysis approach to identify the most suitable life extension strategy for ageing offshore assets by taking into account all the capital, installation, operational, maintenance and risk expenditures during the extended phase of operation. The potential of the proposed methodology is demonstrated through a case study involving a three-phase separator vessel which was constructed in the mid-1970s.

Findings

The results from the application case indicate that the capital expenditure (CapEx) accounts for the largest portion of life cycle cost for the replacement strategy, while risk expenditure (RiskEx) is the major contributor to costs associated with life extension. A sensitivity analysis is also conducted to identify factors having the greatest impact on the optimum life extension solution, including oil price, production rate and money interest rate.

Practical implications

In the past, the decisions about life extension or replacement of in-service equipment were often made in a qualitative way based on experience and judgment of engineers and inspectors. This study presents a “quantitative” framework to evaluate and compare the costs, benefits and risks associated with life extension strategies and subsequently to select the best strategy based on benefit/cost ratios.

Originality/value

To the best of authors’ knowledge, no studies before have applied life cycle assessment and cost-benefit analysis methods to prioritize the potential life extension strategies in the oil and gas industry sector. The proposed approach not only assists decision makers in selecting the most suitable life extension strategy but also helps duty holders reduce the costs corresponding to life extension execution.

Details

Journal of Quality in Maintenance Engineering, vol. 24 no. 3
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 16 April 2024

Rahadian Haryo Bayu Sejati, Dermawan Wibisono and Akbar Adhiutama

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor…

Abstract

Purpose

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor productivity without compromising human safety in Indonesian upstream oil field operations that manage ageing and life extension (ALE) facilities.

Design/methodology/approach

The research design applies a pragmatic paradigm by employing action research strategy with qualitative-quantitative methodology involving 385 of 1,533 workers. The KBPMS-L6s conceptual framework is developed and enriched with the Analytical Hierarchy Process (AHP) to prioritize fit-for-purpose Key Performance Indicators. The application of L6s with Human Performance Modes analysis is used to provide a statistical baseline approach for pre-assessment of the contractor’s organizational capabilities. A comprehensive literature review is given for the main pillars of the contextual framework.

Findings

The KBPMS-L6s concept has given an improved hierarchy for strategic and operational levels to achieve a performance benchmark to manage ALE facilities in Indonesian upstream oil field operations. To increase quality management practices in managing ALE facilities, the L6s application requires an assessment of the organizational capability of contractors and an analysis of Human Performance Modes (HPM) to identify levels of construction workers’ productivity based on human competency and safety awareness that have never been done in this field.

Research limitations/implications

The action research will only focus on the contractors’ productivity and safety performances that are managed by infrastructure maintenance programs for managing integrity of ALE facilities in Indonesian upstream of oil field operations. Future research could go toward validating this approach in other sectors.

Practical implications

This paper discusses the implications of developing the hybrid KBPMS- L6s enriched with AHP methodology and the application of HPM analysis to achieve a 14% reduction in inefficient working time, a 28% reduction in supervision costs, a 15% reduction in schedule completion delays, and a 78% reduction in safety incident rates of Total Recordable Incident Rate (TRIR), Days Away Restricted or Job Transfer (DART) and Motor Vehicle Crash (MVC), as evidence of achieving fit-for-purpose KPIs with safer, better, faster, and at lower costs.

Social implications

This paper does not discuss social implications

Originality/value

This paper successfully demonstrates a novel use of Knowledge-Based system with the integration AHP and HPM analysis to develop a hybrid KBPMS-L6s concept that successfully increases contractor productivity without compromising human safety performance while implementing ALE facility infrastructure maintenance program in upstream oil field operations.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

1 – 2 of 2