Case study
Publication date: 1 November 2023

Goutam Dutta

Mr. Sajjan Jindal, MD of JVSL (nos JSW) wanted to bring the latest technology of iron making into India. His project went to several cost overrun and time overrun due to several…

Abstract

Mr. Sajjan Jindal, MD of JVSL (nos JSW) wanted to bring the latest technology of iron making into India. His project went to several cost overrun and time overrun due to several foreseen and unforessen circumstances. This case discusses the issues new technology introduction in iron making area, problem faced by inexperienced contractor. It shows the need for proper risk management is required. It also shows the criticality of the project does not mean time cost trade off, but many other factors like reliability of the equipment, process and reliability of the equipment and plants.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 1 November 2023

Goutam Dutta

COREX, a new technology brought by Mr. Jindal, froze before going into live operations resulting in 10 month delay. This case discusses the project management monitoring methods…

Abstract

COREX, a new technology brought by Mr. Jindal, froze before going into live operations resulting in 10 month delay. This case discusses the project management monitoring methods used by them. Their use of Microsoft Project in place of Primavera is interesting. Before this, India did not have expertise in COREX. The case also discussed how to build project team when the local expertise is not availble. The case also shows how much of monitoring methods discussed in books are practicable.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 30 July 2018

Goutam Dutta

S. R. Pandey, Superintending Engineer (SE), Rural Roads Department, Bihar wanted to have a meeting of all the agencies involved, including his other engineers, the contractors to…

Abstract

S. R. Pandey, Superintending Engineer (SE), Rural Roads Department, Bihar wanted to have a meeting of all the agencies involved, including his other engineers, the contractors to discuss his village road-making project in Pradhan Mantri Gram Sadak Yojona (PMGSY). This case discusses how the concept of work breakdown is used to subdivide all the activities of road-making into different sub activities (earthwork, bridgework, roadwork and other miscellaneous activities) in different levels.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 14 February 2014

Goutam Dutta

This is the first implementation of Revenue Management System in a major international hotel chain in India. The case describes the history of development, corporate story of…

Abstract

This is the first implementation of Revenue Management System in a major international hotel chain in India. The case describes the history of development, corporate story of overdrive for profit, system integration issues. It describes two components of a revenue management system, forecasting and optimization. It also raises several questions that need to be addressed before implementing a RMS.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 31 March 2016

Goutam Dutta

This case deals with several types of uncertainties faced by project team in an oil company north east in India. These challenges and uncertainties are in the areas drawing…

Abstract

This case deals with several types of uncertainties faced by project team in an oil company north east in India. These challenges and uncertainties are in the areas drawing approval, supply chain, critical equipment availability, soll type, control room, soil type, employee availability, environmental clearances, safety and wildlife clearances. This project demonstrates the ownership issues, why it is difficult to complete a project on time in the Northeast of India or why public sector project gets delayed.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 1 September 2017

Lakshmi Shankar Iyer and Goutam Dutta

The case deals with the unforeseen uncertainties faced by Reva, the first electric car of India, while entering the Indian market. The company was able to take up the challenge of…

Abstract

The case deals with the unforeseen uncertainties faced by Reva, the first electric car of India, while entering the Indian market. The company was able to take up the challenge of making an energy efficient car. As a new product, Reva achieved operational success, developing an electric, low energy car. Its marketing strategies had limited consumer pull and had to be strengthened to gain consumer acceptance. The ecosystem worldwide is looking for support from governments on the concept and the infrastructure of this product category.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 31 March 2016

Ajay Shukla and Goutam Dutta

This case deals with steps taken by NTPC in construction and project management in 500 MW power plant. The project have several innovative ways of managing challenges, in land…

Abstract

This case deals with steps taken by NTPC in construction and project management in 500 MW power plant. The project have several innovative ways of managing challenges, in land acquisition, design, implementation, contract worker management, enforcement of safety rules, managing regulation iand in team building in leadership. A suitable case for site management, it shows in spite of being a public sector undertaking, how the project was constructed in record time of 42 months.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 15 February 2014

Arnab Laha and Goutam Dutta

In this case we describe the gradual transformation of India's largest private sector steel manufacturer Tata Steel that enabled it to win the coveted Deming Prize for quality…

Abstract

In this case we describe the gradual transformation of India's largest private sector steel manufacturer Tata Steel that enabled it to win the coveted Deming Prize for quality. The case discusses how the company is able to maintain a relentless focus on meeting the customers' needs, sustain a culture for excellence in quality, build processes that empower the workers in taking decisions related to their area of work freely, instill leadership skills at all levels, and embed continuous improvement as part of their organizational culture.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 27 February 2019

K. V. Sandhyavani, Arun Kumar, G. Taviti Naidu and Goutam Dutta

This is a case of a crisis project management which showcases the unpredictable nature of the project and the role of management in handling the crisis. It is the case of a very…

Abstract

This is a case of a crisis project management which showcases the unpredictable nature of the project and the role of management in handling the crisis. It is the case of a very severe cyclonic storm hitting the city of Visakhapatnam plant during October, 2014. The whole city was devastated and so was the situation in the Steel plant as it was under zero power conditions for around 10 days. This case gives need for managing an integrated steel plant in case of very severe cyclonic storm and documents the sequence of events and managing unforeseen uncertainty using NTCP concepts.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

1 – 9 of 9