To read this content please select one of the options below:

The Harrier T. Mk. 2

Aircraft Engineering and Aerospace Technology

ISSN: 0002-2667

Article publication date: 1 April 1970

46

Abstract

AS a preliminary to the detail description of the Harrier V/S.T.O.L. Operational Trainer — designated Harrier T. Mk. 2 — it is worth recalling that Hawker Siddeley first made proposals for a dual version of the P.1127 as early as September 1960 (Fig. 1). However, due to the relatively small number of early P.1127 and Kestrel aircraft, efforts to introduce a trainer proved abortive until the Harrier G.R. Mk. 1 production order materialised, following the batch of six Harrier development single seatcr aircraft. A feasibility study for a V/S.T.O.L. Dual Version Harrier was submitted to MinTech in September 1965. This was followed up by a project study in April 1967, which culminated in firm orders for two development two‐seater aircraft, to be followed by a batch of production aircraft.

Citation

(1970), "The Harrier T. Mk. 2", Aircraft Engineering and Aerospace Technology, Vol. 42 No. 4, pp. 33-43. https://doi.org/10.1108/eb034623

Publisher

:

MCB UP Ltd

Copyright © 1970, MCB UP Limited

Related articles