To read this content please select one of the options below:

Aircraft Generators Produced Twice as Quickly: Stand No 5223

Aircraft Engineering and Aerospace Technology

ISSN: 0002-2667

Article publication date: 1 March 1990

20

Abstract

THE floor‐to‐floor time to manufacture component parts for an aircraft generator has been halved from one year to six months at the Power Systems Division of Lucas Aerospace, Hemel Hempstead, following reorganisation of its shop floor into production cells.

Citation

(1990), "Aircraft Generators Produced Twice as Quickly: Stand No 5223", Aircraft Engineering and Aerospace Technology, Vol. 62 No. 3, pp. 5-5. https://doi.org/10.1108/eb036907

Publisher

:

MCB UP Ltd

Copyright © 1990, MCB UP Limited

Related articles