Corrosion management during the construction of oil, gas and water lines
Abstract
Strategic management dictates that the arrangement for corrosion control and monitoring should be made during project construction. Subsequent modification/ rectification to accommodate such omissions is uneconomical because of the additional outlay incurred. Contractual obligation cannot absorb such a cost. However, changes in corrosion characteristics resulting from, say, alteration in feed stock and/or operating conditions, may make such a rectification mandatory.