Search results

1 – 10 of over 86000
Article
Publication date: 1 September 2019

Mingliang Feng

To improve the quality of life, human-oriented smart city planning and management based on time-space behavior was studied. First, the basic theory of time-space behavior and

253

Abstract

To improve the quality of life, human-oriented smart city planning and management based on time-space behavior was studied. First, the basic theory of time-space behavior and smart city was introduced. The relationship between public participation and smart city construction planning was analyzed, and the positive and negative significance of public participation in smart city construction planning was expounded. Then, the mechanism for public participation in smart city construction planning was proposed. Finally, public participation in smart city construction planning was analyzed from the perspectives of power balance, interest coordination and safeguard measures. The results showed that public participation in smart city construction planning was an important manifestation of the realization of public democratic rights. The scientific nature and feasibility of smart city construction planning was enhanced. The smooth implementation of smart city construction planning was an important foundation for promoting smart city construction. Therefore, public participation is an important way to safeguard social public interests and build a harmonious society.

Details

Open House International, vol. 44 no. 3
Type: Research Article
ISSN: 0168-2601

Keywords

Article
Publication date: 1 March 2018

Hui Zeng

Land policy plays an important role in urban development planning. The value of land use depends on the nature and scale of urban land use. Based on this, in the study and

Abstract

Land policy plays an important role in urban development planning. The value of land use depends on the nature and scale of urban land use. Based on this, in the study and analysis, the adaptation between regional land finance and urban planning and construction was discussed. First of all, the current incoordination between the land policy and the urban planning and construction in the development of urbanization was elaborated, and the status quo of the research was analyzed; then, the coordination of the layout of the urban planning space under the land finance was analyzed; taking a small-town project as an example, the actual planning of towns was concretely analyzed, and the waterfront landscape was planned and designed, the functional utilization of the land was promoted. Regression analysis of adaptation confirmed the success of urban planning and construction.

Details

Open House International, vol. 43 no. 1
Type: Research Article
ISSN: 0168-2601

Keywords

Article
Publication date: 1 September 2017

Chenglin Dai

Countryside planning has become popular due to the improvement in the economic level of China. A rural construction planning permission system is an important means to guide and

Abstract

Countryside planning has become popular due to the improvement in the economic level of China. A rural construction planning permission system is an important means to guide and standardize village construction. Therefore, this study investigates the current condition of rural planning in Guangdong and the general condition of Guangdong Province. Village planning problems, such as the village theory, lack of characteristics, and lack of coordination, are also presented. The bottleneck of the construction village planning permission system is presented. A “three-step” strategy and mode transformation (i.e., legal, personalized, and independent steps) is established based on the analysis of the Guangdong rural planning problems. Finally, the general requirements for village construction under the permission system are proposed along with the study of the village planning in Guangdong, which is the representative case. Therefore, this study provides a reference for the effective linkage between village planning and the rural construction planning permission system.

Details

Open House International, vol. 42 no. 3
Type: Research Article
ISSN: 0168-2601

Keywords

Article
Publication date: 4 October 2022

Ali Rashidi, Wei Yin Yong, Duncan Maxwell and Yihai Fang

The construction industry has actively attempted to tackle the low-productivity issues arising from inefficient construction planning. It is imperative to understand how…

Abstract

Purpose

The construction industry has actively attempted to tackle the low-productivity issues arising from inefficient construction planning. It is imperative to understand how construction practitioners perceive technology integration in construction planning in light of emerging technologies. This study intended to uncover unique experimental findings by integrating 4D-building information modelling (BIM) to virtual reality (VR) technology during construction planning among construction professionals at light steel framing (LSF) projects.

Design/methodology/approach

The building industry participants were invited to provide inputs on two different construction planning methods: conventional and innovative methods. The conventional method involved the participants using traditional platforms such as 2D computer-aided design (CAD) and physical visualisation of paper-based construction drawings for the LSF assembly process with a Gantt Chart tool to complete construction planning-related tasks for the targeted project. Comparatively, participants are required to perform the same tasks using more innovative platforms like 4D-BIM in a VR environment.

Findings

A Charrette Test Method was used to validate the findings, highlighting an improvement in usability (+10.3%), accuracy (+89.1%) and speed (+30%) using 4D BIM with VR compared to the conventional paper-based method. The findings are also validated by a paired t-test, which is supported by the rationality of the same findings. This study posits positive results for construction planning through the utilisation of modern practices and technologies. These findings are significant for the global construction industry facing low productivity issues, delays and certainty in terms of building delivery timelines due to poor construction planning.

Originality/value

This new blend of technologies—combining 4D BIM and VR in industrialised construction projects—potentially directs future initiatives to drive the efficiency of construction planning in the building lifecycle. The interactive BIM-based virtual environment would purposefully transform construction planning practices in order to deliver modern and more certain building construction methods with a focus on prefabrication processes.

Article
Publication date: 1 June 2021

Okechukwu Bruno-Kizito Nwadigo, Nicola Naismith, Ali GhaffarianHoseini, Amirhosein GhaffarianHoseini and John Tookey

Dynamic planning and scheduling forms a widely adopted smart strategy for solving real-world problems in diverse business systems. This paper uses deductive content analysis to…

Abstract

Purpose

Dynamic planning and scheduling forms a widely adopted smart strategy for solving real-world problems in diverse business systems. This paper uses deductive content analysis to explore secondary data from previous studies in dynamic planning and scheduling to draw conclusions on its current status, forward action and research needs in construction management.

Design/methodology/approach

The authors searched academic databases using planning and scheduling keywords without a periodic setting. This research collected secondary data from the database to draw an objective comparison of categories and conclusions about how the data relates to planning and scheduling to avoid the subjective responses from questionnaires and interviews. Then, applying inclusion and exclusion criteria, we selected one hundred and four articles. Finally, the study used a seven-step deductive content analysis to develop the categorisation matrix and sub-themes for describing the dynamic planning and scheduling categories. The authors used deductive analysis because of the secondary data and categories comparison. Using the event types represented in a quadrant mapping, authors delve into where, when, application and benefits of the classes.

Findings

The content analysis showed that all the accounts and descriptions of dynamic planning and scheduling are identifiable in an extensive research database. The content analysis reveals the need for multi-hybrid (4D BIM-Agent based-discrete event-discrete rate-system dynamics) simulation modelling and optimisation method for proffering solutions to scheduling and planning problems, its current status, tools and obstacles.

Originality/value

This research reveals the deductive content analysis talent in construction research. It also draws direction, focuses and raises a question on dynamic planning and scheduling research concerning the five-integrated model, an opportunity for their integration, models combined attributes and insight into its solution viability in construction.

Details

Smart and Sustainable Built Environment, vol. 11 no. 4
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 14 December 2021

SeyedReza RazaviAlavi and Simaan AbouRizk

Integrating construction and site layout planning in mechanized tunnel infrastructure projects is essential due to the mutual impacts of construction planning and site layout…

Abstract

Purpose

Integrating construction and site layout planning in mechanized tunnel infrastructure projects is essential due to the mutual impacts of construction planning and site layout decisions. Simulation can incorporate site layout planning and construction planning of tunneling projects in a unified environment. However, simulation adoption by industry practitioners has remained relatively limited due to the special skills required for building and using simulation models. Therefore, this paper aims to create a simple-to-use simulation tool that supports site layout and construction operation planning of tunneling projects. This tool intends to promote the simulation application in site layout planning.

Design/methodology/approach

The current paper proposes simulation as a decision support tool (DST) to provide an integrated environment for modeling tunnel construction operations, site layout and capturing the mutual impacts. A special purpose simulation (SPS) tool was customized and developed for typical mechanized tunneling projects, by tunnel boring machines, to facilitate building the model and allow access to users with limited simulation knowledge.

Findings

The results show that the developed SPS tool is of great assistance to construction industry practitioners to analyze a variety of site layout and construction plan scenarios and make informed decisions based on its comprehensive and intuitive outputs.

Originality/value

The main contribution of this research is to promote simulation application in site layout planning of tunneling projects through the development of a simple-to-use tool, which has sufficient details for site layout planning and constraints. The developed DST enables planners to make decisions simultaneously on the site layout, other construction planning variables and identify the most efficient plan.

Details

Journal of Engineering, Design and Technology , vol. 20 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 4 September 2009

Nashwan Dawood and Sushant Sikka

Despite its benefits, the uptake of 4D planning in the construction industry is slow and therefore there is a need to demonstrate its value over traditional planning technologies…

1854

Abstract

Purpose

Despite its benefits, the uptake of 4D planning in the construction industry is slow and therefore there is a need to demonstrate its value over traditional planning technologies. The aim of this paper is to develop a novel approach that demonstrates the value of 4D tools to the construction industry.

Design/methodology/approach

The research strategy utilised draws on several social science research methods. The data collection methods employed included a literature review, an open‐ended questionnaire, surveys, semi‐structured interviews and the analysis of historical site records. The data collected were analysed using qualitative and quantitative techniques in order to identify, develop and quantify 4D‐based key performance indicators.

Findings

This paper identifies and quantifies 4D‐based key performance indicators using case study analysis. In the case studies it was found that, on average, a 17 per cent increase in planning efficiency were achieved by the use of 4D technology, while the communication efficiency measure illustrated that, on average, a 30 per cent reduction in the time used for meetings was achieved by the use of 4D planning.

Practical implications

The complexity and rapid pace of development in today's construction projects are challenging the industry to find new innovative approaches to delivering projects. 4D tools are emerging as a construction planning technology that addresses some of these challenges. 4D planning has the potential to improve the visualisation of building design and construction, but its implementation in the industry has yet to reach maturity.

Originality/value

The paper highlights technology that enables clients, contractors, planners and sub‐contractors to visualise and understand design and scheduling issues at the early stages of a project.

Details

Engineering, Construction and Architectural Management, vol. 16 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 January 2014

Abdullah O. AlSehaimi, Patricia Tzortzopoulos Fazenda and Lauri Koskela

The purpose of this paper is to evaluate the effectiveness of implementing the Last Planner System (LPS) to improve construction planning practice and enhance site management in…

5096

Abstract

Purpose

The purpose of this paper is to evaluate the effectiveness of implementing the Last Planner System (LPS) to improve construction planning practice and enhance site management in the Saudi construction industry.

Design/methodology/approach

LPS was implemented in two large state-owned construction projects through an action research process. The data collection methods included interviews, observations and a survey questionnaire.

Findings

The findings identify benefits including improved construction planning, enhanced site management and better communication and coordination between the parties involved. The paper describes the critical success factors for LPS implementation. The paper also describes barriers to the realisation the full potential of LPS, including the involvement of many subcontractors and people's commitment and attitude to time.

Research limitations/implications

The work reported in this paper is limited to two case studies.

Practical implications

The study has thus contributed to improving management practice and may aid the establishment of a basis for the development of further research in the area of lean construction. The research outcomes can inform practitioners of the opportunity to implement alternative management methods in construction, and give a good account of the opportunities and challenges. Beside the direct benefits to managerial practice, the study also contributed to practice by offering practical recommendation that can assist in the achievement of the full potential of lean and LPS in Saudi Arabia.

Originality/value

This is the first comprehensive academic study in the Saudi construction sector concerning the application of lean construction principles and techniques. The study has thus contributed to practice and developed a basis for the development of further research in the area of lean construction. It may help construction organisations to establish a new strategy and policies to improve their managerial practice. The outcomes of the case studies can be used as a reference for organisations seeking to improve their managerial practice.

Details

Engineering, Construction and Architectural Management, vol. 21 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 March 2021

Sina Mohammadi, Mehdi Tavakolan and Banafsheh Zahraie

This paper proposes an innovative intelligent simulation-based construction planning framework that introduces a new approach to simulation-based construction planning.

Abstract

Purpose

This paper proposes an innovative intelligent simulation-based construction planning framework that introduces a new approach to simulation-based construction planning.

Design/methodology/approach

In this approach, the authors developed an ontological inference engine as an integrated part of a constraint-based simulation system that configures the construction processes, defines activities and manages resources considering a variety of requirements and constraints during the simulation. It allows for the incorporation of the latest project information and a deep level of construction planning knowledge in the planning. The construction planning knowledge is represented by an ontology and several semantic rules. Also, the proposed framework uses the project building information model (BIM) to extract information regarding the construction product and the relations between elements. The extracted information is then converted to an ontological format to be useable by the framework.

Findings

The authors implemented the framework in a case study project and tested its usefulness and capabilities. It successfully generated the construction processes, activities and required resources based on the construction product, available resources and the planning rules. It also allowed for a variety of analyses regarding different construction strategies and resource planning. Moreover, 4D BIM models that provide a very good understanding of the construction plan can be automatically generated using the proposed framework.

Originality/value

The active integration between BIM, discrete-event simulation (DES) and ontological knowledge base and inference engine defines a new class of construction simulation with expandable applications.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 November 2017

Barry J. Gledson and David Greenwood

British construction industry KPI data collected over recent years shows a trend in projects exceeding their time schedules. In 2013, the UK Government set a target for projects…

3766

Abstract

Purpose

British construction industry KPI data collected over recent years shows a trend in projects exceeding their time schedules. In 2013, the UK Government set a target for projects timeframes to reduce by 50 per cent. Proposed interventions included more rapid project delivery processes, and consistent improvements to construction delivery predictions, deployed within the framework of 4D Building Information Modelling (BIM). The purpose of this paper is to use Rogers’ Innovation Diffusion theory as a basis to investigate how this adoption has taken place.

Design/methodology/approach

In total, 97 construction planning practitioners were surveyed to measure 4D BIM innovation take-up over time. Classic innovation diffusion research methods were adopted.

Findings

Results indicated an increasing rate of 4D BIM adoption and reveal a time lag between awareness and first use that is characteristic of this type of innovation.

Research limitations/implications

Use of a non-probability sampling strategy prevents the results being generalisable to the wider construction population. Future research directions and methods are suggested, including qualitative investigations into decision-making processes around 4D BIM, and case studies exploring the consequences of 4D BIM adoption.

Practical implications

Recommendations of how to facilitate the adoption of 4D BIM innovation are proposed, which identify the critical aspects of system compatibility and safe trialling of the innovation.

Originality/value

This paper reinforces 4D BIM as an innovation and records its actual UK industry adoption rate using an accepted diffusion research method. By focusing on UK industry-wide diffusion the work also stands apart from more typical research efforts that limit innovation diffusion exploration to individual organisations.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 86000