Search results

1 – 6 of 6
Article
Publication date: 17 April 2024

Hazwani Shafei, Rahimi A. Rahman, Yong Siang Lee and Che Khairil Izam Che Ibrahim

Amid rapid technological progress, the construction industry is embracing Construction 4.0, redefining work practices through emerging technologies. However, the implications of…

Abstract

Purpose

Amid rapid technological progress, the construction industry is embracing Construction 4.0, redefining work practices through emerging technologies. However, the implications of Construction 4.0 technologies to enhancing well-being are still poorly understood. Particularly, the challenge lies in selecting technologies that critically contribute to well-being enhancement. Therefore, this study aims to evaluate the implications of Construction 4.0 technologies to enhancing well-being.

Design/methodology/approach

A list of Construction 4.0 technologies was identified from a national strategic plan on Construction 4.0, using Malaysia as a case study. Fourteen construction industry experts were selected to evaluate the implications of Construction 4.0 technologies on well-being using fuzzy Technique for Order Preference by Similarity to Ideal Solution (TOPSIS). The expert judgment was measured using linguistic variables that were transformed into fuzzy values. Then, the collected data was analyzed using the following analyses: fuzzy TOPSIS, Pareto, normalization, sensitivity, ranking performance and correlation.

Findings

Six Construction 4.0 technologies are critical to enhancing well-being: cloud & real-time collaboration, big data & predictive analytics, Internet of Things, building information modeling, autonomous construction and augmented reality & virtualization. In addition, artificial intelligence and advanced building materials are recommended to be implemented simultaneously as a very strong correlation exists between them.

Originality/value

The novelty of this study lies in a comprehensive understanding of the implications of Construction 4.0 technologies to enhancing well-being. The findings can assist researchers, industry practitioners and policymakers in making well-informed decisions to select Construction 4.0 technologies when targeting the enhancement of the overall well-being of the local construction industry.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 4 December 2023

Nnedinma Umeokafor, Abimbola Windapo and Oluwole Alfred Olatunji

The purpose of this study is to investigate the influences of the characteristics of procurement strategies, in this instance labour-only, on project performance concerning health…

Abstract

Purpose

The purpose of this study is to investigate the influences of the characteristics of procurement strategies, in this instance labour-only, on project performance concerning health and safety (H&S), a project performance indicator.

Design/methodology/approach

Using non-probability purposeful and snowballing sampling methods, questionnaires were used to collect data from construction professionals in Nigeria. This was then analysed using descriptive (frequency and mean scores) and inferential statistics (Mann–Whitney-U and Kendall's Tau_b tests).

Findings

The findings indicate a statistically significant negative correlation between ‘the level of client involvement and ‘fatalities' and a positive one with ‘conducting of health and safety risk assessment' and ‘conducting employee surveys on health and safety attitude’. Poor hygiene is found to be the worst lagging indicator, while conducting of inspection is the most adopted leading indicator of project health and safety performance. It also emerged that there is no significant difference in the health and safety performance of projects procured through the procurement strategy in urban and rural areas.

Practical implications

The study provides valuable insight into the complexities in H&S management due to the high level of client involvement in labour-only procurement system (LoPS) projects and the level of diversity in their responsibilities therein. It creates a fundamental direction for developing a detailed framework or guidance notes for client involvement in the integration of H&S into LoPS projects.

Originality/value

This is the first study that examines the influence of the characteristics of procurement strategy on project health and safety performance. Evidence in the literature shows that project delivery outcomes significantly improve if procurement is strategically used, including when it is considered early in projects. However, integrating H&S into procurement strategies has received little attention.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 2 January 2024

Dillip Kumar Das

The delay in real estate projects in India is pervasive. Organization and management (O&M) and project management (PM)-related challenges are argued to contribute to project…

Abstract

Purpose

The delay in real estate projects in India is pervasive. Organization and management (O&M) and project management (PM)-related challenges are argued to contribute to project delays. This study examined the O&M and PM factors that cause delays, the level of implementation of various O&M and PM aspects in real estate projects and how the challenges can be alleviated.

Design/methodology/approach

Perception surveys among the consumers and relevant stakeholders engaged in real estate projects in the Bhubaneswar and Cuttack regions of India were conducted to collect data on the factors of delay and implementation of the O&M and PM aspects. Relevant statistical methods and structural equation modeling (SEM) were used for data analysis.

Findings

Findings suggest that from the O&M point of view, poor decision-making, mishandling of finance, concurrent execution of many projects, diversion and misuse of finance for unrelated activities, lack of PM personnel and poor management contribute to the delay. Further, although the project initiation is satisfactorily done, most of the PM principles are not largely used, thus leading to delay.

Research limitations/implications

The study does have limitations, including its reliance on a perception survey of consumers and stakeholders, a limited sample size and a restricted number of projects. Nevertheless, the study highlights the need to address poor O&M and the insufficient application of PM principles to combat project delays in the Indian real estate sector.

Practical implications

Proper O&M and adequate application of PM will enable professional management of the projects and avoid delay.

Social implications

Proper O&M and the application of adequate PM would reduce delays in real estate projects. Consequently, conflicts between the companies and consumers might be reduced and housing and infrastructure demands might be met.

Originality/value

The study manifested that the lack of adequate implementation of O&M and PM aspects leads to delays. So, it is theorized that O&M and PM play critical roles in the success of real estate projects. Appropriate implementation of the principles and best practices linked to these aspects might alleviate the challenges of delay in real estate projects in India.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 11 January 2024

Maria Luiza de Souza Morato and Karine Araujo Ferreira

The pupose of this study is to systematically review the current literature on the value stream mapping (VSM) application in the construction industry to investigate the evolution…

Abstract

Purpose

The pupose of this study is to systematically review the current literature on the value stream mapping (VSM) application in the construction industry to investigate the evolution observed over time and the results obtained by adopting this tool. In addition, special attention was given to the potential of VSM in identifying loss and waste, as well as their main causes.

Design/methodology/approach

The study analyses papers in literature using Preferred Reporting Items for Systematic Reviews and Meta-Analyses research protocol. As a result, 383 papers were initially identified, and 47 papers were selected.

Findings

It was observed that the number of studies addressing this topic has been increasing over the past decade and findings related to the evolution, application and the benefits obtained from the VSM application in context of construction were presented. Additionally, the authors found that the two most cited lean wastes were waiting and defects in the production chain. The main causes of this waste and loss were also identified in this work.

Practical implications

This paper contributes by presenting the applicability of VSM as a tool in the construction as found in the literature. For academics, it will be possible to clearly observe research gaps and for industry managers, to identify the main sources of waste and assess the performance of the tool’s application.

Originality/value

The study uses a systematic review to analyze the application of the VSM tool in the construction industry and provides guidance for future research by identifying research gaps, in addition to conducting an extensive analysis of the tool’s potential in waste identification in the studied papers and their primary causes.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 7 December 2023

Adefemi Aka, Abubakar Danladi Isah, Olusegun Idris Salisu and Abdulkabir Opeyemi Bello

Waste has been a major challenge in the construction industry. Lean concepts have been adopted in developed nations to overcome waste. However, developing countries are still…

Abstract

Purpose

Waste has been a major challenge in the construction industry. Lean concepts have been adopted in developed nations to overcome waste. However, developing countries are still faced with the challenge due to a lack of strategies for effective lean knowledge by construction practitioners. The purpose of this research is to identify the strategies for lean knowledge in the future Nigerian construction industry.

Design/methodology/approach

This was achieved through a case study of a Nigerian university. Assignments and questionnaires were the two instruments used for data collection in the study. Content analysis was adopted to analyse the data obtained from the assignments, while statistical tools such as correlation and ANOVA analysis were used to analyse the questionnaire data.

Findings

The findings of the study showed that the introduction of lean theory into students’ academic curriculum, lean practical classes and collaboration between universities, industry and lean construction institutes are some of the critical strategies for adequate lean knowledge in the future Nigerian construction industry.

Research limitations/implications

The study is case-based and focused on a single university. The study did not also put clients’ level of lean knowledge as well as future required acquaintance into consideration.

Practical implications

This study is important as it will enable students to have an adequate understanding of the concept of lean construction right from a higher institution level. This study will enable students to put the knowledge into practice in the construction industry, hence eliminating waste or NVAAs in future construction projects.

Originality/value

The findings of the study could enhance concerted efforts by universities, lean construction institutes and the construction industry towards an intentional and systematic delivery of lean knowledge that will reduce waste in future Nigerian construction projects. Further studies should be carried out to identify the success factors required by clients for effective lean knowledge in construction projects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 8 January 2024

Tirivavi Moyo, Mazen Omer and Benviolent Chigara

Sustainable construction deficits are common in developing economies, and resolutions are constrained by the failure to prioritise the plethora of available indicators. This study…

Abstract

Purpose

Sustainable construction deficits are common in developing economies, and resolutions are constrained by the failure to prioritise the plethora of available indicators. This study aims to report on overlapping indicators for benchmarking sustainable construction for construction organisations.

Design/methodology/approach

Online survey data were collected from construction professionals, academics and senior managers in government bodies. Pearson chi-squared tests and overlapping analysis were used to determine significant indicators. Kruskal–Wallis tests were used to determine statistically significant differences among the dimensions.

Findings

Overlapping analysis determined indicators significant for economic, environmental and social performance. Environmental protection and reporting (pollution and emissions) were significant for all three performance dimensions. The most significant indicators are economic performance (adequate competence of key project staff), environmental performance (environmental protection and reporting – pollution and emissions) and social performance (adequate sustainability expenditure by construction organisations). Significant differences due to dimensions existed for adequate competence of key project staff, sustainable construction and eco-design, adequate governance and organisational excellence of construction projects and satisfactory workers’ morale.

Research limitations/implications

Determining overlapping indicators enables prioritised implementation that ensures sustainable construction. Excluding construction workers was a significant limitation for a holistic interrogation.

Originality/value

To the best of the authors’ knowledge, this is the first study to determine overlapping indicators for sustainable construction performance in Zimbabwe.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Access

Year

Last 6 months (6)

Content type

Earlycite article (6)
1 – 6 of 6