ACC Limited: Project 30-30
Publication date: 2 September 2011
Abstract
ACC Limited, under Project 30-30, had targeted to produce and sell 30 million tons (mt) of cement in the year 2011. In May 2011, the Head of Central Logistics had found the target of the project to have become increasingly difficult to achieve. He believed that to sell 30 mt of cement, 30 mt had to be transported, thereby, advancing the role of the logistics function from that of a mere facilitator to a critical actor. As possible opportunities to increase sales, issues at the Bulk Cement Corporation (India) Limited (BCCI), and the plant at Wadi are being discussed in the case. The head of BCCI had raised concerns about the decreased logistical capacity of BCCI post a mandate from the Indian Railways on transporting 58-wagon rakes against 41-wagon rakes. A common belief was that with more wagons per rake, the quantity transited from Wadi would be higher. However, this was not the case and a capacity addition was being proposed. The President of Wadi Cluster had expressed that as an effort to reduce the transit time between Wadi and BCCI, priority was given to loading for BCCI. Though an improvement was observed with the introduction of 58 wagons per rake, Wadi was facing issues. This had affected Wadi's ability to serve other markets. The focus of the case is on analysing the options being considered by ACC to increase market presence, logistics capacity at BCCI, and the overall throughput at Wadi.
Keywords
Citation
Mukherjee, S., Raghuram, G. and Soman, C. (2011), "ACC Limited: Project 30-30", . https://doi.org/10.1108/CASE.IIMA.2020.000136
Publisher
:Indian Institute of Management Ahmedabad
Copyright © 2011 by the Indian Institute of Management, Ahmedabad