Meeting the Challenge
Abstract
Details how in 1987, ICI initiated its KLEA programme to produce replacements for CFCs (chlorofluorocarbons); and how, by the end of 1990, ICI opened its Runcorn, UK, plant producing the refrigerant R134a. This was followed by a plant in the USA in 1992 and one in Japan in 1993. Describes how all this was made possible in such a short timescale through innovations in engineering and technology; and by breaking new frontiers within the company in terms of teamworking and the empowerment of individuals.
Keywords
Citation
Lee‐Mortimer, A. (1994), "Meeting the Challenge", World Class Design to Manufacture, Vol. 1 No. 4, pp. 16-20. https://doi.org/10.1108/09642369210063027
Publisher
:MCB UP Ltd
Copyright © 1994, MCB UP Limited