Isolated or out in front
Abstract
Describes the assembly process at Volvo′s Uddevalla plant. Considers the layout, management of materials, flexibility, training, working conditions, and teamwork, as well as the historical reasons for adopting the coach‐built assembly principle. Surmises that the new plant has advantages in assembly cost, ergonomics and working conditions, and flexibility over conventional line assembly plants.
Keywords
Citation
(1990), "Isolated or out in front", Integrated Manufacturing Systems, Vol. 1 No. 1, pp. 22-24. https://doi.org/10.1108/EUM0000000002042
Publisher
:MCB UP Ltd
Copyright © 1990, MCB UP Limited