A survey of the assembly of wire harnesses in industry
Prof. Dr.‐Ing. Rolf‐Dieter Schraft
(Fraunhofer Institut, Stuttgart, FRG)
Dipl.‐Ing. Gerd Schlaich
(Fraunhofer Institut, Stuttgart, FRG)
62
Abstract
Research shows automated assembly could give time and cost savings in the production of wire harnesses.
Citation
Schraft, R. and Schlaich, G. (1988), "A survey of the assembly of wire harnesses in industry", Assembly Automation, Vol. 8 No. 1, pp. 29-32. https://doi.org/10.1108/eb004230
Publisher
:MCB UP Ltd
Copyright © 1988, MCB UP Limited