BRIEFING FOR ELECTRICAL INSTALLATIONS PART 2: GREMLINS IN THE POWER SUPPLY
137
Abstract
Last month we discussed methods of establishing the total quantum of an electrical supply. Three strategic issues were also introduced — the need to provide for growth, flexibility in operation and a continuous and stable operation. This last point will be the focus of this month's article.
Citation
Dukes, B. (1989), "BRIEFING FOR ELECTRICAL INSTALLATIONS PART 2: GREMLINS IN THE POWER SUPPLY", Facilities, Vol. 7 No. 8, pp. 7-10. https://doi.org/10.1108/eb006501
Publisher
:MCB UP Ltd
Copyright © 1989, MCB UP Limited