Corrosion management during the construction of oil, gas and water lines

C.O. Emenike (School of Engineering, Bolton Institute of Higher Education, Deane Road, Bolton BL3 5AB, England)

Anti-Corrosion Methods and Materials

ISSN: 0003-5599

Article publication date: 1 March 1993

80

Abstract

Strategic management dictates that the arrangement for corrosion control and monitoring should be made during project construction. Subsequent modification/ rectification to accommodate such omissions is uneconomical because of the additional outlay incurred. Contractual obligation cannot absorb such a cost. However, changes in corrosion characteristics resulting from, say, alteration in feed stock and/or operating conditions, may make such a rectification mandatory.

Citation

Emenike, C.O. (1993), "Corrosion management during the construction of oil, gas and water lines", Anti-Corrosion Methods and Materials, Vol. 40 No. 3, pp. 4-6. https://doi.org/10.1108/eb007322

Publisher

:

MCB UP Ltd

Copyright © 1993, MCB UP Limited

Related articles