To read this content please select one of the options below:

The use of PRINCE project management methodology in choosing a new library system at the University of Wales Bangor

Program: electronic library and information systems

ISSN: 0033-0337

Article publication date: 1 March 1995

536

Abstract

This paper examines how the application of a project management methodology (PRINCE) together with the use of project management software (Microsoft Project Version 4.0 for Windows) helped with the exercise of replacing a library computer system at the University of Wales Bangor. It concludes that the use of project management techniques within the higher education sector is necessary. Although the task of adopting such methods appears daunting, the possible alternative of expensive failure is perhaps more frightening. In addition, it examines how computer software can greatly reduce the administrative burden of managing large projects, especially and almost paradoxically, when resources are limited.

Citation

Lewis, A.C. (1995), "The use of PRINCE project management methodology in choosing a new library system at the University of Wales Bangor", Program: electronic library and information systems, Vol. 29 No. 3, pp. 231-240. https://doi.org/10.1108/eb047197

Publisher

:

MCB UP Ltd

Copyright © 1995, MCB UP Limited

Related articles