Article
Publication date: 23 September 2022

Hossein Sohrabi and Esmatullah Noorzai

The present study aims to develop a risk-supported case-based reasoning (RS-CBR) approach for water-related projects by incorporating various uncertainties and risks in the…

Abstract

Purpose

The present study aims to develop a risk-supported case-based reasoning (RS-CBR) approach for water-related projects by incorporating various uncertainties and risks in the revision step.

Design/methodology/approach

The cases were extracted by studying 68 water-related projects. This research employs earned value management (EVM) factors to consider time and cost features and economic, natural, technical, and project risks to account for uncertainties and supervised learning models to estimate cost overrun. Time-series algorithms were also used to predict construction cost indexes (CCI) and model improvements in future forecasts. Outliers were deleted by the pre-processing process. Next, datasets were split into testing and training sets, and algorithms were implemented. The accuracy of different models was measured with the mean absolute percentage error (MAPE) and the normalized root mean square error (NRSME) criteria.

Findings

The findings show an improvement in the accuracy of predictions using datasets that consider uncertainties, and ensemble algorithms such as Random Forest and AdaBoost had higher accuracy. Also, among the single algorithms, the support vector regressor (SVR) with the sigmoid kernel outperformed the others.

Originality/value

This research is the first attempt to develop a case-based reasoning model based on various risks and uncertainties. The developed model has provided an approving overlap with machine learning models to predict cost overruns. The model has been implemented in collected water-related projects and results have been reported.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 March 2023

Siyu Su, Youchao Sun, Yining Zeng and Chong Peng

The use of aviation incident data to carry out aviation risk prediction is of great significance for improving the initiative of accident prevention and reducing the occurrence of…

Abstract

Purpose

The use of aviation incident data to carry out aviation risk prediction is of great significance for improving the initiative of accident prevention and reducing the occurrence of accidents. Because of the nonlinearity and periodicity of incident data, it is challenging to achieve accurate predictions. Therefore, this paper aims to provide a new method for aviation risk prediction with high accuracy.

Design/methodology/approach

This paper proposes a hybrid prediction model incorporating Prophet and long short-term memory (LSTM) network. The flight incident data are decomposed using Prophet to extract the feature components. Taking the decomposed time series as input, LSTM is employed for prediction and its output is used as the final prediction result.

Findings

The data of Chinese civil aviation incidents from 2002 to 2021 are used for validation, and Prophet, LSTM and two other typical prediction models are selected for comparison. The experimental results demonstrate that the Prophet–LSTM model is more stable, with higher prediction accuracy and better applicability.

Practical implications

This study can provide a new idea for aviation risk prediction and a scientific basis for aviation safety management.

Originality/value

The innovation of this work comes from combining Prophet and LSTM to capture the periodic features and temporal dependencies of incidents, effectively improving prediction accuracy.

Details

Aircraft Engineering and Aerospace Technology, vol. 95 no. 7
Type: Research Article
ISSN: 1748-8842

Keywords

1 – 2 of 2