Search results

1 – 2 of 2
Article
Publication date: 2 May 2019

Hadi Mahami, Farnad Nasirzadeh, Ali Hosseininaveh Ahmadabadian, Farid Esmaeili and Saeid Nahavandi

This paper aims to propose an automatic imaging network design to improve the efficiency and accuracy of automated construction progress monitoring. The proposed method will…

Abstract

Purpose

This paper aims to propose an automatic imaging network design to improve the efficiency and accuracy of automated construction progress monitoring. The proposed method will address two shortcomings of the previous studies, including the large number of captured images required and the incompleteness and inaccuracy of generated as-built models.

Design/methodology/approach

Using the proposed method, the number of required images is minimized in two stages. In the first stage, the manual photogrammetric network design is used to decrease the number of camera stations considering proper constraints. Then the image acquisition is done and the captured images are used to generate 3D points cloud model. In the second stage, a new software for automatic imaging network design is developed and used to cluster and select the optimal images automatically, using the existing dense points cloud model generated before, and the final optimum camera stations are determined. Therefore, the automated progress monitoring can be done by imaging at the selected camera stations to produce periodic progress reports.

Findings

The achieved results show that using the proposed manual and automatic imaging network design methods, the number of required images is decreased by 65 and 75 per cent, respectively. Moreover, the accuracy and completeness of points cloud reconstruction is improved and the quantity of performed work is determined with the accuracy, which is close to 100 per cent.

Practical implications

It is believed that the proposed method may present a novel and robust tool for automated progress monitoring using unmanned aerial vehicles and based on photogrammetry and computer vision techniques. Using the proposed method, the number of required images is minimized, and the accuracy and completeness of points cloud reconstruction is improved.

Originality/value

To generate the points cloud reconstruction based on close-range photogrammetry principles, more than hundreds of images must be captured and processed, which is time-consuming and labor-intensive. There has been no previous study to reduce the large number of required captured images. Moreover, lack of images in some areas leads to an incomplete or inaccurate model. This research resolves the mentioned shortcomings.

Article
Publication date: 14 November 2022

Abdul Hannan Qureshi, Wesam Salah Alaloul, Wong Kai Wing, Syed Saad, Khalid Mhmoud Alzubi and Muhammad Ali Musarat

Rebar is the prime component of reinforced concrete structures, and rebar monitoring is a time-consuming and technical job. With the emergence of the fourth industrial revolution…

Abstract

Purpose

Rebar is the prime component of reinforced concrete structures, and rebar monitoring is a time-consuming and technical job. With the emergence of the fourth industrial revolution, the construction industry practices have evolved toward digitalization. Still, hesitation remains among stakeholders toward the adoption of advanced technologies and one of the significant reasons is the unavailability of knowledge frameworks and implementation guidelines. This study aims to investigate technical factors impacting automated monitoring of rebar for the understanding, confidence gain and effective implementation by construction industry stakeholders.

Design/methodology/approach

A structured study pipeline has been adopted, which includes a systematic literature collection, semistructured interviews, pilot survey, questionnaire survey and statistical analyses via merging two techniques, i.e. structural equation modeling and relative importance index.

Findings

The achieved model highlights “digital images” and “scanning” as two main categories being adopted for automated rebar monitoring. Moreover, “external influence”, “data-capturing”, “image quality”, and “environment” have been identified as the main factors under “digital images”. On the other hand, “object distance”, “rebar shape”, “occlusion” and “rebar spacing” have been highlighted as the main contributing factors under “scanning”.

Originality/value

The study provides a base guideline for the construction industry stakeholders to gain confidence in automated monitoring of rebar via vision-based technologies and effective implementation of the progress-monitoring processes. This study, via structured data collection, performed qualitative and quantitative analyses to investigate technical factors for effective rebar monitoring via vision-based technologies in the form of a mathematical model.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 2 of 2