To read this content please select one of the options below:

A successful gold cost reduction programme

G.F. Jacky (EMCM Component Engineering Tektronix, Inc., Beaverton, Oregon, USA)

Circuit World

ISSN: 0305-6120

Article publication date: 1 February 1982

104

Abstract

With an annual cost of gold exceeding 10 million dollars for its captive circuit board shop, Tektronix, Inc., established a task force to implement conservation. Elements included Purchasing, Material Control, Quality Assurance, Manufacturing and Engineering. Salient programme items were inventory reduction, material accountability, modification of processes, procedures, and equipment to improve uniformity of thickness, and elimination of non‐essential gold use. In addition, scrap‐handling procedures were modified to improve accountability and reclaim returns.

Citation

Jacky, G.F. (1982), "A successful gold cost reduction programme", Circuit World, Vol. 8 No. 3, pp. 10-13. https://doi.org/10.1108/eb053668

Publisher

:

MCB UP Ltd

Copyright © 1982, MCB UP Limited

Related articles