Search results

1 – 4 of 4
Article
Publication date: 24 September 2024

Taha Shokatian, Sepehr Ghazinoory, Shohreh Nasri and Hadi Safari

This study aims to develop and apply a process model for prioritizing and selecting basic research projects in developing countries.

Abstract

Purpose

This study aims to develop and apply a process model for prioritizing and selecting basic research projects in developing countries.

Design/methodology/approach

Basic research is mainly funded by governments and since, unlike technological research, it does not have clear business goals, its prioritization is one of the complicated issues in formulating science and technology policy. Adopting a design science research methodology, the authors chose a general framework for project portfolio selection as an appropriate artifact for solving this problem. By customizing it for two specific features of this study, i.e. national scale of the problem and the basic nature of research proposals, the authors developed the proposed framework for solving the problem of priority setting.

Findings

The process for selecting basic research proposals consists of several steps, which can be categorized into eight steps including strategic decisions, preparation, pre-screening, evaluating individual proposals, screening, portfolio selection and monitoring. This study emphasizes the necessity of defining goals that can be evaluated for the national basic research portfolio, as a key strategic decision. Evaluating individual proposals is a peer-review-based process. In contrast, portfolio selection is done through a zero-one linear programming model. The validity of the proposed framework has been confirmed based on the data obtained from the Iran National Science Foundation.

Originality/value

To the best of the authors’ knowledge, in this research, for the first time, a mathematical model for prioritizing basic research at the national level has been presented, which effectively contributes to policymaking regarding the development of an optimum national research portfolio.

Details

Journal of Modelling in Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1746-5664

Keywords

Article
Publication date: 6 February 2024

Luwei Zhao, Qing’e Wang, Bon-Gang Hwang and Alice Yan Chang-Richards

The purpose of this study is to develop a new hybrid method that combines interpretative structural modeling (ISM) and matrix cross-impact multiplication applied to classification…

Abstract

Purpose

The purpose of this study is to develop a new hybrid method that combines interpretative structural modeling (ISM) and matrix cross-impact multiplication applied to classification (MICMAC) to investigate the influencing factors of sustainable infrastructure vulnerability (SIV).

Design/methodology/approach

(1) Literature review and case study were used to identify the possible influencing factors; (2) a semi-structured interview was conducted to identify representative factors and the interrelationships among influencing factors; (3) ISM was adopted to identify the hierarchical structure of factors; (4) MICMAC was used to analyze the driving power (DRP) and dependence power (DEP) of each factor and (5) Semi-structured interview was used to propose strategies for overcoming SIV.

Findings

Results indicate that (1) 18 representative factors related to SIV were identified; (2) the relationship between these factors was divided into a five-layer hierarchical structure. The 18 representative factors were divided into driving factors, dependent factors, linkage factors and independent factors and (3) 12 strategies were presented to address the negative effects of these factors.

Originality/value

The findings illustrate the factors influencing SIV and their hierarchical structures, which can benefit the stakeholders and practitioners of an infrastructure project by encouraging them to take effective countermeasures to deal with related SIVs.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 February 2024

Agana Parameswaran, K.A.T.O. Ranadewa and Akila Pramodh Rathnasinghe

The proliferation of lean principles in the construction industry is offset by the enduring uncertainty among industry stakeholders regarding their respective roles in lean…

Abstract

Purpose

The proliferation of lean principles in the construction industry is offset by the enduring uncertainty among industry stakeholders regarding their respective roles in lean implementation. This uncertainty is further compounded by the scarcity of empirical investigations in this area. Consequently, this study undertakes the task of bridging this knowledge gap by identifying the critical roles of lean learners and their indispensable contributions to achieving successful lean implementation.

Design/methodology/approach

A qualitative exploratory approach informed by an interpretivism perspective was adopted. The case study strategy was employed to gather data from three contracting organisations that had implemented lean practices. Empirical data was collected through in-depth semi-structured interviews with fifteen industry experts and complemented by document reviews. To analyse the data, a code-based content analysis approach was employed using NVivo software, while Power BI software was utilised to develop a comprehensive force-directed graph visualisation.

Findings

The research findings substantiated nine lean learners and unveiled a set of seventy-three roles associated with them. The force-directed graph facilitated the identification of lean learners and their connections to the emerged roles. Notably, the graph highlighted the pivotal role played by project managers and internal lean trainers in ensuring the success of lean implementation, surpassing the contributions of other lean learners.

Originality/value

The implications of findings extend to industry professionals seeking to establish a robust lean learning framework to expedite lean implementation within the construction sector. This study not only provides a comprehensive definition of lean learners’ roles but also transcends specific construction types, making it a significant catalyst for global impact.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 8
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 24 July 2023

Lin Yang, Xiaoyue Lv and Xianbo Zhao

Abnormal behaviors such as rework, backlog, changes and claims generated by project organizations are unavoidable in complex projects. When abnormal behaviors emerge, the…

Abstract

Purpose

Abnormal behaviors such as rework, backlog, changes and claims generated by project organizations are unavoidable in complex projects. When abnormal behaviors emerge, the previously normal state of interactions between organizations will be altered to some extent. However, previous studies have ignored the associations and interactions between organizations in the context of abnormal organizational behaviors (AOBs), making this challenging to cope with AOBs. As a result, the objective of this paper is to explore how to reduce AOBs in complex projects at the organizational level from a network perspective.

Design/methodology/approach

To overcome the inherent limitations of a single case study, this research integrated two data collection methods: questionnaire survey and expert scoring method. The questionnaire survey captured the universal data on the influence possibility of AOBs between complex project organizations and the expert scoring method got the influence probability scores of AOBs between organizations in the case. Using these data, four organizational influence network models of AOBs based on a case were developed to demonstrate how to destroy AOBs networks in complex projects using network attack theory (NAT).

Findings

First, the findings show that controlling AOBs generated by key organizations preferentially and improving the ability of key organizations can weaken AOBs network, enabling more effective coping strategies. Second, the owners, government, material suppliers and designers are identified as key organizations across all four influence networks of AOBs. Third, change and claim behaviors are more manageable from the organizational level.

Practical implications

Project managers can target specific organizations for intervention, weaken the AOBs network by applying NAT and achieve better project outcomes through coping strategies. Additionally, by taking a network perspective, this research provides a novel approach to comprehending the associations and interactions between organizations in the context of complex projects.

Originality/value

This paper proposes a new approach to investigating AOBs in complex projects by simultaneously examining rework, backlog, change and claim. Leveraging NAT as a novel tool for managing the harmful effects of influence networks, this study extends the knowledge body in the field of organizational behavior (OB) management and complex project management.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 4 of 4