Search results

1 – 5 of 5
Open Access
Article
Publication date: 4 July 2022

Modupe Cecilia Mewomo, Petronella Minehle Ndlovu and Comfort Olubukola Iyiola

Although facilities management (FM) has been advocated in the construction industry to address the issues of facilities in buildings, their adoption is still plagued with…

7266

Abstract

Purpose

Although facilities management (FM) has been advocated in the construction industry to address the issues of facilities in buildings, their adoption is still plagued with barriers. The factors affecting FM practices need detailed investigation. However, few studies have been conducted on the factors affecting FM practices in developing countries such as South Africa. This study aims to investigate the factors affecting effective FM practices in public buildings in South Africa.

Design/methodology/approach

To achieve this aim, a quantitative survey was carried out using questionnaire to gather relevant data in the study area. The collected data were analysed using descriptive statistics and principal component (factor) analysis. The study was conducted on 39 facilities managers in the Department of Public Works in KwaZulu-Natal Province, South Africa.

Findings

The descriptive analysis revealed that availability of funds, occupants’ knowledge of FM, absence of policy guiding FM practice, state of deterioration of facilities and design concepts and scope were significant challenges affecting effective FM practices in public buildings in South Africa. The result of the principal component analysis of the factors affecting FM practices were grouped into organisational factors, structural/design errors and end users’ elements.

Research limitations/implications

As it is widely understood that “money” plays a significant role in the performance of any activity or function, administrators/governments of public facilities should strive to plan and make appropriate finances accessible to facilities managers. Participation of facilities managers in the planning stage can also help reduce design flaws and their maintenance implications. In addition, adequate training for professionals can improve FM awareness and productivity.

Originality/value

The paper reveals the structural framework of the factors that can influence the effective facilities management practices in public buildings.

Details

Facilities, vol. 40 no. 15/16
Type: Research Article
ISSN: 0263-2772

Keywords

Open Access
Article
Publication date: 23 May 2023

Linda Gabbianelli and Tonino Pencarelli

Based on the main studies presented in the literature, this work aims to examine the level of student satisfaction towards the on-campus accommodation service provided by an

6375

Abstract

Purpose

Based on the main studies presented in the literature, this work aims to examine the level of student satisfaction towards the on-campus accommodation service provided by an Italian university. Notably, the objectives of the study are twofold: (1) to examine the mediating role of student satisfaction on the relationship between university on-campus accommodation service quality and word-of-mouth and (2) to determine whether there is any significant difference in students' satisfaction towards on-campus accommodation in terms of gender and the halls of residence.

Design/methodology/approach

The study is based on the results of a survey carried out through an online questionnaire by 381 students living on campus at the University of Urbino.

Findings

The findings revealed that the quality perceived by university students in relation to individual services had a positive impact on their general satisfaction towards the halls of residence experience.

Research limitations/implications

The study presents some limitations such as lack of temporal comparisons, a focus on specific service quality items and the fact that it refers to a single Italian university.

Practical implications

The findings of this study will help the management of public universities to improve the quality of services in their halls of residence for the satisfaction of their students.

Originality/value

To the authors' knowledge, there have been no previous studies about on-campus accommodation service quality conducted in Italy. The study contributes to enrich the service quality literature, confirming both that the sum of the quality of individual elements is not as the overall satisfaction and the outcome intention of positive WOM depends not only on service quality attributes, but also from an overall evaluation of satisfaction.

Details

The TQM Journal, vol. 35 no. 5
Type: Research Article
ISSN: 1754-2731

Keywords

Open Access
Article
Publication date: 30 August 2022

Petteri Annunen, Juho Tella, Sini Pekki and Harri Haapasalo

This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the…

1964

Abstract

Purpose

This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the elements for creating the maintenance capability and the process to be used in construction life cycle projects for buildings.

Design/methodology/approach

An inductive and qualitative research method was used to construct the proposed process based on the literature and 18 interviews in two large construction companies.

Findings

The results indicate that the maintenance phase is usually overlooked during the design and construction phases, and capabilities are not systematically built. In particular, processes are lacking in data management, causing severe problems in maintenance.

Originality/value

This study presents a process including key requirements and activities for creating maintenance capability in conjunction with the design and construction phases, which is novel to the literature. The validated process can be adapted based on the needs of the construction company.

Details

Journal of Facilities Management , vol. 22 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 14 September 2023

Peter Dodzi Kwasi Agbaxode, Ehsan Saghatforoush and Sitsabo Dlamini

The conventional project delivery (CPD) approach has been reported in the literature as the most widely used project delivery method in the construction industry globally compared…

Abstract

Purpose

The conventional project delivery (CPD) approach has been reported in the literature as the most widely used project delivery method in the construction industry globally compared to other delivery methods. However, researchers and practitioners have argued that the approach, specifically during the production of design documentation under the CPD, lacks certain capabilities that ensure quality and enhance project delivery. Therefore, this study aims to use the Ghanaian construction industry to identify the capabilities required of the CPD in practice, particularly during the production of design documentation.

Design/methodology/approach

The study design follows a pragmatist philosophy and uses mixed methods based on a deductive approach. Data collection involved a questionnaire survey, followed by semi-structured interviews. Quantitative data analysis used descriptive and inferential statistics, whereas qualitative data analysis used content analysis with the assistance of IBM SPSS and QSR Nvivo 12 Pro.

Findings

Findings indicate that there should be incentives for producing good design documentation quality; mandatory coordination of design documentation; improving collaboration among designers; and allowing contractors to make input during the design stage.

Practical implications

The results indicate the need for the identified capabilities to be introduced in the CPD approach to improve design documentation quality.

Originality/value

This study offers a significant insight into the specific capabilities that are required of the CPD approach in practice particularly, in the production of design documentation

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 1 June 2021

Marit Støre-Valen

This paper aims to gain insight in how the involvement of facilities management (FM) and clinical employees are practiced in new Norwegian hospital projects and to study the…

1366

Abstract

Purpose

This paper aims to gain insight in how the involvement of facilities management (FM) and clinical employees are practiced in new Norwegian hospital projects and to study the benefits and lessons learned from the involvement.

Design/methodology/approach

This study is conducted by cross-sectional case studies of eight hospital projects by using a literature review, interviews and document studies of FM and clinical employees and project leaders (PLs) among Sykehusbygg.

Findings

The service design approach with a structured interaction between the PL’s of Sykehusbygg, and the different disciplines of clinical employees and FM specialist was rewarding and efficient. The facilitator role of Sykehusbygg is essential to manage such a broad and complex involvement process using a wide range of various techniques at the different stages of the projects (dialogue meetings, review meetings, workshops, post-it notes, 2-D drawings, mock-up and 3-D models, as well as virtual reality (VR) and Building Information Modeling technology). The clinical employees’ framework is stronger and much more structured than the involvement of FM competences through the different stages of the projects. The property management competences were involved at the early concept phase and design phase, whereas the Operation and Maintenance (O&M) competences were getting involved through the construction and commissioning phase. The value of FM involvement in all stages of the project is seen beneficial, particularly when the FM specialist become a part of the design team and located physically at the same place. The main reported benefits of early FM involvement are cost-effective technical solutions and installations, less design flaws and improved functionality, as well as a stronger ownership and mutual respect between the clinical and FM disciplines. However, not all hospital organizations see the benefits of the FM involvement of all stages, as they are driven by reducing capital cost. In one of the new projects, other ways of involving the FM competences were tested. Additionally, particularly for the O&M competences, a dialogue meeting with a clear focus of sharing experiences with different technical solution was found rewarding in terms of cost benefits.

Research limitations/implications

This study does not consider the social impact of the choices made in the design phase. The findings also indicated a certain development of the FM involvement. This is not studied in two of the newest projects where they are still in the design phase and the FM role was not interviewed.

Practical implications

The PL role is important as a facilitator role of the involvement process.

Social implications

A dialogue meeting with a group of O&M people was found rewarding and valuable for knowledge sharing. This methodology can be further developed and tested, as this group of stakeholders is not always available for giving input in the project.

Originality/value

The value of this study is the description of the interaction between the PLs and the hospital organization in the eight projects and lessons learned by the involvement of FM competences and clinical employees.

Details

Facilities , vol. 39 no. 11/12
Type: Research Article
ISSN: 0263-2772

Keywords

1 – 5 of 5