1 – 10 of over 2000Abstract
Purpose
Under the constraints of given passenger service level and coupling travel demand with train departure time, this study optimizes the train operational plan in an urban rail corridor to minimize the numbers of train trips and rolling stocks considering the time-varying demand of urban rail passenger flow.
Design/methodology/approach
The authors optimize the train operational plan in a special network layout, i.e. an urban rail corridor with dead-end terminal yard, by decomposing it into two sub-problems: train timetable optimization and rolling stock circulation optimization. As for train timetable optimization, the authors propose a schedule-based passenger flow assignment method, construct the corresponding timetabling optimization model and design the bi-directional coordinated sequential optimization algorithm. For the optimization of rolling stock circulation, the authors construct the corresponding optimization assignment model and adopt the Hungary algorithm for solving the model.
Findings
The case study shows that the train operational plan developed by the study's approach meets requirements on the passenger service quality and reduces the operational cost to the maximum by minimizing the numbers of train trips and rolling stocks.
Originality/value
The example verifies the efficiency of the model and algorithm.
Details
Keywords
Angelo Rosa, Giuliano Marolla and Olivia McDermott
This study explores how Lean was deployed in several hospitals in the Apulia region in Italy over 3.5 years.
Abstract
Purpose
This study explores how Lean was deployed in several hospitals in the Apulia region in Italy over 3.5 years.
Design/methodology/approach
An exploratory qualitative design was drawn up based on semi-structured interviews.
Findings
The drivers of Lean in hospitals were to increase patient satisfaction and improve workplace well-being by eliminating non-value-add waste. The participants highlighted three key elements of the pivotal implementation stages of Lean: introduction, spontaneous and informal dissemination and strategic level implementation and highlighted critical success and failure factors that emerged for each of these stages. During the introduction, training and coaching from an external consultant were among the most impactful factors in the success of pilot projects, while time constraints and the adoption of process analysis tools were the main barriers to implementation. The experiences of the Lean teams strongly influence the process of spontaneous dissemination aided by the celebration of project results and the commitment of the departmental hospital heads.
Practical implications
Lean culture can spread to allow many projects be conducted spontaneously, but the Lean paradigm can struggle to be adopted strategically. Lean in healthcare can fail because of the lack of alignment of Lean with leadership in healthcare and with their strategic vision, a lack of employees' project management skills and crucially the absence of a Lean steering committee.
Originality/value
The absence of managerial expertise and a will to support Lean implementation do not allow for systemic adoption of Lean. This is one of the first and largest long-term case studies on a Lean cross-regional multi-hospital application in healthcare.
Details
Keywords
Shuxin Ding, Tao Zhang, Kai Sheng, Yuanyuan Chen and Zhiming Yuan
The intelligent Central Traffic Control (CTC) system plays a vital role in establishing an intelligent high-speed railway (HSR) system. As the core of HSR transportation command…
Abstract
Purpose
The intelligent Central Traffic Control (CTC) system plays a vital role in establishing an intelligent high-speed railway (HSR) system. As the core of HSR transportation command, the intelligent CTC system is a new HSR dispatching command system that integrates the widely used CTC in China with the practical service requirements of intelligent dispatching. This paper aims to propose key technologies and applications for intelligent dispatching command in HSR in China.
Design/methodology/approach
This paper first briefly introduces the functions and configuration of the intelligent CTC system. Some new servers, terminals and interfaces are introduced, which are plan adjustment server/terminal, interface for automatic train operation (ATO), interface for Dynamic Monitoring System of Train Control Equipment (DMS), interface for Power Supervisory Control and Data Acquisition (PSCADA), interface for Disaster Monitoring, etc.
Findings
The key technologies applied in the intelligent CTC system include automatic adjustment of train operation plans, safety control of train routes and commands, traffic information data platform, integrated simulation of traffic dispatching and ATO function. These technologies have been applied in the Beijing-Zhangjiakou HSR, which commenced operations at the end of 2019. Implementing these key intelligent functions has improved the train dispatching command capacity, ensured the safe operation of intelligent HSR, reduced the labor intensity of dispatching operators and enhanced the intelligence level of China's dispatching system.
Originality/value
This paper provides further challenges and research directions for the intelligent dispatching command of HSR. To achieve the objectives, new measures need to be conducted, including the development of advanced technologies for intelligent dispatching command, coping with new requirements with the development of China's railway signaling system, the integration of traffic dispatching and train control and the application of AI and data-driven modeling and methods.
Details
Keywords
Nobuko Nishiwaki and Akitsu Oe
This study examines the case of an initial training, called “Dojo”, invented and implemented at a production site in the Czech Republic. It clarifies the initial training program…
Abstract
Purpose
This study examines the case of an initial training, called “Dojo”, invented and implemented at a production site in the Czech Republic. It clarifies the initial training program implementation process and offers a conceptual framework for cooperative management of subsidiary activities at the site and firm.
Design/methodology/approach
This study conducts an in-depth analysis of qualitative data from the Czech production site over a five-year period. The theoretical base is the theorization and labeling phase of management innovation (MI), the final phase of which legitimizes a new management practice. Interview data, archival data, pictures and financial data are used for the analysis.
Findings
To legitimize the Dojo in the operational flow controlled by the site and firm, the Czech production site acquires validation of the Dojo from employees and board members of the Japanese and European headquarters, helping the site build trustful relationships with them. Training programs, process standardization and skills standardization of the workers offer benefits to the trainees, production site and firm.
Originality/value
The authors offer theoretical insights into MI at the subsidiary-level, which past studies have not differentiated at the firm-level. The authors also provide details of the implementation and management of initial training for newly hired blue-collar workers at the production site. The findings complement related literature on human resource management and operational management.
Details
Keywords
Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva
Productivity increase is correlated with profitability, sustainability and competitiveness of the construction firms. Recent studies reveal that the primary causes of productivity…
Abstract
Purpose
Productivity increase is correlated with profitability, sustainability and competitiveness of the construction firms. Recent studies reveal that the primary causes of productivity decline are poor usage of scientific and technological advances, ineffective supervision strategies and poor apprenticeship facilities/opportunities. Accordingly, the purpose of this study was to evaluate how well construction supervisors can utilise fundamental science and technological concepts/ideas to increase the efficiency and productivity of construction activities.
Design/methodology/approach
A new strategic layout was designed with the use of potential training guide tools. Based on the designed layout, a new supervisory training programme was developed, and 62 construction supervisors were selected, trained and evaluated in line with six parts of competencies and the relevant learning domains. An assessment guide with different levels of descriptions and criteria was developed through literature analysis and expert interviews. The research tools were verified using comprehensive approaches.
Findings
The overall mean values of supervisors’ performance scores indicate proficient-level grades in the competency characteristics related to taking measurements, generating drawings/designs using manual techniques and computer-aided tools, involving Bill of Quantities (BOQ) preparations and preparing training plans/materials for improving the competencies of labourers on estimation, measurements and understanding drawings. Their proficiency was notably lower in the use of information and communication technology application tools in construction tasks compared to others. The findings point to a modern generalised guideline that establishes the ranges of supervisory attributes associated with science and technology-related applications.
Research limitations/implications
The study outcomes produce conceptualised projections to restructure and revalue the job functions of various working categories by adding new definitions within the specified scope. This may result in constructive benefits to upgrading the current functions associated with urbanisation, sustainability and society. The implementation of the study’s findings/conclusions will have a significant impact on present and future practices in other developing nations and developing industries, even if they are directly applicable to the Sri Lankan construction industry.
Originality/value
Up to certain limits/stages, the study fills not only the knowledge gap in the field of creating protocols and application techniques connected to lifelong learning and skill enhancement/upgrading but also the existing gaps in work attributes and roles of construction supervisors associated with the utilisation of fundamental science and technological concepts/ideas towards reinforcing sustainable and productive site operations.
Details
Keywords
Liao Zhiwen, Yong Qin and Mingming Wang
This paper aim at providing decision support for operational adjustment. In order to effectively reduce the external interference impact on train operation.
Abstract
Purpose
This paper aim at providing decision support for operational adjustment. In order to effectively reduce the external interference impact on train operation.
Design/methodology/approach
According to the reality that there are two kinds of high-speed trains running in China, considering the reality that there are two speed level train running in Chinese high-speed railway, this paper proposed the high-speed railway operation adjustment model based on priority, and the objective function is to minimize interference impact on train operation.
Findings
Adjustment strategy based on priority than based on sequence can effectively reduce the interference influence on train operation, which makes the train resume the planned operation back on schedule more quickly.
Research limitations/implications
The solution of large-scale cases is too slow, and the practical application is limited.
Originality/value
The model was verified by a case, and the case results proved that adjustment strategy based on priority than based on sequence can effectively reduce the interference influence on train operation, which makes the train resume the planned operation back on schedule more quickly.
Details
Keywords
Abstract
Purpose
In recent years, railway systems worldwide have faced challenges such as the modernization of engineering projects, efficient management of intelligent digital railway equipment, rapid growth in passenger and freight transport demands, customized transport services and ubiquitous transport safety. The transformation toward intelligent digital transformation in railways has emerged as an effective response to the formidable challenges confronting the railway industry, thereby becoming an inevitable global trend in railway development.
Design/methodology/approach
This paper, therefore, conducts a comprehensive analysis of the current state of global railway intelligent digital transformation, focusing on the characteristics and applications of intelligent digital transformation technology. It summarizes and analyzes relevant technologies and applicable scenarios in the realm of railway intelligent digital transformation, theoretically elucidating the development process of global railway intelligent digital transformation and, in practice, providing guidance and empirical examples for railway intelligence and digital transformation.
Findings
Digital and intelligent technologies follow a wave-like pattern of continuous iterative evolution, progressing from the early stages, to a period of increasing attention and popularity, then to a phase of declining interest, followed by a resurgence and ultimately reaching a mature stage.
Originality/value
The results offer reference and guidance to fully leverage the opportunities presented by the latest wave of the digitalization revolution, accelerate the overall upgrade of the railway industry and promote global collaborative development in railway intelligent digital transformation.
Details
Keywords
Huijuan Zhou, Rui Wang, Dongyang Weng, Ruoyu Wang and Yaoqin Qiao
The interruption event will seriously affect the normal operation of urban rail transit lines,causing a large number of passengers to be stranded in the station and even making…
Abstract
Purpose
The interruption event will seriously affect the normal operation of urban rail transit lines,causing a large number of passengers to be stranded in the station and even making the train stranded in the interval between stations. This study aims to reduce the impact of interrupt events and improve service levels.
Design/methodology/approach
To address this issue, this paper considers the constraints of train operation safety, capacity and dynamic passenger flow demand. It proposes a method for adjusting small loops during interruption events and constructs a train operation adjustment model with the objective of minimizing the total passenger waiting time. This model enables the rapid development of train operation plans in interruption scenarios, coordinating train scheduling and line resources to minimize passenger travel time and mitigate the impact of interruptions. Regarding the proposed train operation adjustment model, an improved genetic algorithm (GA) is designed to solve it.
Findings
The model and algorithm are applied to a case study of interruption events on Beijing Subway Line 5. The results indicate that after solving the constructed model, the train departure intervals can be maintained between 1.5 min and 3 min. This ensures both the safety of train operations on the line and a good match with passengers’ travel demands, effectively reducing the total passenger waiting time and improving the service level of the urban rail transit system during interruptions. Compared to the GA algorithm, the algorithm proposed in this paper demonstrates faster convergence speed and better computational results.
Originality/value
This study explicitly outlines the adjustment method of using short-turn operation during operational interruptions, with train departure times and station stop times as decision variables. It takes into full consideration safety constraints on train operations, train capacity constraints and dynamic passenger demand. It has constructed a train schedule optimization model with the goal of minimizing the total waiting time for all passengers in the system.
Details
Keywords
Cheng-Wei Lin, Wan-Chi Jackie Hsu and Hui-Ju Su
The shipper selects a suitable shipping route and plans for a voyage in order to import and export cargo on the basis of published sailing schedules. The reliability of the…
Abstract
The shipper selects a suitable shipping route and plans for a voyage in order to import and export cargo on the basis of published sailing schedules. The reliability of the sailing schedule will influence the shipper’s logistics expense, which means that the logistics costs will depend on the reliability of schedules published by container shipping companies. Therefore, it is important to consider factors which can cause delays would for container ships sailing on sea routes. The reliability of published sailing schedules can be affected by a number of different factors. This study adopts the multi-criteria decision making (MCDM) method to estimate the importance of the delaying factors in a sailing schedule. In addition, the consistent fuzzy preference relations (CFPR) method is applied to identify the subjective importance (weights) of the delaying factors. The entropy weight method combined with the actual performance of the container shipping company are both used when estimating the objective importance (weights) of the delaying factors. According to the analysis results, the criteria can be divided into four quadrants with different management implications, which indicate that instructions for chase strategy, sailing schedule control, fleet allocation, transship operation arrangement and planning for ports in routes are often ignored by container shipping companies. Container shipping companies should consider adjusting their operational strategies, which would greatly improve their operational performance.
Details
Keywords
Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva
Site supervision features largely influence the productivity status of construction operational processes. This study aims to use a case study containing mixed methods to test the…
Abstract
Purpose
Site supervision features largely influence the productivity status of construction operational processes. This study aims to use a case study containing mixed methods to test the site supervisory traits in applying mathematical theories to construction operations for directing supervisory capabilities under various operational characteristics.
Design/methodology/approach
A total of 62 construction site supervisors were trained as part of a new apprenticeship programme. Through literature reviews and expert consultations, grading criteria were designed with various degrees of descriptions and score ratings. The supervisory attributes were evaluated under seven competency element characteristics mapped with the relevant learning domains.
Findings
The results demonstrate a detailed sectional view of performance ratings of supervisors under different characteristics of competency factors with the validity, reliability, applicability and generalisability assurance of the research findings using relevant statistical tests and expert evaluations.
Research limitations/implications
Though the research applications were engaged directly with the construction industry in the Sri Lankan setting, other developing countries and emerging industries can also employ equivalent tactics to attain similar outcomes in their industry-based operations.
Originality/value
The research findings have led to producing a new guide that makes significant impacts on deciding the capability levels in construction supervisory attributes while executing problem-solving applications in construction planning and operational processes. Accordingly, the findings push to open a gate to intake advanced cognitive attributes towards addressing the industry's knowledge gap on how the problem-solving-based apprenticeship protocols need to be linked with the supervision features.