Search results
1 – 2 of 2Mahesh Babu Purushothaman and Jeff Seadon
This review paper, using a systematic literature review (SLR) approach, aims to unravel the various system-wide waste in the construction industry and highlight the connectivity…
Abstract
Purpose
This review paper, using a systematic literature review (SLR) approach, aims to unravel the various system-wide waste in the construction industry and highlight the connectivity to construction phases, namely men, materials, machines, methods and measurement (5M) and impacting factors.
Design/methodology/approach
This study used an SLR approach and examined articles published since the 2000s to explore the connectivity of system-wide waste to construction phases, 5M and impacting factors. The results are given in table forms and a causal loop diagram.
Findings
Results show that the construction and demolition (CD) waste research carried out from various perspectives is standalone. The review identified ten types of system-wide waste with strong interlinks in the construction industry. The finding highlights connectivity between wastes other than material, labour and time and the wastes' impacting factors. Further, the review results highlighted the solid connectivity for construction phases, 5M, and impacting factors such as productivity (P), delay (D), accidents (A), resource utilisation (R) and cost(C).
Research limitations/implications
SLR methodology limitations include not keeping in phase with the most updated field knowledge. This limitation is offset by choosing the range for literature review within the last two decades. This literature review may not have captured all published articles because the restriction of database access and search was based only on English. Also, fruitful articles hiding in less popular journals may not be included in the well-known database that was searched. Researcher bias of the authors and other researchers that authored the articles referred to is a limitation. These limitations are acknowledged.
Practical implications
This article unravels the construction system-wide waste and the waste's interlinks, which would aid industry understanding and focus on eliminating the waste. The article highlights the connectivity of system-wide wastes to 5M, which would help better understand the causes of the waste. Further, the paper discusses the connectivity of system-wide waste, 5M and P, D, A, R and C that would aid the organisation's overall performance. The practical and theoretical implications include a better understanding of waste types to help capture better data for waste reduction and productivity improvement. The operating managers could use the tracking of wastes to compare estimated and actual resources at every process stage. This article on system-wide waste, 5M and P, D, A, R and C, relationships and their effects can theorize that the construction industry is more likely to identify clear root causes of waste now than previously. The theoretical implications include enhanced understanding for academics on connectivity between waste, 5M and P, D, A, R and C that the academics can use and expand to provide new insights to existing knowledge.
Originality/value
For the first time, this article categorised and highlighted the ten types of waste in construction industries and the industries' connectivity to construction phases, 5M and impacting factors.
Details
Keywords
Karen Humphries, Caroline Clarke, Kate Willoughby and Jake Smithson
The purpose of this paper is to develop an understanding of the experience of secure care from the patients’ perspective.
Abstract
Purpose
The purpose of this paper is to develop an understanding of the experience of secure care from the patients’ perspective.
Design/methodology/approach
A systematic review of qualitative literature was conducted. The data was sourced from the electronic databases: PsychINFO, CINAHL, Medline and the Web of Science Core Collection using pre-defined search terms. A total of 17 studies, conducted in various countries worldwide and covering high, medium and low secure inpatient settings, were included for review. The analysis involved integrating findings from across the literature and was guided by thematic synthesis.
Findings
A total of eight themes were generated from the data, three of which provided an understanding of the experience of forensic secure care, and the remaining five themes provided an understanding of the factors which may influence the experience of secure care.
Practical implications
Developing understanding of patient experience can lead to service improvements, potentially impacting patients’ motivation and engagement and thus reducing admission times, potential recalls and recidivism.
Originality/value
To the best of the authors’ knowledge, this is the first systematic review to date to exclusively explore the broad topic of the patient experience of secure mental health care.
Details