To read this content please select one of the options below:

Evaluation of risks affecting international construction joint venture (ICJV) projects in Ghana

Stephen Akunyumu (Department of Construction Technology and Management, Kwame Nkrumah University of Science and Technology, Kumasi, Ghana)
Frank Fugar (Department of Construction Technology and Management, Kwame Nkrumah University of Science and Technology, Kumasi, Ghana)
Emmanuel Adinyira (Department of Construction Technology and Management, Kwame Nkrumah University of Science and Technology, Kumasi, Ghana)

Journal of Engineering, Design and Technology

ISSN: 1726-0531

Article publication date: 13 January 2023

236

Abstract

Purpose

The failure rate of international construction joint venture (ICJV) projects has been noted to be high in developing countries due to the complexity and risky nature of construction projects in the international market. The purpose of this study is to identify and evaluate the risks facing ICJV projects in Ghana.

Design/methodology/approach

A risk register was developed through a comprehensive literature review. The identified risks were then used in a questionnaire survey involving local and foreign partners in ICJV projects in Ghana.

Findings

From a total of 74 risks identified, categorized into country-level risks, market-level risks and project-level risks, the “top ten” risks found to be the most critical risks facing ICJV projects in Ghana include unstable currency exchange rates, inflation, design changes, high-interest rate, budget overrun, cash flow problems of the client, economy fluctuation, difficulty in obtaining approval of projects from host government authorities/bureaucracy, potential financial distress of JV partner and bribery and corruption.

Originality/value

This study provides a comprehensive list of risks ICJV partners are likely to encounter on their projects in developing countries. Furthermore, this study improves on one of the major limitations of previous ICJV studies by collecting data from both partners of the ICJV, appropriate for cross-cultural examination and comparison.

Keywords

Acknowledgements

The authors are grateful to the Ghana Education Trust Fund (GeTFund) for providing some of the financial support for the Doctoral Study from which this article was produced.

Citation

Akunyumu, S., Fugar, F. and Adinyira, E. (2023), "Evaluation of risks affecting international construction joint venture (ICJV) projects in Ghana", Journal of Engineering, Design and Technology, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/JEDT-06-2022-0299

Publisher

:

Emerald Publishing Limited

Copyright © 2022, Emerald Publishing Limited

Related articles