Standard data in batch production at Rank Xerox
D.S. Barrett
(Senior Industrial Engineer and MTM Instructor at Rank Xerox, Mitcheldean, Gloucestershire, UK)
581
Abstract
Explains the reasons behind, and the methodology of, a project to introduce a systematic work measurement programme based on standard data to a particular set of operations at the Rank Xerox Mitcheldean site. Points out both the successes and failings of the resultant scheme.
Keywords
Citation
Barrett, D.S. (1997), "Standard data in batch production at Rank Xerox", Work Study, Vol. 46 No. 1, pp. 9-19. https://doi.org/10.1108/00438029710155799
Publisher
:MCB UP Ltd
Copyright © 1997, MCB UP Limited