Anatomization of the overall equipment effectiveness (OEE) for various machines in a tool and die shop

Sagarika Raju (Department of Industrial Engineering and Management, JSS Academy of Technical Education, JSS Campus, Bengaluru, India) (Visvesvaraya Technological University, Belagavi, India)
Harsha Arun Kamble (Department of Industrial Engineering and Management, JSS Academy of Technical Education, JSS Campus, Bengaluru, India) (Visvesvaraya Technological University, Belagavi, India)
Rashmi Srinivasaiah (Department of Industrial Engineering and Management, JSS Academy of Technical Education, JSS Campus, Bengaluru, India) (Visvesvaraya Technological University, Belagavi, India)
Devappa Renuka Swamy (Department of Industrial Engineering and Management, JSS Academy of Technical Education, JSS Campus, Bengaluru, India) (Visvesvaraya Technological University, Belagavi, India)

Journal of Intelligent Manufacturing and Special Equipment

ISSN: 2633-6596

Article publication date: 25 March 2022

Issue publication date: 10 May 2022

862

Abstract

Purpose

The purpose of this research is to discover equipment losses and assess the accomplishment of overall equipment effectiveness (OEE) values.

Design/methodology/approach

Industries specialized in die shops often have issues regarding their efficiencies, conferring to statistics further production line department procedure for various machines frequently suffered restrictions owing to excessive downtime and speed losses in machines thus, reducing their effectiveness and efficiency. OEE is a means of determining how effective a piece of equipment is when in working condition. Calculation of OEE finds the heart of the issue and the root cause for the underlying problem.

Findings

The dimensional outcomes suggest that the average machine effectiveness has not attained the norm of >85%, but there is still room for progression.

Originality/value

One recommended procedure to reduce losses is to keep the actual pace of operation and downtime of equipment constant. Many such suggestions are provided to reduce the losses.

Keywords

Citation

Raju, S., Kamble, H.A., Srinivasaiah, R. and Swamy, D.R. (2022), "Anatomization of the overall equipment effectiveness (OEE) for various machines in a tool and die shop", Journal of Intelligent Manufacturing and Special Equipment, Vol. 3 No. 1, pp. 97-105. https://doi.org/10.1108/JIMSE-01-2022-0004

Publisher

:

Emerald Publishing Limited

Copyright © 2022, Sagarika Raju, Harsha Arun Kamble, Rashmi Srinivasaiah and Devappa Renuka Swamy

License

Published in Journal of Intelligent Manufacturing and Special Equipment. Published by Emerald Publishing Limited. This article is published under the Creative Commons Attribution (CC BY 4.0) licence. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and noncommercial purposes), subject to full attribution to the original publication and authors. The full terms of this licence may be seen at http://creativecommons.org/licences/by/4.0/legalcode


1. Introduction

Industry, market, product and technology are all crucial parts in the tool and die shops, and they are altering at a tremendous and fundamental tempo. The classical tool and die-making process are governed and driven by elements such as cost pressure, time pressure, quality standards, competitive dynamics and so on (Tang et al., 2004). The ancient tool and die-producing procedures are carried out carefully according to the product drawing of the client that is perhaps the most indispensable reason. Now, the tool and die industries are under enormous pressure to respond quickly to customers' needs to preserve their market positions, particularly in the automotive industry (Tang et al., 2004).

Automobile companies are continuing to lessen lead times in their development to obtain maximum markets. This trend influences the tool and dies complex, notably about the quality of the product characteristics development and serial production, where tool designers follow the crucial pathway of product development and have a great effect on the time of production start (Eversheim et al., 2002). To stay up with changing strategic plans and customer sourcing strategies, tool producers should get a fresh understanding of driving aspects such as new techniques and skills, mass customization of customers' items, greater product complexity, competitive pressures and higher efficiency (Xie et al., 2001). Meanwhile, the rapid development of computer technology, enterprise modeling and system engineering has lately begun to be implemented in the form of new production paradigms which may aid product development in the tool and die sector (Chin and Tang, 2002). In a dynamic environment, equipment effectiveness, new collaborative methodologies and technology are generally required to support the novel communication relationship between the customer and the toolmaker. To maintain a competitive edge in the face of increasing commercial rivalry, industrial leaders must assess the status of all company activities, including production and maintenance (Almeanazel, 2010). As global competition is increasing, CEOs' mindset has changed from improved productivity through economies of scale and internal knowledge to addressing market demands for agility, delivery performance and quality (Baluch et al., 2012). Higher productivity is essential for businesses to succeed. Examining the performance of the company's production plants is one way to improve efficiency (Almeanazel, 2010). The three forms of manufacturing facility issues that cause output to be halted or stopped are human, mechanical and environmental. One technique of resolving production facility concerns and increasing productivity is to require thorough assessment and management of production equipment (Hansen, 2001).

Nakajima (1998) established total productive maintenance (TPM) in the 1980s, which resulted in the invention of a statistic known as overall equipment effectiveness (OEE). It is a gadget that is commonly used in businesses to detect and monitor machine productivity. It is a performance measuring tool made of three parts: performance, availability and quality rate, and it provides an updated status of any product with the least computations (Lesshammar, 1999). Moreover, this technology can foresee prospective losses and provide remedies to prevent them from occurring. This measurement may be used for the equipment, people, or materials, resulting in improved product performance. The following are some of the benefits of OEE:

  1. OEE encourages reducing interruptions and other costs, resulting in better-quality equipment life cycle managing.

  2. Because of increased process visibility and operator empowerment, OEE may boost labor effectiveness while concurrently enhancing productivity.

  3. OEE may boost productivity by detecting bottlenecks.

  4. Product rework is decreased, which may subsidize to higher quality rates.

The majority of today's manufacturers' repair and maintenance issues are caused by a lack of arrangements or approaches that can examine the performance of existing equipment and give resolutions to the root cause of issues (Mainea et al., 2010). As a result, choosing the proper demonstration evaluation technique is critical for businesses to achieve their objectives. OEE is a performance measuring technique commonly utilized by organizations, particularly Japanese enterprises capable of overpowering equipment difficulties (Dal et al., 2000; Jeong and Phillips, 2001). Precision tools or metal forms known as dies are shaped by tool and die manufacturers and are used to cut, shape and mold metal and other constituents (Zandieh et al., 2012). CAD is used by tool and die makers to create products and parts. They input proposals into processor systems, which generate drawings for the tools and dies required. High downtime and equipment losses, according to evidence collected from the manufacturing line department, reliably delay the material production procedure, subsequent in low corporate thruput. This is because of a lack of vigorous handling, which damages the locomotive while also disrupting the business process and product eminence. The OEE strategy is the best way to deal with this issue (Relkar and Nandurkar, 2012). The OEE method may be used to evaluate the degree of efficacy and the quantity of fault that happens throughout the material industrial process. This way has always been broadly used by Japanese firms as well as firms from a variety of other republics (Dal et al., 2000; Mainea et al., 2010).

TPM and OEE are perilous for dropping the six major losses believed to be the root origins of incompetence. Both the availability of equipment and the quality of the product has a role in the link between TPM losses and effectiveness (Lesshammar, 1999). Face losses may occur at any point all over an operation and can be apparent, such as scrap, substitutions and failures, or unseen, such as lethargic running and continual changes to keep manufacturing within tolerance. Each organization should avoid three things when it comes to equipment upkeep.

Nakajima (1988) suggested there are six sorts of equipment losses that affect lower equipment routines. Are apparatus letdown, setup and modification, idle and minor slowdowns, reduced speed, process fault and low yield are the six noteworthy losses. Downtime losses, including setup and adjustment, are classed as downtime fatalities, dropping obtainability; speed losses, including idle and short slowdowns, are defined as speed losses, lowering presentation. Finally, defect loss caused by poor quality is classified as process defect and reduced yield.

1.1 Stoppage losses as a purpose of availability

Shutdowns are defined as the situation when yield is zero and the system generates nothing, or when the machine works and yet produces nothing during the annual inspection, and they are caused by two factors: a breakdown loss, which keeps referring to parts letdown that requires repair or replacement and the losses are caused by two factors: a breakdown loss, which alludes to parts failure that necessitates restoration, and the losses are caused by two factors: a breakdown loss, which demands fixing, and the deficits are triggered (Anantharaman and Nachiappan, 2006). For illustration, the beginning of fabrication or the start of split jobs, product revisions and also the status of the operation. One of the most common sources of this wastage is changes in equipment, dies, jigs and tools, along with setup, setup and adjustment delays (Almeanazel, 2010).

1.2 Losses in speed-related performance

These befall when the yield is less than the alignment speed output and no evaluation is performed to regulate whether the productivity meets the quality standard precondition. Speed loss can be separated into two categories: Minor halts can occur as a consequence of an appliance stopping, jamming or idling. Many individuals prefer to this as the breakdowns since it is a critical module that must be projected (Nakajima, 1998). There is a loss of speed when the speed of the equipment is reduced or the machine does not function at its academic maximum speed. The machine may be utilized at a slow pace to cope with the frequent incidence of quality flaws and minor stoppage issues. It is computed by likening the hypothetical and definite working loads (Almeanazel, 2010; Bamber et al., 2003).

1.3 Quality losses or defects

Whenever the result does not reach the requirement, this is known as a loss in quality. This may necessitate modification for quality concerns that arise all through the normal production cycle. Because the items do not fulfill the requirements, they must be changed to notify the defects (Maram et al., 2012). Rework requires the use of labor, implying that the corporation will incur some costs, and distress is also harmful. The ratio of first-class items to total production is used to calculate the magnitude of these losses. Second, there are yield losses, which result in raw material wastage. Raw material losses (connected to product strategy, manufacturing process and so on) and fine-tuning losses are the two types of yield losses (related to quality snags of items produced at the start of production, swops, etc.) (Almeanazel, 2010).

The goal of this learning is to evaluate the OEE of diverse machines to dodge big losses.

2. Methodology

OEE is a metric tool cast-off in the accomplishment of TPM programs to keep appliances in good working instruction by reducing 6 vital equipment fatalities. OEE is premeditated using three basic ratios: (1) availability ratio, (2) performance ratio and (3) quality ratio. It may be intended by multiplying these three relations. Figure 1 shows a flow illustration of OEE measurement (Na, 98 and the OEE formulation as given below

(1)OEE(%)=Availability×Performance×Quality×100

The availability ratio gives how much time is available to run equipment defines this as the ratio of operating time to loading time after modifying for equipment downtime. To calculate this, use equation (2).

(2)Availability=OperatingtimeLoadingtime×100

The third equation designates the capability of the machines to produce things. The operating rapidity rate and the net functioning rate define this ratio. The variance between the ideal speed (specified by the equipment's design) and the actual operating rapidity is stated as the operational speed rate. The net operating rate is the average rate at which a speed is upheld during a certain period (Zandieh et al., 2012). The net operational income proportion assesses whether an operation is steady through periods when the equipment is employed at low speeds. Formula (3) may be used to obtain the formula performance relation.

(3)Performance=Totalproduced×idealcycletimeOperationtime×100

The 4th equation imitates the equipment's ability to produce items that meet necessities. Formula (4) gives the calculation of quality.

(4)Quality= Net produced   defect amount Net produced  ×100

Succeeding the completion of the scheming and analysis, the next step is to make the inference using the criteria of standard initiatives, as specified in below Table 1. Then ideas for enhancement are made.

Seiichi Nakajima led the introduction of TPM, OEE and the Six Big Losses in the early 1970s while at the Japanese Institute of Plant Maintenance. In his 1984 book, Introduction to TPM (translated to English and published in 1988 by Productivity Press), Seiichi Nakajima included the above four “world-class” numbers.

3. Results

3.1 Availability proportion

By comparison of the definite operating time to the loading time, the availability is totaled. The availability rate is made known as given in Table 2.

The calculated rate is revealed to be 87.02%, while the objective is 90%, owing to press machine downtime.

3.2 Performance proportion

Performance rate embodies the machine's speed in transporting the best time against the engine running period. Table 3 demonstrates how to calculate this rate.

According to Table 3 calculations, press machines 3 and 14 performed fairly poorly. This is related to misfeeds, section jams and product flow pauses, as well as the absence of machine operative training, equipment age and tooling wear.

3.3 Rate of quality

The quality rate is a part of the total number of items that accomplish the quantified standard of all engineering sectors. Table 4 displays its calculation findings.

Based on the conclusions of the quality proportion calculation in Table 4, it can be detected that the worth of excellence was fairly low in all of the machines, but it grew in a few. Defective and good goods both wedged the growth in the value of quality in every equipment.

3.4 OEE calculation

After acquiring the 3 rates, the OEE of all machines is calculated. Table 5 displays the OEE totaling.

As per the outcomes of the OEE calculation in Table 5, the average value of effectiveness (OEE) was 75.99%. However, according to Table 5, the OEE number missed the mark of the worldwide threshold of >85% set by the Japan Institute of Plant Maintenance (JIPM). The availability and performance ratio has the lowest prevalence of values among the 3 variables that make the machine's OEE value, with a proportion of just 87.02 and 87.34% (Table 6). Machine breakdowns, machine adjustments/setups, machine stops, machine restricted speeds and equipment breakdown, horrible machine startup parts and bad machine production parts are the major losses in value and volume influencing the small proportion of OEE.

4. Discussion

As per the evaluation of the effectiveness value (OEE) of the press machineries, the factors that have the largest impact on the machine's profitability are delay and speed. This loss comes as an outcome of a machine breakdown, which demands a machine changeover, machine stops and machine reduced speeds.

After determining that speed and downtime are the most significant issues contributing to machine inadequacy, the following step is to pinpoint the source of the issue (Naderinejad and Nilipour Tabatabaei, 2011). Product misfeeds, product flow stoppage, level of machine operator training are amongst its determinants (Relka and Nandurkar, 2012). Failure of equipment, tooling damage, unintended maintenance, process preparation, machine changeovers and material shortage Based on these restrictions, the following stages must be done to evade the incidence of speed and downtime losses:

  1. Conduct risk assessments

  2. Install sensors to identify probable equipment faults early.

  3. Schedule routine machine maintenance

  4. Increase and improve staff communication

  5. Improve manufacturing equipment

  6. Develop a dependable preventive maintenance approach.

  7. Create a repetitive examination program for important equipment.

5. Suggestion

Our calculations suggested that the average standard of machine effectiveness in diverse press machines was 75.99%, and while the value set by JIPM (Nakajima, 1998) has not yet reached >85%, progress is still attainable. Downtime and speed losses are the most serious ramifications to the machines' overall ineffectiveness. Several approaches for reducing losses have been identified and therefore can be employed.

Figures

The OEE and its computation technique

Figure 1

The OEE and its computation technique

The world-class OEE factor

OEE factorWorld class (%)
OEE>85.0
Availability>90.0
Performance rate>95.0
Quality rate>99.9

Availability rate

Availability in %
Press machineFirst shift (5 am–1 pm)Second shift (1 pm–9 pm)Night shift (9 pm–5 am)Actual in %Target in %
Machine 186.6287.0286.2786.6490
Machine 28787.4586.9487.1390
Machine 386.7786.9587.2686.9990
Machine 487.3786.9586.8687.0690
Machine 587.3986.5485.7986.5790
Machine 687.2686.6587.1387.0190
Machine 787.4987.6787.3387.5090
Machine 887.9587.3387.7587.6890
Machine 987.0886.8386.8586.9290
Machine 1087.1887.2787.0887.1890
Machine 1186.5487.1987.1486.9690
Machine 1286.8187.286.8986.9790
Machine 1386.6385.5588.0586.7490
Machine 1486.787.3187.0687.0290
Machine 1587.1686.5787.2987.0190
AVG IN % 87.02

Performance rate

Performance in %
Press machineFirst shift (5 am–1 pm)Second shift (1 pm–9 pm)Night shift (9 pm–5 am)Actual in %Target in %
Machine 187.0886.8487.787.2195
Machine 286.7487.5587.0487.1195
Machine 386.5287.2686.9986.9295
Machine 487.7687.4388.0487.7495
Machine 587.2186.6786.9386.9495
Machine 687.7787.4187.6287.6095
Machine 787.8187.7788.1187.9095
Machine 886.4787.5287.2887.0995
Machine 987.6987.2887.3287.4395
Machine 1087.7887.6287.6787.6995
Machine 1187.6387.4387.4287.4995
Machine 1287.4887.5287.0487.3595
Machine 1387.2687.5187.7987.5295
Machine 1486.6587.3487.1987.0695
Machine 1587.0986.7587.4487.0995
AVG IN % 87.34

Quality rate

Quality in %
Press machineFirst shift (5 am–1 pm)Second shift (1 pm–9 pm)Night shift (9 pm–5 am)Actual in %Target in %
Machine 199.9899.9799.9899.9899.99
Machine 299.9699.9899.9899.9799.99
Machine 399.9899.9899.9899.9899.99
Machine 499.9899.9999.9899.9899.99
Machine 599.9899.9899.9899.9899.99
Machine 699.9799.9799.9899.9799.99
Machine 799.9799.9899.9899.9899.99
Machine 899.9899.9899.9799.9899.99
Machine 999.9899.9899.9899.9899.99
Machine 1099.9999.9899.9899.9899.99
Machine 1199.9899.9899.9899.9899.99
Machine 1299.9799.9899.9899.9899.99
Machine 1399.9899.9799.9799.9799.99
Machine 1499.9899.9799.9899.9899.99
Machine 1599.9799.9899.9899.9899.99
AVG IN %   99.98

The overall equipment effectiveness rate

Press machinesAvailability in %Performance in %Quality in %OEE in %
Machine 186.6487.2199.9875.54
Machine 287.1387.1199.9775.88
Machine 386.9986.9299.9875.60
Machine 487.0687.7499.9876.38
Machine 586.5786.9499.9875.25
Machine 687.0187.6099.9776.20
Machine 787.5087.9099.9876.89
Machine 887.6887.0999.9876.34
Machine 986.9287.4399.9875.98
Machine 1087.1887.6999.9876.43
Machine 1186.9687.4999.9876.07
Machine 1286.9787.3599.9875.94
Machine 1386.7487.5299.9775.90
Machine 1487.0287.0699.9875.74
Machine 1587.0187.0999.9875.76
AVG IN %87.0287.3499.9875.99

A comparison of world-class measuring versus corporate quantity

OEE from company (%)OEE given by world-class (%)
Availability87.02>90.0
Performance87.34>95.0
Quality99.98>99.9

References

Almeanazel, O.T.R. (2010), “Total productive maintenance review and overall equipment”, Jordan Journal of Mechanical and Industrial Engineering, Vol. 4 No. 4, pp. 517-522.

Anantharaman, N. and Nachiappan, R.M. (2006), “Evaluation of overall line effectiveness (OLE) in a continuous product line manufacturing system”, Journal of Manufacturing Technology Manufacturing System, Vol. 17 No. 7, pp. 987-1008.

Baluch, N., Sobry Abdullah, C. and Mohtar, S. (2012), “Measuring OEE in Malaysian palm oil mills”, Interdisciplinary Journal of Contemporary Research in Business, Vol. 4 No. 2, pp. 733-743.

Bamber, C.J., Castka, P., Sharp, J.M. and Motara, Y. (2003), “Cross-functional team working for overall equipment effectiveness (OEE)”, Journal of Quality in Maintenance Engineering, Vol. 9 No. 3, pp. 223-238.

Chin, K.-S. and Tang, D. (2002), “Web-based concurrent stamping part and die development”, Concurrent Engineering: Research and Applications, Vol. 10 No. 3, pp. 213-228.

Dal, B., Tugwel, P. and Greatbanks, R. (2000), “Overall equipment effectiveness as measure of operational improvement, a practical analisys”, International Journal of Operations and Production Management, Vol. 20 No. 12, pp. 1488-1502.

Eversheim, W., Westekemper, M. and Spennemann, F. (2002), “Cooperation with tool and fixture supplier”, in Zheng, L. and Possel-Doleken, F. (Eds), Strategic Production Networks, Springer-Verlag, Berlin, pp. 176-187.

Hansen, R.C. (2001), Overall Equipment Effectiveness; A Powerful Production/Maintenance Tool for in Creased Profit, Industrial Press, New York.

Jeong, K.-Y. and Phillips, D.T. (2001), “Operational efficiency and effectiveness measurement”, International Journal of Operations and Production Management, Vol. 21 No. 11, pp. 1404-1416.

Lesshammar, M. (1999), “Evaluation and improvement of manufacturing performance measurement system – the role of OEE”, International Journal of Operations and Production Management, Vol. 19 No. 1, pp. 55-78.

Maram, M., Manikandan, G. and Thaigarajan, K. (2012), “Overall equipment effectiveness measurement by weighted approach method”, International Multi Conferenence of Engineers and Computer scientists, Vol. 2.

Mainea, M., Duta, L., Patic, P.C. and Caciula, I. (2010), “A method to optimize the overall equipment effectiveness”, IFAC Proceedings Volumes, Vol. 536, pp. 242-247.

Naderinejad, M. and Nilipour Tabatabaei, S.A. (2011), “Comparison of OEE in continuous production line of Isomax unit of Esfahan Oil Refining Company (EORC) with world class manufacturing”, Interdisciplinary Journal of Contemporary Research in Business, Vol. 3 No. 6, pp. 466-482.

Nakajima, S. (1988), Introduction to Total Productive Maintenance, Productivity Press, Cambridge, MA.

Relkar, A.S. and Nandurkar, K.N. (2012), “Optimizing & analyzing overall equipment effectiveness (OEE) through design of experiments (DOE)”, Procedia Engineering, Vol. 38, pp. 2973-2980.

Tang, D., Eversheim, W. and Schuh, G. (2004), “A new generation of cooperative development paradigm in the tool and die making branch: strategy and technology”, Robotics and Computer-Integrated Manufacturing, Vol. 20 No. 4, pp. 301-311, doi: 10.1016/j.rcim.2003.11.001.

Xie, S.Q., Tu, P.L., Aitchison, D., Dunlop, R. and Zhou, Z.D. (2001), “A WWW based integrated product development platform for sheet metal parts intelligent concurrent design and manufacturing”, International Journal of Production Research, Vol. 39 No. 17, pp. 3829-3852.

Zandieh, S., Nilipuor Tabatabaei, S.A. and Ghandehary, M. (2012), “Evaluation of overall equipment effectiveness in a continuous process production system o condensate stabilization plant in Assalooyeh”, Interdisciplinary Journal of Contemporary Research in Business, Vol. 3 No. 10, pp. 10-11.

Further reading

Chan, F.T.S., Lau, H.C.W., Ip, R.W.L., Chan, H.K. and Kong, S. (2005), “Implementation of total productive maintenance: a case study”, International Journal of Production Economic, Vol. 95, pp. 71-94.

Sayuti, M., Juliananda, S. and Fatimah (2019), “Analysis of the overall equipment effectiveness (OEE) to minimize six big losses of pulp machine: a case study in pulp and paper industries”, IOP Conference Series: Materials Science and Engineering, Vol. 536 No. 1, doi: 10.1088/1757-899X/536/1/012136.

Corresponding author

Sagarika Raju can be contacted at: sagarikasanika@gmail.com

Related articles