Yamazaki Multi‐Pallet Machining Centre Reduces Lead Time by 75 Per cent
28
Abstract
A Yamazaki H22 power centre has reduced overall lead time for the production of certain aero engine components from 20–24 weeks using conventional methods, to just six weeks.
Citation
(1986), "Yamazaki Multi‐Pallet Machining Centre Reduces Lead Time by 75 Per cent", Aircraft Engineering and Aerospace Technology, Vol. 58 No. 5, pp. 12-13. https://doi.org/10.1108/eb036280