To read this content please select one of the options below:

Manageability of stress among construction project participants

S. Thomas Ng (Department of Civil Engineering, The University of Hong Kong, Hong Kong, People's Republic of China)
R. Martin Skitmore (School of Construction Management and Property, Queensland University of Technology, Brisbane, Australia)
Tony K.C. Leung (Drainage Services Department, HKSAR Government, Wanchai, Hong Kong, People's Republic of China)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 1 June 2005

3612

Abstract

Purpose

The purpose is to report the results of research on ascertaining whether the various stakeholders in construction projects can adequately cope with the stresses they are confronting.

Design/methodology/approach

Thirty‐three stressors covering various aspects of project implementation, such as organisation policies, working relationships, communication and personal factors, are identified and the manageability of the common stressors faced by management of construction projects in Hong Kong is assessed by means of a questionnaire survey. The relationships among individual stressors are similarly examined. The extent to which stress effects combine and accumulate when related stressors coexist is also considered.

Findings

It is shown that the most difficult stressors to manage are “bureaucracy”, “lack of opportunity to learn new skills”, “work‐family conflicts” and “different view from superiors”. The results also revealed that the patterns of stress manageability differ between clients, consultants and contractors. The relationships among individual stressors are similarly examined. The extent to which stress effects combine and accumulate when related stressors coexist is also considered.

Originality/value

The research reported constitutes a significant step towards the understanding and management of potentially stressful situations and their influence on the efficiency and effectiveness of construction industry participants.

Keywords

Citation

Ng, S.T., Skitmore, R.M. and Leung, T.K.C. (2005), "Manageability of stress among construction project participants", Engineering, Construction and Architectural Management, Vol. 12 No. 3, pp. 264-282. https://doi.org/10.1108/09699980510600125

Publisher

:

Emerald Group Publishing Limited

Copyright © 2005, Emerald Group Publishing Limited

Related articles